Rules Of Thumb For Demo Work?? - Demolition - Contractor Talk

Rules Of Thumb For Demo Work??

 
Thread Tools Search this Thread Display Modes
Old 06-02-2008, 12:10 PM   #1
 
SiteGirl's Avatar
 
Join Date: Jun 2008
Posts: 15
Rewards Points: 10

Rules Of Thumb For Demo Work??


What are some rules of thumb for demo work??
SiteGirl is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 06-02-2008, 12:17 PM   #2
Pro
 
Joasis's Avatar
 
Trade: General Contractor
Join Date: Mar 2006
Location: Hennessey, Oklahoma
Posts: 9,735
Rewards Points: 1,880

Re: Rules Of Thumb For Demo Work??


Make a profit?

So what are you asking exactly?

I just went through a demo bid and have yet to see any 2 that are even close...the amount of material to remove, number of roll offs, construction of the building, concrete, depth of footings and foundations, utilities, returning site to grade.....on and on.

Advertisement

__________________
Ladwig Construction
Hennessey, Oklahoma
405 853 1563

Insulated Concrete Homes / ICF's
My Facebook Page
Joasis is offline  
The Following User Says Thank You to Joasis For This Useful Post:
Jaws (02-19-2012)
Old 06-02-2008, 12:29 PM   #3
 
SiteGirl's Avatar
 
Join Date: Jun 2008
Posts: 15
Rewards Points: 10

Re: Rules Of Thumb For Demo Work??


Im trying to bid a demo job, for the first time and Im running into, where do I start? Its about 3850 s.f. 1 story retail space. There's carpet, wallpaper, doors and (4) storefronts to be removed. I know your supposed to figure how many men, how many days, but cant figure it out...
SiteGirl is offline  
Sponsored Links
Advertisement
 
Old 06-02-2008, 04:17 PM   #4
Pro
 
Joasis's Avatar
 
Trade: General Contractor
Join Date: Mar 2006
Location: Hennessey, Oklahoma
Posts: 9,735
Rewards Points: 1,880

Re: Rules Of Thumb For Demo Work??


You will catch some grief on this topic, but I will start off by pointing out that no one can accurately tell you how to estimate this....estimating is a difficult trade to just jump into, since most estimators have been in the field long before they jump into the numbers side.

I know a guy that used to clear retail properties, which is not as much demo as you would think...he basically gave a bid to empty the area, and salvaged the fixtures for his profit.

You can try it on the "safe side" by seeing if your customer will agree to a cost plus basis......hire your labor from a temp agency so you are covered on WC and insurance, and then be on site to run the show. At the end, you add up the costs, add 10% (or whatever you agree to) and bill the customer. Take the percentage as being paid to see what it costs, and then next time, you will know how many man hours are involved in gutting a retail space. Good luck.

BTW, in the contracting business, demolition generally refers to tearing down of existing structures, not what you are doing.
__________________
Ladwig Construction
Hennessey, Oklahoma
405 853 1563

Insulated Concrete Homes / ICF's
My Facebook Page
Joasis is offline  
Old 06-02-2008, 06:02 PM   #5
Pro
 
genecarp's Avatar
 
Trade: LI,NY designer, new homes, renovation work, concre
Join Date: Mar 2008
Location: Long Island, NY
Posts: 5,425
Rewards Points: 2,000

Re: Rules Of Thumb For Demo Work??


dont hit the gas main.
__________________
genecarp is offline  
The Following User Says Thank You to genecarp For This Useful Post:
18withtools (01-28-2013)
Old 06-02-2008, 06:05 PM   #6
Professional Instigator
 
rbsremodeling's Avatar
 
Trade: Design Build Remodeling Contractor DC MD
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,872
Rewards Points: 2,000

Re: Rules Of Thumb For Demo Work??


always make sure the electrical breakers are off
__________________

rbsremodeling is offline  
Old 06-02-2008, 06:20 PM   #7
Pro
 
genecarp's Avatar
 
Trade: LI,NY designer, new homes, renovation work, concre
Join Date: Mar 2008
Location: Long Island, NY
Posts: 5,425
Rewards Points: 2,000

Re: Rules Of Thumb For Demo Work??


