I get the same on the small rooms as well, less time, 30 square foot bathroom at 5bucks, 110 sq. Foot at 5 bucks, the only time i get different, is borders, the small mosaics on the mats, shower floors, etc, its 10 dollars plus my square foot price per 12x12 mosaic wall mat tile, and so on, it just depends, but you cant charge extra for floor vent and toilets, thats are job
 
I get the same on the small rooms as well, less time, 30 square foot bathroom at 5bucks, 110 sq. Foot at 5 bucks, the only time i get different, is borders, the small mosaics on the mats, shower floors, etc, its 10 dollars plus my square foot price per 12x12 mosaic wall mat tile, and so on, it just depends, but you cant charge extra for floor vent and toilets, thats are job
I have a 3x3 area by my side door that I would like you to tile. No need to bid it, I already calculated it to be $45. Let me know what day works for you.
 
I don't compete. My price is my price. Either I get jobs or I don't. I tend to land almost all referral jobs...I'm around 50% on others.

I still don't see how per sq ft can work.

All 300 sq ft floors:
#1) Subfloor needs additional layer of ply & Ditra with 12x12 grid.
#2) Subfloor is fine, needs 1/2 CBU to match adjacent hardwood, no membrane. Combo 18's, 12's & 6's.
#3) Stone over slab. 16x16
#4) NobleSeal TS over ply, 13x13 3/8" thick with mosaic boarder that is 1/4" thick.

How the hell does sq ft make any difference to the above? :blink:
 
Ill give you a situation that I've run into on full remodels where I use a sq ft price to figure my bid...
I've done a few houses w/ 1.5 bathrooms where the tub & toilet room is separate from the vanity room and there is 2 entry ways to the bathroom. I have to tile the floor in 3 to 4 phases to keep the entries open and the tub usable... there really isn't a stron way to figure hours or days when its broken up like that so I go by sq ft and just make sure it works out income wise.
 
Angus , 50 an hour plus material. On a 6x6 , one bag 253 @ 25. one bag . grout $ 20 .. 3 hrs of work .. Its same. Costumers don't like to know that we make more than doctors our accountants..
You're paying that much for 253 in SoCal?

Ouch!!!

That's about what I'm paying for 254...

And I'm not moving pallets of product either.
 
But setting tile is a task...just like shingling a roof or framing a basement. It's all about how much time it takes you to complete the task.

It might take Todd 3 days to set 300 sq ft of tile.
It might take Orlando 2 days to set the same.
It might take me 4 days.

If we all go by sq ft pricing...I'm the big loser. :sad:

The faster you set, the more you charge. (Based off a fictitious $1000 bid project) If we are all similar in operating costs and materials, Orlando is making double over me because he finishes the job twice as quick but not because he charged more for the same thing. During the 3rd and 4th days when I am finishing job #1, he's already onto job #2 making more money.

See how that works?
 