Ive seen guys sheath over the rim joist and others leave it flush with the sheathing is this a structural thing or just preferance?
Correct.:thumbsup:...most of the west coast US guys need to do for sheer value.
We start at the sill and sheath up form there horizontally with cdx.
On new houses. Additions I sheath myself. Either way, no matter who does it, the the sheathing is the same way as I said above.Joe, I thought you had a special crew come in and install the sheathing..
why do you wait until the wall is strait?It says on our I joist package that it HAS to be everlapped, Although I am the only framer that I have EVER seen do it.
Just don't nail or staple the overlapped 12" until the wall is straight:whistling