Im bidding a CVS located in a mall and Im coming across some out of my experience demo items. Its calling for some metal stairs (27 s.f.), conveyor belt system (34 s.f.) and a mezzanine (77 s.f.) to be removed. I cant figure on how big of a dumpster to get or about how long. Any advice??