helical piers
1-2 of 2 Results
  1. Excavation & Site Work Picture Post
    During construction of the building the intermediate pilings and grade beams called for on the structural drawings were excluded. The floating pier and footings that were installed had settlement of as much as 6”. In addition, the right front corner of the house and masonry fireplace had 1” of...
  2. Construction
    We are looking at a potential project where the architect/engineer has drawn the foundation for the proposed addition poured up against the 100+ year old brick foundation and dowelled together at regular intervals. The fact that the new foundation wall sits two feet lower than old means the old...