  1. Excavation & Site Work
    With a Cat 315 and D4 dozer, and rookie operator with promise, going down to 16'-20' max depth pond roughly 140'x90' how long do you estimate it will take? The dirt is being pushed about 250' to begin to create a 305' long berm for site block. Likely 10'-15' hugh before its all said and done...
  2. Excavation & Site Work
    Im a contractor thats dug everything there is... Except a pond. I want to put one in my back yard. I have a low, very wet area in the back part of my lawn which is about 200 by 100, so i was thinking of making the pond about 120 by 80 or so... There is a wet area in a nearby field that never...