Old 06-10-2015, 09:45 AM   #21
Pro
 
BCConstruction's Avatar
 
Trade: Construction
Join Date: Jun 2009
Location: Roanoke, VA
Posts: 16,392
Rewards Points: 2,394

Re: PT Shrinkage - How Would You Handle This?


Quote:
Originally Posted by EthanB View Post
I've gone around a few weeks after framing and put hot dipped washers under some of the joists after they shrunk. It's pretty wild how much width they lose.

I had a couple on one deck that started at 9-3/4" then ended up at 9-1/8 after a few months. They were stupidly wet when they went in. I would say at least twice-3x the weight as when dry too.
__________________
www.bcconstructionllc.com
BCConstruction is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 06-10-2015, 11:11 AM   #22
Pro
 
RobertCDF's Avatar
 
Trade: Custom deck builder
Join Date: Aug 2005
Location: Colorado Springs, Colorado
Posts: 9,177
Rewards Points: 1,533

Re: PT Shrinkage - How Would You Handle This?


I haven't needed to even think about that since 2009. All my joists come the same size and stay the same size. Don't find lots of little solutions, find 1 solution that solves the real problem.
RobertCDF is offline  
The Following 2 Users Say Thank You to RobertCDF For This Useful Post:
BCConstruction (06-10-2015), Xtrememtnbiker (06-10-2015)
Old 06-10-2015, 11:23 AM   #23
John Hyatt
 
John Hyatt's Avatar
 
Trade: out door areas, decks,spa room additions,fire pits
Join Date: Jan 2007
Location: Oklahoma City
Posts: 3,658
Rewards Points: 3,910

Re: PT Shrinkage - How Would You Handle This?


Awwwwwwwwww that is so good for You Rob.

I am happy as a June bug for Ya.

J.
John Hyatt is offline  
The Following 2 Users Say Thank You to John Hyatt For This Useful Post:
Deckhead (06-10-2015), SamM (06-10-2015)
Sponsored Links
Advertisement
 
Old 06-10-2015, 11:31 AM   #24
deck aficionado
 
SelectDecks's Avatar
 
Trade: General Building
Join Date: Nov 2011
Posts: 531
Rewards Points: 973

Re: PT Shrinkage - How Would You Handle This?


Quote:
Originally Posted by Californiadecks View Post
I've told customers I will use old joists and then give them all new anyway and tell them no charge. They love it, I do this all the time. What is it, an extra 3 or 400 bucks? My average deck is about 25 - $30,000.00. It's really an irrelevant amount when you think about what headache it prevents.
Same here, doing it on a job today
__________________
------
James
www.selectdecks.com
SelectDecks is offline  
Old 06-10-2015, 11:42 AM   #25
Pro
 
RobertCDF's Avatar
 
Trade: Custom deck builder
Join Date: Aug 2005
Location: Colorado Springs, Colorado
Posts: 9,177
Rewards Points: 1,533

Re: PT Shrinkage - How Would You Handle This?


Quote:
Originally Posted by John Hyatt View Post
Awwwwwwwwww that is so good for You Rob.

I am happy as a June bug for Ya.

J.
You don't have to do it jon, no one is forcing you. It's a solution to the problem brought on by this thread, no need to get all pissy.
RobertCDF is offline  
The Following User Says Thank You to RobertCDF For This Useful Post:
BCConstruction (06-10-2015)
Old 06-10-2015, 11:53 AM   #26
I like Green things
 
WarnerConstInc.'s Avatar
 
Trade: Architectural Mill Work
Join Date: Jan 2008
Location: In a van, down by the river. Auburn, IN
Posts: 22,955
Rewards Points: 5,888

Re: PT Shrinkage - How Would You Handle This?