Locate The Water Main, Prior To Starting.
__________________
genecarp is offline  
The Following 2 Users Say Thank You to genecarp For This Useful Post:
Jaws (02-19-2012), Metro M & L (12-14-2009)
Old 06-02-2008, 06:26 PM   #8
Professional Instigator
 
rbsremodeling's Avatar
 
Trade: Design Build Remodeling Contractor DC MD
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,872
Rewards Points: 2,000

Re: Rules Of Thumb For Demo Work??


by the time someone says what's that noise?? its to late
__________________

rbsremodeling is offline  
The Following 5 Users Say Thank You to rbsremodeling For This Useful Post:
18withtools (01-28-2013), asevereid (04-15-2013), LeeChimko (02-09-2010), MasterBuilt (09-08-2012), Metro M & L (12-14-2009)
Old 06-02-2008, 06:42 PM   #9
 
sapotech101's Avatar
 
Join Date: May 2008
Posts: 17
Rewards Points: 10

Re: Rules Of Thumb For Demo Work??


make sure you squechule the dumpsters on the right times of the day or your going to have to do double the work, early day, garbage every ware or the opposite a half full dumpster because he came to early and he as to go knowing how to pack is also a most if your paying flat fee for the dumpster dont just trow stuff in there. Insulation first then drywall to compress, any lumber make sure is aling or youll lose alot of space in the box, furniture brake. Dumpsters are a big part of demo and motivated guys, if your getting guys from an agency i ussually give them a task for the day and tell them if they finish early i give them full day pay that ussually makes them want to work harder. good luck hope every thing works out

Last edited by sapotech101; 06-02-2008 at 06:44 PM. Reason: bad grammar
sapotech101 is offline  
Old 06-02-2008, 09:58 PM   #10
Professional Remodeler
 
firemike's Avatar
 
Trade: Remodeling Contractor
Join Date: Dec 2005
Location: Southeast Michigan
Posts: 2,289
Rewards Points: 1,000

Re: Rules Of Thumb For Demo Work??


Quote:
What are some rules of thumb for demo work??
Don't start at the bottom of a structure and try to work your way up....
__________________
-Mike-
Falcon Contracting
Residential - Commercial
firemike is offline  
Old 06-03-2008, 10:42 AM   #11
 
SiteGirl's Avatar
 
Join Date: Jun 2008
Posts: 15
Rewards Points: 10

Re: Rules Of Thumb For Demo Work??


Thanks!!
SiteGirl is offline  
Old 06-03-2008, 11:04 AM   #12
Pro
 
K2's Avatar
 
Trade: Colorado master electrician, EC, B-1 GC
Join Date: Jul 2005
Location: Colorado Front Range
Posts: 2,603
Rewards Points: 2,000

Re: Rules Of Thumb For Demo Work??


You should know a little about hazardous materials and what you might run into and what might be enforced. They are pretty easy around here but I would not count on it. I saw 7 state troopers unloading a truck at the dump years ago. Maybe looking for a body or maybe some illegal material... Bigger demo's might require a permit.
K2 is offline  
Old 09-11-2008, 07:39 PM   #13
 
Dmax Consulting's Avatar
 
Join Date: Jul 2008
Posts: 84
Rewards Points: 75

Re: Rules Of Thumb For Demo Work??


Great post!

I am in a similar situation and am also looking for advice.
Dmax Consulting is offline  
Old 03-03-2009, 06:22 PM   #14
Pro
 
SK Remodeling's Avatar
 
Trade: residential remodeling contractor
Join Date: Feb 2009
Location: Hollywood, FL
Posts: 236
Rewards Points: 244

Re: Rules Of Thumb For Demo Work??


Wear a mask, and gloves, watch out for nails and other sharp objects, be aware of things like bearing walls, plumbing and electrical, plan out what your going to do before you do it. Don't hurt your self.

Last edited by SK Remodeling; 03-03-2009 at 06:24 PM.
SK Remodeling is offline  
Old 03-03-2009, 06:45 PM   #15
Pro
 
knucklehead's Avatar
 
Trade: Extraordinary Carpenter
Join Date: Mar 2009
Location: Kansas City
Posts: 3,485
Rewards Points: 2,728

Re: Rules Of Thumb For Demo Work??


Just guess. thats what bidding is,right?
knucklehead is offline  
Old 03-04-2009, 09:44 PM   #16
Pro
 
Snobnd's Avatar
 
Trade: Remodeling 30+ yrs
Join Date: Jul 2008
Location: Connecticut
Posts: 4,616
Rewards Points: 5,170

Re: Rules Of Thumb For Demo Work??


