Old 12-02-2011, 11:20 AM   #1
Member
 
SlumberJack's Avatar
 
Trade: Site Work, Concrete, and Masonry
Join Date: Jun 2009
Location: Westchester - NY
Posts: 30
Rewards Points: 25

Hand Excavation Productivity


Our guys are going to be getting their hands dirty real soon (hopefully) ... we may be getting a job for Con Ed at a substation in Staten Island.

Everything must be excavated by hand. We're installing Small to Large Pile Caps and Grade Beams.

Just wondering what production you guys would imagine you'd get out of a crew if it all has to be excavated by hand... depth range up to 5' deep. Pile caps range; some are 4' square and some are 30' square. Depth to bottom of grade beams is about 4' and they're 18" wide.

Much of the excavated material needs to be stockpiled for backfill and the stockpile location is within 100' to 150' of the areas of excavation. The surplus must be hauled and disposed.

No machines; it must all be dug by hand. I was figuring a crew of around 9 or 10 men; 6 men digging and 4 men moving the material to the stockpile or loading it to be hauled away for disposal.

How many cubic yards would you guys expect each man could dig per day; or how many cubic yards do you think a crew like this could excavate per day? I was figuring somewhere around 7 bank cubic yards per each man digging; multiplied by 6 men digging is around 42 bcy per day for bidding purposes. In reality they could probably do a little more than that but these jobs tend to move slower than your typical.

Keep in mind we're hand digging because this is a Con Ed substation. There are underground utilities but the majority of the proposed areas of excavation do not have much interferences with existing lines so digging should go relatively quickly. Hoping I didn't screw the pooch on this one.

Soil content is sandy here. And I expect there will be some dewatering required in approx. 20% of the excavation area.

Last edited by SlumberJack; 12-02-2011 at 11:22 AM.
SlumberJack is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 12-02-2011, 06:15 PM   #2
Box Builder
 
Morning Wood's Avatar
 
Trade: Pretty much anything with wood and some metals
Join Date: Jan 2008
Location: Rockport, MA
Posts: 5,898
Rewards Points: 9,374

Re: Hand Excavation Productivity


Omg

Advertisement

Morning Wood is offline  
The Following 2 Users Say Thank You to Morning Wood For This Useful Post:
Jaws (12-07-2011), WNYcarpenter (12-02-2011)
Old 12-02-2011, 06:27 PM   #3
Pro
 
mbobbish734's Avatar
 
Trade: Property Preservation & Remodeling
Join Date: Apr 2011
Location: michigan
Posts: 662
Rewards Points: 500

Re: Hand Excavation Productivity


Chain gang
mbobbish734 is offline  
   
 
Old 12-02-2011, 06:28 PM   #4
Fire up the BBQ
 
griz's Avatar
 
Trade: GC
Join Date: Nov 2009
Location: CA
Posts: 20,921
Rewards Points: 318

Re: Hand Excavation Productivity


The guy running the crew won't be speaking english.
griz is online now  
The Following User Says Thank You to griz For This Useful Post:
Jaws (12-07-2011)
Old 12-02-2011, 06:30 PM   #5
Pro
 
dayexco's Avatar
 
Trade: entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 6,092
Rewards Points: 120

Re: Hand Excavation Productivity


i think your production would greatly increase.....when these grunts you have down the holes make ANY attempt to get out, quit? to taser, pepper spray them...just blast their butt. after about 3 hits? it'd be my estimation you're going to get about 15 cubic yards per shovel per hour production...this is just an assumption on my part though...your results may vary.
dayexco is offline  
The Following User Says Thank You to dayexco For This Useful Post:
Jaws (12-07-2011)
Old 12-02-2011, 07:02 PM   #6
Pro
 
Nac's Avatar
 
Trade: Concrete, masonry & excavation
Join Date: Apr 2006
Location: New Jersey
Posts: 469
Rewards Points: 324

Re: Hand Excavation Productivity


Quote:
Originally Posted by Bestimator View Post
Our guys are going to be getting their hands dirty real soon (hopefully) ... we may be getting a job for Con Ed at a substation in Staten Island.