As much as Rob annoys me sometimes, I won't frame a deck out of wood again I will put hard wood on those steel frames though
__________________
Warner Mill Works
Facebook
YouTube
WarnerConstInc. is online now  
The Following User Says Thank You to WarnerConstInc. For This Useful Post:
BCConstruction (06-10-2015)
Old 06-10-2015, 12:12 PM   #27
Pro
 
BCConstruction's Avatar
 
Trade: Construction
Join Date: Jun 2009
Location: Roanoke, VA
Posts: 16,392
Rewards Points: 2,394

Re: PT Shrinkage - How Would You Handle This?


Quote:
Originally Posted by RobertCDF View Post
I haven't needed to even think about that since 2009. All my joists come the same size and stay the same size. Don't find lots of little solutions, find 1 solution that solves the real problem.

That's what i been running around sorting today. Been to my supplier to sort out the span tables for the joists and beams. Current 2 decks im pricing out are steel with composite so sick of wood. May be giving you a shout for advice on some stuff if you don't mind Rob. Hopefully the days of wood frames for me are gone from today.
__________________
www.bcconstructionllc.com
BCConstruction is offline  
Old 06-10-2015, 12:20 PM   #28
Pro
 
Xtrememtnbiker's Avatar
 
Trade: General Remodeling
Join Date: Jun 2013
Location: Virginia
Posts: 5,012

Re: PT Shrinkage - How Would You Handle This?


I'm wanting us to switch as well. Is there a good starting place for learning about it?
Xtrememtnbiker is offline  
Old 06-10-2015, 01:35 PM   #29
Pro
 
BCConstruction's Avatar
 
Trade: Construction
Join Date: Jun 2009
Location: Roanoke, VA
Posts: 16,392
Rewards Points: 2,394

Re: PT Shrinkage - How Would You Handle This?


I can send you what Robert sent me a while back. I have had to use a different company for the steel though but they do me the calculations for the beam spans which cemco wouldn't
__________________
www.bcconstructionllc.com
BCConstruction is offline  
Old 06-10-2015, 02:02 PM   #30
Pro
 
Fresh Decks's Avatar
 
Trade: Carpentry
Join Date: Nov 2013
Location: Regina. SK
Posts: 148
Rewards Points: 310

Re: PT Shrinkage - How Would You Handle This?


Quote:
Originally Posted by BCConstruction View Post
I can send you what Robert sent me a while back. I have had to use a different company for the steel though but they do me the calculations for the beam spans which cemco wouldn't
I'd take that info as well if you don't mind!
__________________
Shane C.
Fresh Decks - Regina, SK
http://www.freshdecks.ca
Fresh Decks is offline  
Old 06-10-2015, 03:10 PM   #31
John Hyatt
 
John Hyatt's Avatar
 
Trade: out door areas, decks,spa room additions,fire pits
Join Date: Jan 2007
Location: Oklahoma City
Posts: 3,658
Rewards Points: 3,910

Re: PT Shrinkage - How Would You Handle This?


I was just funen Ya Rob.

Like Always.

I just don't have the problems some Folks do framing with PT lumber. It's all in working with the wood not against it. But then I have been a Wood Worker most all my working life, if you don't count 2 years in the military ( like I don't ) .

All wood requires understanding. If you fight it, it will fight back.

I see Darcy going over to the thin metal framing with the back ground He has so there must be intrinsic advantages . I however will never experience them .

No Need.

J.
John Hyatt is offline  
Old 06-10-2015, 05:49 PM   #32
Artist and not a curator
 
Deckhead's Avatar
 
Trade: Carpentry,
Join Date: Dec 2010
Location: Sarasota, Florida
Posts: 10,097
Rewards Points: 270

Re: PT Shrinkage - How Would You Handle This?


Rafters going in track wouod be nice. Post 12' on center is sweet. Having to use stainless.... priceless.

I would jump on it if I was a good distance from the salt. It's in the veins though, when a man grows to love the sea he is no longer fit to live on land.

