I have been in residential construction for 22yrs. On my own for 8yrs. I have gone through 6 employees in the last 2yrs. I am trying to get a better understanding on what I should expect for what rate.
My thoughts.
$25 gets you a really good helper with hand tools and truck
$30 gets you a guy you can give a job and leave and have it done
$35 gets you a guy with all tools, truck, can do take off and run small projects
$40 gets you a lead that can do take offs, pick up materials, schedule, basically a foreman.
Am I off? I have been getting carpenters that can’t hang a slab door in an existing whole by themselves, takes 3 hrs for a prehung and upset at $30hr.
I had another that I had build attic access panels-1x6 frame w/ door stop and mdf panel. It took him 8hrs for 2. Was upset that I told him I wasn’t willing to pay him more than $25
I had a guy for a year @$30 and wanted a raise. I told him He wasn’t far enough along and he said he needed $35 or he was gone. He’s gone. He constantly missed the simple processes with construction but was ambitious and showed up.
Is this the new standard? When I was making $30 15yrs ago I was running the jobs and doing the work.
Am I just getting cronies or is this the norm???
Sent from my iPhone using Tapatalk Pro
My thoughts.
$25 gets you a really good helper with hand tools and truck
$30 gets you a guy you can give a job and leave and have it done
$35 gets you a guy with all tools, truck, can do take off and run small projects
$40 gets you a lead that can do take offs, pick up materials, schedule, basically a foreman.
Am I off? I have been getting carpenters that can’t hang a slab door in an existing whole by themselves, takes 3 hrs for a prehung and upset at $30hr.
I had another that I had build attic access panels-1x6 frame w/ door stop and mdf panel. It took him 8hrs for 2. Was upset that I told him I wasn’t willing to pay him more than $25
I had a guy for a year @$30 and wanted a raise. I told him He wasn’t far enough along and he said he needed $35 or he was gone. He’s gone. He constantly missed the simple processes with construction but was ambitious and showed up.
Is this the new standard? When I was making $30 15yrs ago I was running the jobs and doing the work.
Am I just getting cronies or is this the norm???
Sent from my iPhone using Tapatalk Pro