Contractor Talk - Professional Construction and Remodeling Forum banner

bathroom

  1. Flooring Picture Post
    Day #1 Rough plumbing inspected and passed. I used Mapei Topcem Premix to fill the areas that will be tiled so I didn't have to wait 28 days. Ran for faux rebar into the existing slab and brushed some admix to prep. the Topcem was dried in about 4 hours! Awaiting the framers....
  2. General Discussion
    Hello group, My name is Travis and I live in Lexington Kentucky. I've been contracting for four years and have worked on several residential bathrooms (except ADA). I currently have a commercial customer that needs a commercial ADA compliant bathroom for a fit up of an office space...
  3. New Member Introductions
    Hey my name is Ryan Richardson and I'm starting a bathroom remodeling company, Bathroom Builders, with a local contractor in Colorado. (Our website is bathroombuilders.com) I'm really looking forward to networking and working with contractors on this site! I invite everyone to add me on linked...
  4. Remodeling Picture Post
    Hey, just did a bathroom for a new client while his wife and he went on vacation. Here's a short back story. His wife is pregnant and their communal bathroom looks like everything came from a reuse-it store or even a landfill, so Hubby wants to remodel it cheap. Cheap and remodel just...
Top