For laying out a new home there seem to be a number of options, but who generally is responsible for that. I would prefer to hire a surveyor to stake the lot, give me offsets at the corners and set pins for the footings. What is your experience? Surveyor do this? excavator? Foundation guy? GC?
bwiab is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 02-29-2016, 12:37 PM   #2
Pro
 
dayexco's Avatar
 
Trade: entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 6,551
Rewards Points: 16

Re: Who's Responsible For SFH Layout?


Who has it in their proposal?

Typically, I want the GC to set it up, pay for it

Sent from my SCH-I545 using Tapatalk

Advertisement

dayexco is offline  
The Following 3 Users Say Thank You to dayexco For This Useful Post:
bwiab (02-29-2016), Calidecks (02-29-2016), muskoka guy (03-01-2016)
Old 02-29-2016, 12:39 PM   #3
Fire up the BBQ
 
griz's Avatar
 
Trade: GC
Join Date: Nov 2009
Location: CA
Posts: 22,337
Rewards Points: 94

Re: Who's Responsible For SFH Layout?


Location of the structure is your responsibility, however you choose to do it.
__________________
SOME JOBS JUST AREN'T WORTH DOING:
griz is offline  
The Following 2 Users Say Thank You to griz For This Useful Post:
bwiab (02-29-2016), greg24k (02-29-2016)
Sponsored Links
Advertisement
 
Old 02-29-2016, 02:07 PM   #4
General Contractor
 
greg24k's Avatar
 
Trade: New Home Construction-Additions-Remodeling
Join Date: May 2007
Location: NJ
Posts: 7,660
Rewards Points: 8,474

Re: Who's Responsible For SFH Layout?


Surveyor stakes out the lot, he will give you basement floor elevation, you figure out the size of windows you want to have and see how far you want the foundation to be above grade and figure out how deep you want to be.
Excavation guys will pretty much calculate the depth they need, but you want to make sure it's done right so you check the calculation. If its under dug it can be fixed if its over dug it could be problems.
If I got nothing to do I will spray the footprint of the foundation, if I'm busy my excavation guy will pop some stakes and mark it out.

Mason is responsible for footing layout. Carpenter responsible for framing layout. But as a GC you have be there if any questions come up, specially if you want to change something in the field the last minute and you differ from the plan, you want to let them know of the changes.
__________________
I never lost a cent on the jobs I didn't get!
greg24k is offline  
The Following User Says Thank You to greg24k For This Useful Post:
bwiab (02-29-2016)
Old 02-29-2016, 02:52 PM   #5
Contractor
 
tgeb's Avatar
 
Trade: Excavation, Foundation, Concrete
Join Date: Feb 2006
Location: Maryland
Posts: 6,410
Rewards Points: 120

Re: Who's Responsible For SFH Layout?


The GC pays the survey crew to stake the lot corners if needed, set offset stakes for the foundation, returns to set points on the footing for the foundation.

Some instances they have to stake the septic system area, limits of disturbance and even where the sediment control measures, (silt fence), are to be installed.
__________________
Tom

www.gebcon.com
tgeb is offline  
The Following User Says Thank You to tgeb For This Useful Post:
bwiab (02-29-2016)
Old 02-29-2016, 05:39 PM   #6
Stud
 
Upchuck's Avatar
 
Trade: Excavation
Join Date: Apr 2009
Location: Mass
Posts: 605
Rewards Points: 660

Re: Who's Responsible For SFH Layout?


Hire a surveyor. I had a builder tell me how easy it was to stake a foundation out. He ended up making a mistake and he had to cut 8' off the foundation and pay us to remove and then re-pour the side wall.

I will give my opinion on location and elevations if something looks off but would never assume the risk of staking.
Upchuck is offline  
The Following User Says Thank You to Upchuck For This Useful Post:
bwiab (02-29-2016)
Old 02-29-2016, 06:39 PM   #7
Pro
 
dayexco's Avatar
 
Trade: entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 6,551
Rewards Points: 16

Re: Who's Responsible For SFH Layout?


last 5 years or so, it has been common for engineering firm to gps stakes in for the dig. come back when dug, and put pins in on building corners in the hole.

that's worked well
dayexco is offline  
The Following 3 Users Say Thank You to dayexco For This Useful Post:
backhoe1 (02-29-2016), bwiab (02-29-2016), tgeb (03-01-2016)
Old 02-29-2016, 10:37 PM   #8
3 Jacks 2 Nines
 
bwiab's Avatar
 
Trade: Wannabe Homebuilder
Join Date: Mar 2006
Location: Arvada Colorado
Posts: 352
Rewards Points: 292

Re: Who's Responsible For SFH Layout?


