Hey all.. been a long time since I've chimed in here and I hope all old and new are well..

As I end one season and start thinking of the next I always think of how we'll do it different and try to be better. As of late the bottom line has been trimmed to a nub and it seems like the only way to get anything back will be through efficiency.

The main stay of our work is paving and most of that are jobs making up a half day to 2 days worth of time. Everyone (about 12 men) comes to the yard and we start out together [with exception to truck drivers who usually come in earlier to head off to the plant or quarry for product].

I'm thinking of making some changes in how I pay guys for mobilization in and out of the sites.. Currently I pay whatever hourly rate the employee is making for all hours worked. I estimate we spend at least a half hour out and a half hour in, for mobilization every day / every job

The state says I have to pay per hour any employee in my charge but they don't say how much I must pay with exception to I have to pay at least the minimum wage... So I was thinking what if I paid each man 1 hour a day at minimum wage and the rest of the day at full wage?????

Anyone out there with crews will understand how much money this can translate into so any and all suggestions are helpful.. thanks..
__________________
Roccies Asphalt Paving
The Right Way Driveway Company
If you say you cant, your a loser. If you say you wont, your a quiter. Which one do you want to be?
Vinny is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 12-09-2013, 03:02 PM   #2
Stud
 
Upchuck's Avatar
 
Trade: Excavation
Join Date: Apr 2009
Location: Mass
Posts: 605
Rewards Points: 660

Re: Efficiency


I think you will have a bunch of unhappy employees and you may lose some. I gotta say I never envied paving guys. If you have a small crew your always scrambling and it's hard to do bigger jobs. Big crew causes problems like you have. Do you run separate crews for grading & paving?

Advertisement

Upchuck is offline  
The Following 2 Users Say Thank You to Upchuck For This Useful Post:
backhoe1 (12-09-2013), rustyjames (12-09-2013)
Old 12-09-2013, 03:33 PM   #3
Fine Handcrafted Opinions
 
Bearded Wonder's Avatar
 
Trade: General
Join Date: Jan 2011
Location: Fort Worth Tx
Posts: 950
Rewards Points: 2,422

Re: Efficiency


Is that any different than telling your guys you're cutting their pay? Or that you're going to charge them $15-$20 a day for the privilege of remaining employed? Putting it those ways doesn't sound any better.

If I was your employee and was told the first hour of the day was going to be at minimum wage, it would suck no matter how you phrased it.
Bearded Wonder is offline  
Sponsored Links
Advertisement
 
Old 12-09-2013, 04:23 PM   #4
Pro
 
bob hutson's Avatar
 
Trade: general contractor
Join Date: Mar 2013
Location: indiana
Posts: 179
Rewards Points: 247

Re: Efficiency


I dont pay ride time, but I dont have anybody do anything for free the min we get to the job pay starts.
bob hutson is offline  
Old 12-09-2013, 04:36 PM   #5
Pro
 
skillman's Avatar
 
Trade: General Contractor
Join Date: Sep 2011
Location: New York
Posts: 2,859
Rewards Points: 1,968

Re: Efficiency


Sounds like you should work on cutting staff . Or bring more work in so your not looking at penny's instead of dollars .

Last edited by skillman; 12-09-2013 at 04:49 PM.
skillman is offline  
Old 12-09-2013, 05:25 PM   #6
Pro
 
Moxley-Kidwell's Avatar
 
Trade: Excavation & Asphalt Paving
Join Date: Jan 2011
Location: Frederick, MD
Posts: 555
Rewards Points: 286

Re: Efficiency


Vinny, I feel your pain. Is there a good reason for all the guys to show up at the shop I'm assuming in the morning? Not sure how you work, do you provide everyone transportation to the job? We usually start our guys pay about half hour before we can actually start to allow them to get the machines warmed up and fuel/greased. That way at 7 sharp (that's when we are supposed to start in our developments) they can be rolling. Unfortunately they aren't making money at that time, but not much you can do. They get paid until they leave the job.

Do you set a goal/time frame at the beginning of the day for them? I find that your employees don't really know what it's going to take to make money. If we let them know what they need to get done and when it seams to give them a goal to meet. Our guys are real good, but it's just human nature sometimes not to really go after it everyday if not pushed.

