I need to install LVP flooring under trimless door casings in which the drywaller used corner bead kerfed into the door jamb. I have two things I'm trying to figure out so that I get the cleanest look possible. Keep in mind that the flooring has to run under the kerf metal because the baseboard terminates at the jamb.
For #2, I'm trying to figure out how to do this through door transitions, and also how to install under door transitions and termite exactly at a Schluter strip where it connects with tile under the door for a super clean look. It would be parallel with door when closed. Like this connection:
Here's a normal door transition that I'd just like to go through (would run parallel with door when closed).
But even more difficult to figure out is how to
- How to cut the corner bead so that it is as clean as possible (and does not pop off the drywall)?
- How to install the LVP under these transitions and still lock it into the click lock system?
For #2, I'm trying to figure out how to do this through door transitions, and also how to install under door transitions and termite exactly at a Schluter strip where it connects with tile under the door for a super clean look. It would be parallel with door when closed. Like this connection:
Here's a normal door transition that I'd just like to go through (would run parallel with door when closed).
But even more difficult to figure out is how to