Contractor Talk - Professional Construction and Remodeling Forum banner

mapei

  1. Remodeling Picture Post
    I'm starting my largest project since being self-employed. Personally, I'm working on the kitchen, powder room, laundry room, hall bath and master bath. I'm GC'ing most of the rest. I'm starting in the kitchen. Before:
  2. Flooring Picture Post
    Dang, I'm ready for a nice big floor job :laughing: Redoing shower: Tub surround: Floor: https://lh4.googleusercontent.com/-rQsBfuS2fsg/TrWrXlJIl4I/AAAAAAAABak/DKZrn_Nk7DA/s640/2011-11-03%2B09.23.15.jpg
  3. Flooring Picture Post
    Day #1 Rough plumbing inspected and passed. I used Mapei Topcem Premix to fill the areas that will be tiled so I didn't have to wait 28 days. Ran for faux rebar into the existing slab and brushed some admix to prep. the Topcem was dried in about 4 hours! Awaiting the framers....
  4. Flooring Picture Post
    Started a remodel of a big powder into a small full bath. For some reason the "before" pics I took didn't save to my phone. Kinda Before: Started adding ply to the floor: Someone else hung the CBU already. Of course, I had to pull it all down, plumb the wall and hang it again: Facing...
Top