Using 8 foot lengths of insulated rim board and the first one is out of level by 9 /16 ths in 8 feet.
Ten corners in the plan and the ICF blocks are high on every corner because the Foundation sub used mismatched corners to complete the job. The mismatched blocks don't snap in to the other corners properly and they sit higher than the walls.
Anybody got an easy fix for this? Shim the Rim board and all the beams/joists? Double the sill plate and drypack grout under it?
Those are the first two options that come to mind after the Sub gets fired.