Do you like your crew or do you need better people? Cutting pay at this point i think wouldn't go over too well. If you let everyone know profits are tight and we need to hustle in order not to have to cut pay it might go further. Some of your better people might have some ideas of how to get started quicker. Going straight to the job or tell everyone pay starts as soon as we get to the jobs. If you are doing multiple jobs during the same day I think you are stuck with the mob cost.
Moxley-Kidwell is offline  
Old 12-09-2013, 05:49 PM   #7
Pro
 
MTN REMODEL LLC's Avatar
 
Trade: Remodel and new build Colorado @ 7651 FT
Join Date: Sep 2010
Posts: 2,193
Rewards Points: 1,428

Re: Efficiency


Vinny.... I do understand your squeeze... it's happening alot of places... not just our trades.

Just as a technicality, your idea is not about "efficiency" (greater production with less material and/or less labor), it's about cost cutting, labor in this case.

Guess have to ask the tough question, what is your area's labor market for paving personelle. That will be at play if you cut pay.

Depending on your crews and their personalities and your relation with them, I like the above ideas as to just plain discussing with them your squeeze... and your options. (Have facts/figures on maybe a per job basis as you do them.

Maybe when one of your crew is leaving, or if you have a marginal performer, you can discuss productivity with the remaining crew, explain your options of cutting pay, or can we all cover the work with one less person. (That would be a labor productivity increase or efficiency.)

Unless your labor market is extreemly plentifull, cutting wages is difficult to do, often results in a loss of productivity.

Good luck
__________________
Never stop learning (xcep fer speling en typeing)
MTN REMODEL LLC is offline  
Old 12-09-2013, 06:52 PM   #8
Been around
 
Mr Latone's Avatar
 
Trade: Roofing
Join Date: Jan 2011
Location: Western NY
Posts: 1,138
Rewards Points: 1,608

Re: Efficiency


Your pay cutting strategy surrounds your mobilization. Work on how you can cut man hours doing that and forget trying to cut their pay.

Maybe some of your men aren't needed for mobilization and should show up at the job and go home from the job.

Look at the half day jobs and see if you can increase efficiency by tying in other tasks like maintenance.

Review your employees motivation. Some guys would be just as happy to work as not work, but they need a job so they work. These guys are the first to lose the early morning and back to shop hours.

It's a tough racket. Do an 8 hour job in 6 hours and the boss says, "Good work guys! I will pay you for 8." When the 5 hour job takes 8, you haven't the right to dock the pay. So bonuses and pay incentives need to be allocated according to a longer time frame than most employees care to understand.
__________________
Above all, a good roof
Mr Latone is offline  
The Following 2 Users Say Thank You to Mr Latone For This Useful Post:
CarpenterSFO (12-10-2013), MTN REMODEL LLC (12-09-2013)
Old 12-09-2013, 08:26 PM   #9
Pro
 
MTN REMODEL LLC's Avatar
 
Trade: Remodel and new build Colorado @ 7651 FT
Join Date: Sep 2010
Posts: 2,193
Rewards Points: 1,428

Re: Efficiency


Quote:
Originally Posted by Mr Latone View Post
Your pay cutting strategy surrounds your mobilization. Work on how you can cut man hours doing that and forget trying to cut their pay.

Maybe some of your men aren't needed for mobilization and should show up at the job and go home from the job.

Look at the half day jobs and see if you can increase efficiency by tying in other tasks like maintenance.

Review your employees motivation. Some guys would be just as happy to work as not work, but they need a job so they work. These guys are the first to lose the early morning and back to shop hours.

It's a tough racket. Do an 8 hour job in 6 hours and the boss says, "Good work guys! I will pay you for 8." When the 5 hour job takes 8, you haven't the right to dock the pay. So bonuses and pay incentives need to be allocated according to a longer time frame than most employees care to understand.

^^^
__________________
Never stop learning (xcep fer speling en typeing)
MTN REMODEL LLC is offline  
Old 12-09-2013, 09:44 PM   #10
Contractor
 
tgeb's Avatar
 
Trade: Excavation, Foundation, Concrete
Join Date: Feb 2006
Location: Maryland
Posts: 6,370
Rewards Points: 4

Re: Efficiency


Hi Vinny, good to see you again.

I feel your pain, but there is no way a two tier pay system is going to pan out well for you.