So i found out today that there was a surveyor on board already. They completed the boundary survey and will do the staking for a small fee.

Thanks everyone.
bwiab is offline  
Old 02-29-2016, 10:53 PM   #9
Fire up the BBQ
 
griz's Avatar
 
Trade: GC
Join Date: Nov 2009
Location: CA
Posts: 22,337
Rewards Points: 94

Re: Who's Responsible For SFH Layout?


Property boundary pins/stakes are the owners responsibility.

Siting the building, elevations, offsets etc, are the GC's responsibility and I would not want anyone else responsible for it.

Don't recall a dirt guy or foundation guy not asking for it.

Engineer/Surveyor is money well spent to locate elevations, grid lines, off sets etc.....
__________________
SOME JOBS JUST AREN'T WORTH DOING:
griz is offline  
Old 03-01-2016, 02:21 PM   #10
Pro
 
muskoka guy's Avatar
 
Trade: framer/builder
Join Date: Nov 2013
Location: Muskoka Ontario
Posts: 534
Rewards Points: 558

Re: Who's Responsible For SFH Layout?


We build mostly on lakes in Muskoka. There are setbacks from the lake which have to be adhered to. Sometimes if the property isn't big there are sidelines which have to be certain distances. Better off having a surveyor mark the corners to be sure all the setbacks are met. At least you wont be responsible when it turns out too close to something its not supposed to be. Money well spent. The general usually pays for the survey.
muskoka guy is offline  
Old 03-03-2016, 09:03 PM   #11
Member
 
JDEERE's Avatar
 
Trade: Sitework
Join Date: Feb 2015
Posts: 53
Rewards Points: 148

Re: Who's Responsible For SFH Layout?


In 30+ years of doing excavation, I have never had a surveyor layout a residential house for us. We do a lot of our own site, drainage, septic and shoreland design, so layout is not a problem. We do not do boundary surveying so on rare occasions if there is any question about the property line location we'll have a surveyor do that. In the Northeast, a lot of site work companies of any size usually have there own layout guy. I just finished a total station & GPS class and their were 22 company layout guys their doing everything from houses to major road jobs.

Last edited by JDEERE; 03-03-2016 at 09:07 PM. Reason: their not there
JDEERE is offline  
Old 03-05-2016, 12:57 PM   #12
Vagitarian
 
rino1494's Avatar
 
Trade: site and utility contractor
Join Date: Jan 2006
Location: Dallas, PA
Posts: 3,589
Rewards Points: 2,388

Re: Who's Responsible For SFH Layout?


Quote:
Originally Posted by JDEERE View Post
In 30+ years of doing excavation, I have never had a surveyor layout a residential house for us. We do a lot of our own site, drainage, septic and shoreland design, so layout is not a problem. We do not do boundary surveying so on rare occasions if there is any question about the property line location we'll have a surveyor do that. In the Northeast, a lot of site work companies of any size usually have there own layout guy. I just finished a total station & GPS class and their were 22 company layout guys their doing everything from houses to major road jobs.


Same here, we do all of the layout. On small lots where set-backs are critical, we will stretch out strings and make sure everything is within set-backs. On larger lots where set-backs are not an issue, we typically meet with owner/gc and discuss house placement. As far as setting elevations, we will give our opinions and the final say comes from owner/gc.

All of my contracts include backfilling with excavated material. Any excess material that needs to be imported or exported will incur additional costs above and beyond original estimate.
__________________
Life is hard. It is harder when you are stupid

Uncle Sam wants YOU....to speak ENGLISH
rino1494 is offline  
The Following User Says Thank You to rino1494 For This Useful Post:
mattg2448 (03-06-2016)
Old 03-05-2016, 02:17 PM   #13
Talking Head
 
EthanB's Avatar
 
Trade: Poking Things With Sticks
Join Date: Sep 2011
Location: Rhode Island
Posts: 5,343
Rewards Points: 344

Re: Who's Responsible For SFH Layout?