Quote:
Originally Posted by knucklehead View Post
Just guess. thats what bidding is,right?
Tools tools tools- and Lots of insurance! ....Oh ya and a box of band-aid
Snobnd is offline  
Old 03-04-2009, 09:51 PM   #17
Pro
 
JDavis21835's Avatar
 
Trade: Excavation
Join Date: Feb 2009
Location: Saginaw Michigan
Posts: 408
Rewards Points: 386

Re: Rules Of Thumb For Demo Work??


I know its an old thread, but I wanted to cover a little something.

Quote:
Originally Posted by firemike View Post
Don't start at the bottom of a structure and try to work your way up....
This may be a common sense approach, but there are ways you can start at the bottom and work your way up. Heres one I worked on in Oregon. The reactor dome was over 250ft tall when we started. Did it all from the bottom.
Attached Thumbnails
Rules of Thumb for Demo work??-331083.jpg   Rules of Thumb for Demo work??-331089.jpg  
JDavis21835 is offline  
Old 03-05-2009, 03:25 PM   #18
Professional Remodeler
 
firemike's Avatar
 
Trade: Remodeling Contractor
Join Date: Dec 2005
Location: Southeast Michigan
Posts: 2,289
Rewards Points: 1,000

Re: Rules Of Thumb For Demo Work??


There is always an exception to every rule! :-) I am guessing the structure was strong enough to remain intact and self supporting as you "whittled" it down.
__________________
-Mike-
Falcon Contracting
Residential - Commercial
firemike is offline  
Old 03-05-2009, 07:14 PM   #19
General Contractor
 
greg24k's Avatar
 
Trade: New Home Construction-Additions-Remodeling
Join Date: May 2007
Location: NJ
Posts: 7,769
Rewards Points: 8,746

Re: Rules Of Thumb For Demo Work??


Quote:
Originally Posted by JDavis21835 View Post
I know its an old thread, but I wanted to cover a little something.



This may be a common sense approach, but there are ways you can start at the bottom and work your way up. Heres one I worked on in Oregon. The reactor dome was over 250ft tall when we started. Did it all from the bottom.
What about a little dynamite to soften the whole thing up and make a nice pile which is easy to scoop... that would be best the solution a case like this, unless there is some sorts of restrictions.
__________________
I never lost a cent on the jobs I didn't get!
greg24k is offline  
Old 03-05-2009, 07:43 PM   #20
Pro
 
JDavis21835's Avatar
 
Trade: Excavation
Join Date: Feb 2009
Location: Saginaw Michigan
Posts: 408
Rewards Points: 386

Re: Rules Of Thumb For Demo Work??


Well, the concrete was 3 feet thick. The interior of the building had 1/2-inch thick steel plate with 4in tall x 2in wide I beams welded to it. The beams were imbedded into the concrete wall. We would hammer out 10 feet tall sections at a time. Basically like we were making a giant core bit. We would hammer out three triangles, then at the point contacting the ground, we would hammer away at that section. With the weight of the structure above, it would slowly crumble, with help from the hammers of course. The steel inside also helped keeping the process slow and predictable.

As for dynamite. This plant had the first cooling tower to be imploded. It was up hill and far enough away to be done this way. The reactor building you see here was to close to the spent fuel casks to be imploded. They were afraid of a few issues. 1 The storage casks were literally in the shadow of the building. 2 They were afraid that the dust created would cause damage to the cooling system for those casks. 3 You see the bolt looks piece on the side of the structure. They are actually caps for a cable system. The thinking behind the cables were if for some reason there was a catastrophic failure of the reactor and an explosion happened, the cables would keep the structure mostly in tact. So those would be an issue for explosives. Top that off, the cables were coated in a grease that is supposedly a known carcinogen. We had to pull a pig behind the cable as we pulled it out of the structure. As much grease as possible had to be disposed off to a proper landfill.

Advertisement

JDavis21835 is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Side Work specwood Business 81 05-12-2009 06:19 AM
Paving Machine Rules of Thumb BlackGold Concrete & Paving 2 09-08-2007 03:33 PM
I Am Looking For Work As Labourer/contractor Helper In Toronto Remmike Help Wanted or Looking For Work 0 02-22-2007 09:28 AM
On discouraging DIY electrical work... mdshunk Electrical 52 02-18-2006 12:58 AM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?