Everything must be excavated by hand. We're installing Small to Large Pile Caps and Grade Beams.

Just wondering what production you guys would imagine you'd get out of a crew if it all has to be excavated by hand... depth range up to 5' deep. Pile caps range; some are 4' square and some are 30' square. Depth to bottom of grade beams is about 4' and they're 18" wide.

Much of the excavated material needs to be stockpiled for backfill and the stockpile location is within 100' to 150' of the areas of excavation. The surplus must be hauled and disposed.

No machines; it must all be dug by hand. I was figuring a crew of around 9 or 10 men; 6 men digging and 4 men moving the material to the stockpile or loading it to be hauled away for disposal.

How many cubic yards would you guys expect each man could dig per day; or how many cubic yards do you think a crew like this could excavate per day? I was figuring somewhere around 7 bank cubic yards per each man digging; multiplied by 6 men digging is around 42 bcy per day for bidding purposes. In reality they could probably do a little more than that but these jobs tend to move slower than your typical.

Keep in mind we're hand digging because this is a Con Ed substation. There are underground utilities but the majority of the proposed areas of excavation do not have much interferences with existing lines so digging should go relatively quickly. Hoping I didn't screw the pooch on this one.

Soil content is sandy here. And I expect there will be some dewatering required in approx. 20% of the excavation area.
Are they going to put the piles for the pile caps in by hand too? What about doing vacuum excavtion
__________________
Facebook
Nac is offline  
The Following User Says Thank You to Nac For This Useful Post:
JDavis21835 (12-02-2011)
Old 12-02-2011, 07:03 PM   #7
Pro
 
JDavis21835's Avatar
 
Trade: Excavation
Join Date: Feb 2009
Location: Saginaw Michigan
Posts: 408
Rewards Points: 386

Re: Hand Excavation Productivity


I gotta ask, why hand work? Can you not get a suck truck in the area? A lot of our clients require soft excavation on their sites. We generally find it more productive to have someone bring a truck out, and excavate that way. Since you need to stock pile, I recommend you use someone who can "air knife" with an air compressor teamed up with the vacuum truck. We have used several companies, but dollar for dollar, Badger seems to be the best. Get a hold of them, and put your crew to better use else where. http://www.badgerinc.com/
JDavis21835 is offline  
Old 12-02-2011, 10:16 PM   #8
Pro
 
pegasush's Avatar
 
Trade: Homebuilder/renovator
Join Date: Jan 2008
Location: Canada
Posts: 143
Rewards Points: 209

Re: Hand Excavation Productivity


I was at Fortress Louisburg this summer, and the museum had a display of the tools used for construction (of the original, not the reconstruction). Workers ate f-all, (bread fish and rum), used mostly wood tools.

A crew of three, with two picks, a shovel, and a wheelbarrow, were expected to move 8 1/2 m3 (about 11 cy) in an eleven hour day. Or 1/3 cy per man per hour.

If they could do it, ........
__________________
Teamwork is a lot of people doing what I say!
pegasush is offline  
Old 12-03-2011, 06:17 AM   #9
Vagitarian
 
rino1494's Avatar
 
Trade: site and utility contractor
Join Date: Jan 2006
Location: Dallas, PA
Posts: 3,589
Rewards Points: 2,388

Re: Hand Excavation Productivity


If we have alot of utilities to dig around, we use a air compressor to chisel away at the dirt. You can do this and use a vaccum truck. It is way cheaper and way faster. If you told me that I had to dig that much by had, I would tell you to go get f***ed !!!
__________________
Life is hard. It is harder when you are stupid

Uncle Sam wants YOU....to speak ENGLISH
rino1494 is offline  
The Following 3 Users Say Thank You to rino1494 For This Useful Post:
Jaws (12-07-2011), peteo (12-06-2011), ScipioAfricanus (12-03-2011)
Old 12-03-2011, 11:16 AM   #10
Member
 
SlumberJack's Avatar
 
Trade: Site Work, Concrete, and Masonry
Join Date: Jun 2009
Location: Westchester - NY
Posts: 30
Rewards Points: 25