Are you heading South this winter? Maybe the sun and Bikinis will ease your mind...
__________________
Tom

www.gebcon.com
tgeb is online now  
Old 12-10-2013, 12:36 PM   #11
Captain of the Titanic
 
Vinny's Avatar
 
Trade: Asphalt Paving,Excavating, Masonry
Join Date: Jul 2007
Location: Westport, Connecticut
Posts: 708
Rewards Points: 508

Re: Efficiency


Yea Tom, gonna head to Keys on the 2nd of January for a couple of weeks.... fish back water a few days there then head up to Ft Lauderdale area for fresh water. Then I'll go back in February again... good to see you too...
__________________
Roccies Asphalt Paving
The Right Way Driveway Company
If you say you cant, your a loser. If you say you wont, your a quiter. Which one do you want to be?
Vinny is offline  
The Following User Says Thank You to Vinny For This Useful Post:
tgeb (12-10-2013)
Old 12-10-2013, 12:44 PM   #12
Captain of the Titanic
 
Vinny's Avatar
 
Trade: Asphalt Paving,Excavating, Masonry
Join Date: Jul 2007
Location: Westport, Connecticut
Posts: 708
Rewards Points: 508

Re: Efficiency


Quote:
Originally Posted by Upchuck View Post
I think you will have a bunch of unhappy employees and you may lose some. I gotta say I never envied paving guys. If you have a small crew your always scrambling and it's hard to do bigger jobs. Big crew causes problems like you have. Do you run separate crews for grading & paving?
Chuck we break down to two or three crews for prep or masonry related tasks then usually get together for asphalt install unless its small, like a hand install, in which case I'll keep one small crew on prep and use the rest for installation.

I'd love to have separate fully running prep only and pave only crews but we never seemed to have been able to muster enough work to make that work.
__________________
Roccies Asphalt Paving
The Right Way Driveway Company
If you say you cant, your a loser. If you say you wont, your a quiter. Which one do you want to be?
Vinny is offline  
Old 12-10-2013, 12:47 PM   #13
Captain of the Titanic
 
Vinny's Avatar
 
Trade: Asphalt Paving,Excavating, Masonry
Join Date: Jul 2007
Location: Westport, Connecticut
Posts: 708
Rewards Points: 508

Re: Efficiency


Quote:
Originally Posted by skillman View Post
Sounds like you should work on cutting staff . Or bring more work in so your not looking at penny's instead of dollars .
So further commoditize the business so someone else can make more money off my operation????? No thanks
__________________
Roccies Asphalt Paving
The Right Way Driveway Company
If you say you cant, your a loser. If you say you wont, your a quiter. Which one do you want to be?
Vinny is offline  
Old 12-10-2013, 12:52 PM   #14
Captain of the Titanic
 
Vinny's Avatar
 
Trade: Asphalt Paving,Excavating, Masonry
Join Date: Jul 2007
Location: Westport, Connecticut
Posts: 708
Rewards Points: 508

Re: Efficiency


Quote:
Originally Posted by ClaytonR View Post
Is that any different than telling your guys you're cutting their pay? Or that you're going to charge them $15-$20 a day for the privilege of remaining employed? Putting it those ways doesn't sound any better.

If I was your employee and was told the first hour of the day was going to be at minimum wage, it would suck no matter how you phrased it.
I agree but I'm not sure if the old way we use to do things was any better (which inevitably ran out of steam too)... We use to have foreman come in a half hour earlier beyond anyone else, and they got paid for that time to plan and get sh!t going in the AM. The rank and file troops had to be in at least 15 minutes before they're on the clock start time and they'd travel or mob the first 10 to 15 minutes of a day for free.

Of course this is not legal... but it worked for quite some time..
__________________
Roccies Asphalt Paving
The Right Way Driveway Company
If you say you cant, your a loser. If you say you wont, your a quiter. Which one do you want to be?
Vinny is offline  
Old 12-11-2013, 10:16 PM   #15
Member
 
fhdesign's Avatar
 
Trade: Construction, Landscaping
Join Date: Jan 2007
Location: Norwalk, CT
Posts: 99
Rewards Points: 75

Re: Efficiency


Great question, even though I think it would be fair, I just can't see most employees being able to understand it. I think you may have some unhappy employees that may look for ways to make up for what they feel is lost income.

Advertisement

fhdesign is offline  
The Following User Says Thank You to fhdesign For This Useful Post:
rustyjames (12-11-2013)


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Cost efficiency Lm02yn HVAC 10 11-08-2012 10:58 PM
New Guy: Energy Efficiency Contractor eecontractor New Member Introductions 1 02-22-2011 03:16 PM
Maximum efficiency framing crew size and methods UpNorth Framing 9 01-19-2011 03:17 PM
efficiency of Radiant versus convection air flashheatingand HVAC 8 04-15-2010 03:57 PM
High efficiency heating systems tcleve4911 HVAC 6 02-12-2010 09:33 AM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?