A learning curve for using metal but after getting the hang of it, it's pretty nice. Hated framing with metal at first but after time, I realized it was a lot easier on the guys and to beef up loads, going up a couple guages was easier than going parallam, extra board, shorter distance, etc. You will bleed though.
__________________
Impossible to read
Deckhead is offline  
Old 06-10-2015, 06:13 PM   #33
Pro
 
RobertCDF's Avatar
 
Trade: Custom deck builder
Join Date: Aug 2005
Location: Colorado Springs, Colorado
Posts: 9,177
Rewards Points: 1,533

Re: PT Shrinkage - How Would You Handle This?


Quote:
Originally Posted by Deckhead View Post
You will bleed though.
That's a fact. Last time I went in for a big cut and got a tetanus shot I asked the lady "this is good for 10 years right?" She replied "you should probably get another one next time you get cut on metal." I told her "ummm, that happens 5 times a day". She goes "oh ummm, maybe every 2-3 years then."
RobertCDF is offline  
The Following 2 Users Say Thank You to RobertCDF For This Useful Post:
Deckhead (06-10-2015), Xtrememtnbiker (06-10-2015)
Old 06-10-2015, 06:49 PM   #34
Pro
 
Xtrememtnbiker's Avatar
 
Trade: General Remodeling
Join Date: Jun 2013
Location: Virginia
Posts: 5,012

Re: PT Shrinkage - How Would You Handle This?


Quote:
Originally Posted by BCConstruction View Post
I can send you what Robert sent me a while back. I have had to use a different company for the steel though but they do me the calculations for the beam spans which cemco wouldn't
That would be nice. I just want to add it to the list of things to get educated on and figure out so we can try it on a deck soon.
Xtrememtnbiker is offline  
Old 06-10-2015, 08:09 PM   #35
Pro
 
CITY DECKS INC's Avatar
 
Trade: DECK BUILDER. RESIDENTIAL. COMMERCIAL
Join Date: Sep 2012
Location: PHILADELPHIA PA
Posts: 2,923
Rewards Points: 4,608

Re: PT Shrinkage - How Would You Handle This?


Quote:
Originally Posted by muskoka guy View Post
Would it be possible to strap the top of the entire deck at 12 inch centre and replace the outside rim board. Just a thought.
strapping? like tom silva does on this old house. he runs 1/3's Perpendicular to old joist. i've that on a re deck w/2x4's once. they also wanted the deck run in the other direction.
CITY DECKS INC is offline  
Old 06-10-2015, 08:17 PM   #36
GC/carpenter
 
Calidecks's Avatar
 
Trade: Decking, Railing, Carpenter/General Contractor
Join Date: Nov 2011
Location: Anaheim Hills, California (OC)
Posts: 40,494
Rewards Points: 148

Re: PT Shrinkage - How Would You Handle This?


You could always put a temp ledger to set your joists on then install your hangers after shrinkage. Most of my deck bottoms are exposed. I don't like the look of shims in the hangers. I still think the best way is to replace all of them.
Calidecks is online now  
Old 06-10-2015, 08:39 PM   #37
Pro
 
CITY DECKS INC's Avatar
 
Trade: DECK BUILDER. RESIDENTIAL. COMMERCIAL
Join Date: Sep 2012
Location: PHILADELPHIA PA
Posts: 2,923
Rewards Points: 4,608

Re: PT Shrinkage - How Would You Handle This?


Quote:
Originally Posted by Xtrememtnbiker View Post
I'm wanting us to switch as well. Is there a good starting place for learning about it?
sure spend about $300 and get load build it in your back yard or be like me and set up / broke down / set up again in our local park and leave it there for the thursday night movie or band night. took my guys to the park for practice. pulled in broke out the cordless package some concrete footing blocks, laser, rigs and went to town. a hell of a lot cheaper and easier to do it friday after lunch and take out for bier. I would only use metal if my job site weren't so challenging. Like Rob and few others here know exactly what your getting into 99% of the time. stick framed houses and wide open voids in the rear to fill.
My process would estimate. close deal get a 50ft ladder and 2-guys to help set up. This is if there is no access. shoot my laser around get all the dims including elevations through out both parapets. write up materials package pre-cut of course. 2-days later it shows up. If one guy steps on and bends I need another 2-days later it comes. if i'm off 1/inch i'm fk'd. you guys build your most of your decks based on stock / dimensional materials. I order / sell 16x16 deck framing regardless if 14.5" I'm bound by parapets / property lines it goes and on.