Re: Hand Excavation Productivity


Good suggestions... what do you guys end up paying per day for the vaccuum truck and how much material does it carry?
SlumberJack is offline  
Old 12-03-2011, 11:43 AM   #11
Pro
 
Sar-Con's Avatar
 
Trade: Civil Construction, Excavation, Concrete + Forming
Join Date: Jun 2010
Location: Ontario
Posts: 842
Rewards Points: 504

Re: Hand Excavation Productivity


I think you'll find hydro-vaccing to be more reliable in this scenario due to the large volumes that need to be moved. I don't think you'll get 7cy per man per day.

You should be able to get 10-12cy per day from each truck, depending on how far the dump site and water source is.

Your local supplier should give you a better estimate on productivity, I think the capacity is 4cy or there-about before dumping.

Last edited by Sar-Con; 12-03-2011 at 11:45 AM. Reason: added content
Sar-Con is offline  
Old 12-03-2011, 12:28 PM   #12
Vagitarian
 
rino1494's Avatar
 
Trade: site and utility contractor
Join Date: Jan 2006
Location: Dallas, PA
Posts: 3,589
Rewards Points: 2,388

Re: Hand Excavation Productivity


This morning I just cleaned out inlets for a good customer of ours in their parking lot. The parking lot is stone and they get filled in from snow plowing.

Cleaned out (4) 2 x 4 inlets with a avg of 2' deep of material. Took 2 of us 3 hrs. That works out to .4 yds per man hr. I'm sure if I had to do it all day, my production rate would drop.

If you do do it by hand, you better put an ad in the paper for a steady stream of employees, because you will have a hard time getting those guys to come back a 2nd day.
__________________
Life is hard. It is harder when you are stupid

Uncle Sam wants YOU....to speak ENGLISH
rino1494 is offline  
Old 12-04-2011, 09:09 AM   #13
Pro
 
HUI's Avatar
 
Trade: Utility, sitework, and erosion control contractor
Join Date: Jan 2011
Location: Plymouth, IN
Posts: 219
Rewards Points: 178

Re: Hand Excavation Productivity


I used a vac once to excavate an elevator pit in a basement of a building. It was about 10' x 12' x 5' deep. It took us about 16 hours to complete. We were using a trailer mounted vac of 500 cfm and a 500 gal tank. All the material had to go through a 4" pipe down a hallway, up 2 flights of stairs then out the door to the vac.
HUI is offline  
Old 12-06-2011, 04:13 PM   #14
operator
 
peteo's Avatar
 
Trade: excavating, concrete, landscaping
Join Date: Jan 2011
Location: Erie, Pa
Posts: 394
Rewards Points: 518

Re: Hand Excavation Productivity


We cleaned out some vaults last year towards the end of october. each vault was about 12x8 or so and had a minimum of 6in of mud across the bottom. We used shovels, five gallon buckets and a rope. At the end of the day we all made it clear to the boss this wasnt going to fly ever again, at least not with our crew.
peteo is offline  
Old 12-06-2011, 10:23 PM   #15
Pro
 
PipeGuy's Avatar
 
Trade: underground
Join Date: Oct 2004
Location: Southeast USA
Posts: 3,265
Rewards Points: 2,000

Re: Hand Excavation Productivity


Quote:
Originally Posted by peteo View Post
...had a minimum of 6in of mud across the bottom. We used shovels, five gallon buckets and a rope. At the end of the day we all made it clear to the boss this wasnt going to fly ever again, at least not with our crew.
I had to laugh at myself when I read this. My first construction job consisted of doing just what you described for about 3 months - by myself. I wish I had a nickel for every time that backwoods NC hillbilly of a foreman of mine told me "git a bucket'n a rope and climb in the back and I'll carry y'on up to XYZ street to clean out a manhole".
I also laughed remembering a time in 1981 that my whole "pipe crew" threatened to quit because the only job the comapny had (all 12 of us including office staff, truck driver and mechanic) was building a gabion dam and we had to build it.
It's funny how different it all seems now knowing that way back then it wasn't some kind of conspiracy against my pride but just the effort of a guy who was trying to make his way in the world with a motley collection of rag tag young boys full of nothin' but beer, piss'n vinegar.
I've really come to think over the years "what's it matter what I'm doing if it pays the same as the next thing".
__________________
Fortunately I keep my feathers numbered for...for just such an emergency. -Foghorn Leghorn
PipeGuy is offline  
The Following User Says Thank You to PipeGuy For This Useful Post:
tgeb (12-07-2011)
Old 12-06-2011, 11:16 PM   #16
Pro
 
