This was one of the most pain in the neck addition I had to do... Th main house all block construction,the previous HO was a "hack" contractor and each time he did a job and material was left over, he added a little piece of house using different materials... not to mention nothing wasaligned, I had3 different floor elevations.
But after everything was adjusted and set it came out a nice addition.