Old 12-24-2013, 12:00 AM   #21
Fire up the BBQ
 
griz's Avatar
 
Trade: GC
Join Date: Nov 2009
Location: CA
Posts: 21,881
Rewards Points: 2,630

Re: Pouring Footings Without Pumping?


Quote:
Originally Posted by CarpenterSFO View Post
Around here, at least for small residential work, the pump is an independent contractor. On a trailer, shows up at the same time as the first truck. I just take the guy recommended by the concrete plant.
Same here.

Grout Pump, Line Pump or Boom are all independent guys.

I just tell the batch plant who I want to use or ask who is available & they set it up.
__________________
SOME JOBS JUST AREN'T WORTH DOING:
griz is online now  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 12-24-2013, 06:43 AM   #22
designer + carpenter
 
NINZAN STUDIO's Avatar
 
Trade: carpentry
Join Date: Jan 2012
Location: FL
Posts: 556
Rewards Points: 510

Re: Pouring Footings Without Pumping?


Quote:
Originally Posted by CarpenterSFO View Post
Around here, at least for small residential work, the pump is an independent contractor. On a trailer, shows up at the same time as the first truck. I just take the guy recommended by the concrete plant.
Likewise here. Pump truck is independent business.
Attached Thumbnails
Pouring Footings Without Pumping?-image-1355495016.jpg  
NINZAN STUDIO is offline  
Old 12-25-2013, 09:44 PM   #23
Pro
 
cdkyle's Avatar
 
Trade: Concrete & General Construction
Join Date: Jul 2009
Location: The Heartland of the United States of America
Posts: 700
Rewards Points: 538

Re: Pouring Footings Without Pumping?


cdkyle is online now  
The Following 2 Users Say Thank You to cdkyle For This Useful Post:
JDavis21835 (12-26-2013), procrpntr (12-29-2013)
Sponsored Links
Advertisement
 
Old 12-27-2013, 07:30 AM   #24
Head Grunt
 
woodchuck2's Avatar
 
Trade: Electrical Contractor&Home Maintenance
Join Date: Feb 2008
Location: North Creek, NY/Lower Adirondacks
Posts: 3,270
Rewards Points: 2,196

Re: Pouring Footings Without Pumping?


Any reason why the trucks cannot get access to the back side or at least the possibility of it? Then you could run two lines of trucks,one in front and one in back. The guys around here i have worked with are very accommodating for the most part. Some drivers are weenies and want to stay back 12-15'' from the hole to the point they cannot even see in and i have worked with some guys who will drive over trees, boulders and drive right up to the hole to the point i am nervous. It also depend on soil conditions too. Sandy and they keep back, but a lot of rocks and those guy will all but drive the truck in the hole to help yah.
woodchuck2 is offline  
Old 12-28-2013, 08:15 PM   #25
Pro
 
TimNJ's Avatar
 
Trade: Remodeler
Join Date: Sep 2005
Posts: 6,049
Rewards Points: 4,634

Re: Pouring Footings Without Pumping?


The redi mix company I deal with has a conveyor truck. Gets you out pretty far, especially if you were used to adding chute extensions. Sometimes by the time you are at the end of the chute you have to pull the concrete out because the chute is almost flat. Conveyor can be flat or even going uphill and still move the concrete for you.
There was only a nominal extra charge for the truck over their regular trucks.
TimNJ is offline  
The Following User Says Thank You to TimNJ For This Useful Post:
jlsconstruction (12-28-2013)
Old 12-29-2013, 10:16 AM   #26
Vagitarian
 
rino1494's Avatar
 
Trade: site and utility contractor
Join Date: Jan 2006
Location: Dallas, PA
Posts: 3,589
Rewards Points: 2,388

Re: Pouring Footings Without Pumping?


A 25 x 45 house.... why not just wheelbarrow it. Noboby pumps footers around here, just the foundation walls. It is just not economical to pump footers. A pumper is around $800 plus you lose a yd of concrete with the pump.
__________________
Life is hard. It is harder when you are stupid

Uncle Sam wants YOU....to speak ENGLISH
rino1494 is offline  
The Following 2 Users Say Thank You to rino1494 For This Useful Post:
jomama (12-31-2013), rustyjames (12-29-2013)
Old 12-29-2013, 01:26 PM   #27
Member
 
procrpntr's Avatar
 
Trade: carpentry
Join Date: Nov 2013
Location: humboldt county california
Posts: 49
Rewards Points: 27

Re: Pouring Footings Without Pumping?


