I would like some info from all of you out there. I'm trying to get an idea of length of time most of take to remodel a kitchen. My son keeps beating himself up on how long we take to finish. I know it all depends on a lot of factors, so I'll present a sample kitchen. 13x15. Install new cabinets, crown molding, and light rail remove existing soffet and patch. Install new tile floor.
Remove three foot wall (non bearing), that separates the kitchen from the breakfast room. Not much plumbing change. Same with electric just add 6 can lights. New granite countertop and tile backsplash. I know each one is different. I'm just trying to get a rough estimate of average time if the customer would want a time frame from you.
Thanks
Jerry
Remove three foot wall (non bearing), that separates the kitchen from the breakfast room. Not much plumbing change. Same with electric just add 6 can lights. New granite countertop and tile backsplash. I know each one is different. I'm just trying to get a rough estimate of average time if the customer would want a time frame from you.
Thanks
Jerry