First off I've never poured concrete before other then sidewalks and some short pads so my experience is a joke compared to you guys... With that said I've been in construction for over 20yrs and have done pretty much everything so I'm not to concerned with my ability's but I'm a little nervous tackling this thing.. The slopes not crazy but its a hill nonetheless, I'm figuring 3/8" rebar 2' on center and 3500psi with 4" slump.. Can I use the fiber reinforced crete instead of steel??
Here's my plan for finishing, most of it will be 13' wide so I was going to screed it, use a bull float and just broom it... sounds easy enough but I know I'm in for it...
any advice you guys could throw my way would be awesome..
btw, this is my drive and I plan to sell my house so funds are super limited to hire it out...
Here's my plan for finishing, most of it will be 13' wide so I was going to screed it, use a bull float and just broom it... sounds easy enough but I know I'm in for it...
any advice you guys could throw my way would be awesome..

btw, this is my drive and I plan to sell my house so funds are super limited to hire it out...