Contractor Talk - Professional Construction and Remodeling Forum banner

cr6

  1. Excavation & Site Work
    We are in the process of putting in a riding arena that consists of digging out a foot of topsoil to get to a solid base of clay, then filling in with about 8 inches of CR 6/crusher run/1-1/2 minus plus fines, followed by 2 inches of stone dust. A French drain will surround the perimeter. We...
Top