I've seen two multi-million dollar houses built over boundary lines this year. That's the kind of mistake you don't ever want to make.
__________________
Quote:
Originally Posted by Jaws View Post
Planer.....
EthanB is offline  
The Following User Says Thank You to EthanB For This Useful Post:
Fouthgeneration (03-05-2016)
Old 03-05-2016, 07:45 PM   #14
Member
 
JDEERE's Avatar
 
Trade: Sitework
Join Date: Feb 2015
Posts: 53
Rewards Points: 148

Re: Who's Responsible For SFH Layout?


Quote:
Originally Posted by EthanB View Post
I've seen two multi-million dollar houses built over boundary lines this year. That's the kind of mistake you don't ever want to make.
Ouch! I think they need a new layout guy.
JDEERE is offline  
Old 03-05-2016, 09:05 PM   #15
Stud
 
Upchuck's Avatar
 
Trade: Excavation
Join Date: Apr 2009
Location: Mass
Posts: 605
Rewards Points: 660

Re: Who's Responsible For SFH Layout?


Quote:
Originally Posted by rino1494 View Post
Same here, we do all of the layout. On small lots where set-backs are critical, we will stretch out strings and make sure everything is within set-backs. On larger lots where set-backs are not an issue, we typically meet with owner/gc and discuss house placement. As far as setting elevations, we will give our opinions and the final say comes from owner/gc.

All of my contracts include backfilling with excavated material. Any excess material that needs to be imported or exported will incur additional costs above and beyond original estimate.
Some GC's and most homeowners have no clue about elevations. Around here people need to hire surveyor for plot plan and as built for towns so might as well have him do layout. There is a surveyor I refer that will do plot plan, layout and as built for under $300-$500. Bigger firms charge much more.
Upchuck is offline  
Old 03-09-2016, 09:02 PM   #16
Vagitarian
 
rino1494's Avatar
 
Trade: site and utility contractor
Join Date: Jan 2006
Location: Dallas, PA
Posts: 3,589
Rewards Points: 2,388

Re: Who's Responsible For SFH Layout?


Quote:
Originally Posted by Upchuck View Post
Some GC's and most homeowners have no clue about elevations. Around here people need to hire surveyor for plot plan and as built for towns so might as well have him do layout. There is a surveyor I refer that will do plot plan, layout and as built for under $300-$500. Bigger firms charge much more.
Trust me, I know. I have spent countless hours with owners and GC's going over house placement and elevations. I give my opinion and explain everything to them and let them make the final call. That way if there is excess material to be imported/exported or if their driveway is too steep, then they are aware of it ahead of time.

I have dealt with many surveyors and engineers that do not know anything about house placement and elevations either.
__________________
Life is hard. It is harder when you are stupid

Uncle Sam wants YOU....to speak ENGLISH
rino1494 is offline  
The Following User Says Thank You to rino1494 For This Useful Post:
raldous (11-30-2016)
Old 03-21-2016, 11:54 PM   #17
3 Jacks 2 Nines
 
bwiab's Avatar
 
Trade: Wannabe Homebuilder
Join Date: Mar 2006
Location: Arvada Colorado
Posts: 352
Rewards Points: 292

Re: Who's Responsible For SFH Layout?


Well... one of four ain't bad. Surveyor will be coming back out to set the corners. Gonna have shoring on the property line, both sides. Don't want to mess that up. Thank you all for your insight!
Attached Thumbnails
Who's Responsible for SFH Layout?-20160313_105016_resized_1.jpg   Who's Responsible for SFH Layout?-20160313_105023_resized_1.jpg  

Advertisement

bwiab is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Does anyone have any ideas for this Master bath layout? I'm stumped... rdr8887 Architecture & Design 48 04-01-2015 05:12 PM
Sketchup + layout for residential home drawings. JT Wood Drafting & CAD Forum 13 02-12-2014 05:03 PM
Radiant Heat Layout HeyGuiher HVAC 7 01-08-2014 01:49 PM
Help with basement layout please canuck88 Remodeling 6 03-28-2013 03:46 PM
Framing Layout and Blueprint Reading - Seeking Advice and Tips for Beginners Workin Kid Framing 49 02-27-2013 12:54 PM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?