cleveman's Avatar
 
Trade: custom home building
Join Date: Dec 2007
Location: Central Iowa
Posts: 2,836
Rewards Points: 2,624

Re: Hand Excavation Productivity


I was going to say if you can get 8 yards a day out of a guy, you are doing well. And I would expect this only in the best conditions-cool temperature, fair digging, not more than 6' deep. I base this on some mechanic's pits I have dug.
cleveman is offline  
Old 12-07-2011, 12:23 AM   #17
Designer/Contractor
 
Rio's Avatar
 
Trade: General Contractor
Join Date: Oct 2009
Location: San Diego city/County, Cali
Posts: 2,897
Rewards Points: 144

Re: Hand Excavation Productivity


I think you'll be lucky to get 3-4 cu. yards a day from a worker and only that if the material is not too difficult to remove. It starts out good but as the day goes on the productivity really drops off.
Rio is offline  
The Following User Says Thank You to Rio For This Useful Post:
Jaws (12-07-2011)
Old 12-07-2011, 06:00 PM   #18
Pro
 
MSLiechty's Avatar
 
Trade: Bender Of Nails
Join Date: Sep 2010
Location: Orange County , CA
Posts: 417
Rewards Points: 428

Re: Hand Excavation Productivity


Quote:
Originally Posted by griz View Post
The guy running the crew won't be speaking english.
so true

ML
MSLiechty is offline  
Old 12-07-2011, 06:38 PM   #19
Pro
 
dayexco's Avatar
 
Trade: entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 6,092
Rewards Points: 120

Re: Hand Excavation Productivity


bestimator, quick question? you even consider the vac venue vs. jose and a spade venue? for a seasoned estimator...some of your posts make me question either your experience...or you're playing with us. most of us here aren't quite "that" naive. if your bidding/estimating experience causes you to ask these questions, and questions from your other threads you've started...let's hope the responders give you the answers you need.
dayexco is offline  
The Following 2 Users Say Thank You to dayexco For This Useful Post:
PipeGuy (12-07-2011), tgeb (12-07-2011)
Old 12-07-2011, 08:24 PM   #20
Vagitarian
 
rino1494's Avatar
 
Trade: site and utility contractor
Join Date: Jan 2006
Location: Dallas, PA
Posts: 3,589
Rewards Points: 2,388

Re: Hand Excavation Productivity


Quote:
Originally Posted by dayexco View Post
bestimator, quick question? you even consider the vac venue vs. jose and a spade venue? for a seasoned estimator...some of your posts make me question either your experience...or you're playing with us. most of us here aren't quite "that" naive. if your bidding/estimating experience causes you to ask these questions, and questions from your other threads you've started...let's hope the responders give you the answers you need.
Either way, it still keeps the forums alive and kickin and allows for some discussion from everybody. We all can learn something from each other.

Remember, there are no stupid questions, only stupid answers

Advertisement

__________________
Life is hard. It is harder when you are stupid

Uncle Sam wants YOU....to speak ENGLISH
rino1494 is offline  



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Productivity Ideas mbenike Construction 30 09-29-2012 09:05 PM
Dealing with differences of opinion on productivity. bob_cntrctr General Discussion 36 11-08-2009 05:40 AM
Did productivity go up when you got a office? ruskent Business 14 08-04-2008 01:37 PM
Estimating steel framing productivity rates dandy andy Drywall 11 07-29-2008 05:15 PM
Productivity vs Results denick Excavation & Site Work 5 03-17-2006 09:04 PM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?