Plus an experienced pump operator can lay it down just right and it saves your rod guys some work......also saves spillage on str8 footing pour.
procrpntr is offline  
Old 12-29-2013, 03:26 PM   #28
Pro
 
FSCROB's Avatar
 
Trade: General Contracting, Metal roofing
Join Date: Aug 2013
Location: Detroit
Posts: 301
Rewards Points: 252

Re: Pouring Footings Without Pumping?


I used a pump on every pour I did in DC because it only cost $500. In the Detroit area the pumps start at $1,000. Most jobs in this area don't have that kind of extra money in them. Skid steers are the best alternative. Don't forget the vibrators. All foundations and footings need to be vibrated if they aren't pumped.
FSCROB is offline  
Old 12-29-2013, 11:30 PM   #29
Pro
 
muskoka guy's Avatar
 
Trade: framer/builder
Join Date: Nov 2013
Location: Muskoka Ontario
Posts: 534
Rewards Points: 558

Re: Pouring Footings Without Pumping?


We pump all our footings. Sometimes if the site has too many trees we have to use a line pump instead of a boom. If no pumps are available in your area, how about a small crane boom with a cement hopper. That's how we used to do it before line pumps became popular.
muskoka guy is offline  
Old 01-03-2014, 08:19 PM   #30
Pro
 
fjn's Avatar
 
Trade: mason
Join Date: Aug 2011
Posts: 5,071
Rewards Points: 10,836

Re: Pouring Footings Without Pumping?


Quote:
Originally Posted by muskoka guy View Post
If no pumps are available in your area, how about a small crane boom with a cement hopper. That's how we used to do it before line pumps became popular.


I have a small 15 ton squirt tube crane and 4 concrete buckets 3/4 - 2 yd. We can bucket a footing almost as fast as pump. When you talk set up and clean up we are faster. The 2 buckets are the key,when one is discharging the other is filling.
fjn is offline  
Old 01-07-2014, 06:52 PM   #31
Forming and Framing
 
FramingPro's Avatar
 
Trade: Shell builder
Join Date: Jan 2010
Location: Toronto
Posts: 6,273
Rewards Points: 3,582

Re: Pouring Footings Without Pumping?


Lets just say, i would not advise it
__________________
Im after fortune and frame

http://www.proicf.com
http://instagram.com/instagrauds
FramingPro is offline  
Old 05-31-2014, 09:44 PM   #32
Pro
 
wellbuilt home's Avatar
 
Trade: ,additions ,kitchens baths house reno
Join Date: Oct 2007
Location: NY
Posts: 172
Rewards Points: 168

Re: Pouring Footings Without Pumping?


Ive never used a pump truck .
It looks kewl but what for ?
we are talking about 11 yards of mix .
60 runs with a wheel barrow .
with 3 guys its 20 runs each every one stays in shape masons get all the girls .
With a 20' chute the guys don't have to wheel the whole job just the back 1/3
The 20' chute is great I lost mine a few years ago.
I have a 12" water pipe cut in half now 24' works ok and the crack heads don't want to scrap them .
Here the drivers will ask for a horse at the end of the chute, and wont move it full of mix .
Most drivers will know how close to get to the diggings
I like to stay back about the depth of the hole 8' deep 8' out.
We mite dump half the truck then move back 4'
Ive poured thousands of yards off the back of a truck .
Most of the time the trucks would stay in the street and we would push from there . Up the drive way, around the house , into the footing and pour
We would fill the footing with 30" of concrete so every job was 10+ yards .
I do have a 1/2 yard bucket for my excavator but don't use it much
I hate getting concrete on the skid steer .
just wheel it it good for you .
wellbuilt home is offline  
The Following 2 Users Say Thank You to wellbuilt home For This Useful Post:
rescraft (06-08-2014), rino1494 (06-01-2014)
Old 07-12-2014, 12:04 PM   #33
Pro
 
owattabuilder's Avatar
 
Trade: general
Join Date: Sep 2013
Location: Owatonna, MN
Posts: 132
Rewards Points: 278

Re: Pouring Footings Without Pumping?


One of the redi mix companies around here has standard redi mix trucks with 30 to 45' conveyors mounted on the back. They work great for a lot of pours.
owattabuilder is offline  
Old 07-12-2014, 03:03 PM   #34
I'm The BOSS
 
jaydee's Avatar
 
Trade: builder / remodeler
Join Date: Mar 2014
Location: Spencer, Ma
Posts: 1,904
Rewards Points: 4,733

Re: Pouring Footings Without Pumping?


