Contractor Talk - Professional Construction and Remodeling Forum banner
f9d311af.jpg

f9d311af.jpg

  • 0
  • 0
b41530fd.jpg

b41530fd.jpg

  • 0
  • 0
a87af08f.jpg

a87af08f.jpg

  • 0
  • 0
b56bfbd3.jpg

b56bfbd3.jpg

  • 0
  • 0
b2bda38e.JPG

b2bda38e.JPG

  • 0
  • 0
3a531aae.JPG

3a531aae.JPG

  • 0
  • 0
57e2d1cd.JPG

57e2d1cd.JPG

  • 0
  • 0

TPO roof with pull down stair case and rebuilt parapet walls in Chicago

In May 2011 on Maplewood Ave. in Chicago near the Wrigleyville neighborhood, we replaced the existing roof on a 2-flat residence.This roof had 5 layers, well over the legal allowed limit of 2 layers. When the roof was torn off the ceiling was insulated with r30 of blown in Fiberglass insulation.The new roof that was installed was a fully adhered 60 mil TPO roof system with a 20-year system rating. We installed a new commercial oversized box style gutter and installed a custom oversized roof hatch with pull down stair case. As part of the project one chimney was rebuilt and the entire parapet walls were also rebuilt on this century old home.

www.reliableamerican.us 847-729-3496
There are no comments to display.

Album information

Category
Projects
Album owner
Grumpy
Date created
Item count
7
View count
359
Comment count
0
Rating
0.00 star(s) 0 ratings

Album privacy

Grumpy

Can view media items
Everyone
Can add media items
Album owner only

Share this album

Top