How about an excavator +
Attachment 115410

It sounds like you like to work harder than you need to.
__________________
We'll give your home a NEW IMAGE
New Image Construction & Design
New image Construction.com
Facebook

Last edited by jaydee; 06-10-2015 at 09:10 PM.
jaydee is offline  
Old 07-12-2014, 09:38 PM   #35
Pro
 
NYCB's Avatar
 
Trade: Concrete/Masonry
Join Date: Sep 2010
Location: Central NY
Posts: 1,678
Rewards Points: 420

Re: Pouring Footings Without Pumping?


Quote:
Originally Posted by TimNJ View Post
The redi mix company I deal with has a conveyor truck. Gets you out pretty far, especially if you were used to adding chute extensions. Sometimes by the time you are at the end of the chute you have to pull the concrete out because the chute is almost flat. Conveyor can be flat or even going uphill and still move the concrete for you.
There was only a nominal extra charge for the truck over their regular trucks.
Same here, costs about $150 and can run out a little over 40 ft.

I use it constantly, poured a footer and a set of steps with it last week.
NYCB is offline  
Old 07-12-2014, 09:40 PM   #36
Pro
 
NYCB's Avatar
 
Trade: Concrete/Masonry
Join Date: Sep 2010
Location: Central NY
Posts: 1,678
Rewards Points: 420

Re: Pouring Footings Without Pumping?


Quote:
Originally Posted by wellbuilt home View Post
Ive never used a pump truck .
It looks kewl but what for ?
we are talking about 11 yards of mix .
60 runs with a wheel barrow .
with 3 guys its 20 runs each every one stays in shape masons get all the girls .
With a 20' chute the guys don't have to wheel the whole job just the back 1/3
The 20' chute is great I lost mine a few years ago.
I have a 12" water pipe cut in half now 24' works ok and the crack heads don't want to scrap them .
Here the drivers will ask for a horse at the end of the chute, and wont move it full of mix .
Most drivers will know how close to get to the diggings
I like to stay back about the depth of the hole 8' deep 8' out.
We mite dump half the truck then move back 4'
Ive poured thousands of yards off the back of a truck .
Most of the time the trucks would stay in the street and we would push from there . Up the drive way, around the house , into the footing and pour
We would fill the footing with 30" of concrete so every job was 10+ yards .
I do have a 1/2 yard bucket for my excavator but don't use it much
I hate getting concrete on the skid steer .
just wheel it it good for you .
I would rather pay the $150 for the conveyor than 3 guys to run barrows and make a mess.

I stay in good enough shape without having to hump concrete too.
NYCB is offline  
Old 07-13-2014, 02:06 AM   #37
GC/carpenter
 
Calidecks's Avatar
 
Trade: Decking, Railing, Carpenter/General Contractor
Join Date: Nov 2011
Location: Anaheim Hills, California (OC)
Posts: 36,973
Rewards Points: 19,962

Re: Pouring Footings Without Pumping?


I just order the pump right from the concrete company. They farm it out, but if the pump guy phucks anything up is on the concrete company.
Calidecks is offline  
The Following User Says Thank You to Calidecks For This Useful Post:
CarpenterSFO (07-13-2014)
Old 07-13-2014, 08:07 AM   #38
Designer/Contractor
 
Rio's Avatar
 
Trade: General Contractor
Join Date: Oct 2009
Location: San Diego city/County, Cali
Posts: 3,162
Rewards Points: 2,118

Re: Pouring Footings Without Pumping?


Quote:
Originally Posted by Californiadecks View Post
I just order the pump right from the concrete company. They farm it out, but if the pump guy phucks anything up is on the concrete company.
Another advantage doing it this way is if the pumper's truck breaks down or something happens to them getting there the concrete company can quickly line up someone else to take their place.

Advertisement

Rio is offline  
The Following User Says Thank You to Rio For This Useful Post:
Calidecks (07-13-2014)


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Adding on to porch footings openhearth Masonry 4 11-13-2013 12:38 AM
Considerations for pouring a rather tall concrete pier? acro Construction 20 04-23-2013 09:04 PM
Pouring a sloped driveway....... TheLastDaze Concrete & Paving 42 04-19-2013 08:21 PM
Shoddy Footings What to do? paul6 Masonry 40 05-03-2010 09:30 PM
Pouring new footings??? frostbitten1 Remodeling 12 02-11-2008 09:37 AM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?