railing: if i could use face / rim mount all around that would push me further to make metal my go to. but i'm bound by 8" parapet wall and I can only 4" because the other 4" neighbors.

i don;t know... i'll revisit converting where i can on the next rainy day.
CITY DECKS INC is offline  
The Following 2 Users Say Thank You to CITY DECKS INC For This Useful Post:
EthanB (06-10-2015), John Hyatt (06-11-2015)
Old 06-10-2015, 09:00 PM   #38
Deck Parts Retailer
 
killerdecks's Avatar
 
Trade: deck builder
Join Date: Apr 2008
Location: Wayne Mi
Posts: 3,108
Rewards Points: 888

Re: PT Shrinkage - How Would You Handle This?


All this talk is just bunk. No matter you do to make the new wood the same height as the old wood the new wood will shrink, than all the efforts are thrown away.

Tear out the old and put in all new.

It took us 3 hrs to tear down 400 sq ft and set it by the road. Took an other 4 to reframe it. It will all move together.

I'm sure to the super pros around here we did something wrong by not taking at least a week.

You don't put new wine in an old flask and vice versa.
killerdecks is offline  
Old 06-10-2015, 09:16 PM   #39
Pro
 
CITY DECKS INC's Avatar
 
Trade: DECK BUILDER. RESIDENTIAL. COMMERCIAL
Join Date: Sep 2012
Location: PHILADELPHIA PA
Posts: 2,923
Rewards Points: 4,608

Re: PT Shrinkage - How Would You Handle This?


Quote:
Originally Posted by killerdecks View Post
All this talk is just bunk. No matter you do to make the new wood the same height as the old wood the new wood will shrink, than all the efforts are thrown away.

Tear out the old and put in all new.

It took us 3 hrs to tear down 400 sq ft and set it by the road. Took an other 4 to reframe it. It will all move together.

I'm sure to the super pros around here we did something wrong by not taking at least a week.

You don't put new wine in an old flask and vice versa.
easy killer. I just framed out 400sf 20x20 roof top yesterday. 1-3x4 landing. 3-steps. this is only with another 8ft to the edge and then 45ft to the curb. Know it did all day and hardware was finished this morning. I started another one today 200sf. demo'd yesterday. down and off site in about 3hrs. this one was only about 12ft off the ground. (New demo crew a little slow... they need a few more to get them used to demoing what there walking on. spent 1/2 day re-laying about 40 brick and tuck-pointing about 40sf due to no ledger flashing and 30 or so years of chit getting stuck behind. tomorrow I'll 200sf set up with post. Finish package comes friday morning. We also have to take multiple deliveries because we don't ave the space like you ground guys.
CITY DECKS INC is offline  
Old 06-10-2015, 09:28 PM   #40
Deck Parts Retailer
 
killerdecks's Avatar
 
Trade: deck builder
Join Date: Apr 2008
Location: Wayne Mi
Posts: 3,108
Rewards Points: 888

Re: PT Shrinkage - How Would You Handle This?


Quote:
Originally Posted by CITY DECKS INC View Post
easy killer. I just framed out 400sf 20x20 roof top yesterday. 1-3x4 landing. 3-steps. this is only with another 8ft to the edge and then 45ft to the curb. Know it did all day and hardware was finished this morning. I started another one today 200sf. demo'd yesterday. down and off site in about 3hrs. this one was only about 12ft off the ground. (New demo crew a little slow... they need a few more to get them used to demoing what there walking on. spent 1/2 day re-laying about 40 brick and tuck-pointing about 40sf due to no ledger flashing and 30 or so years of chit getting stuck behind. tomorrow I'll 200sf set up with post. Finish package comes friday morning. We also have to take multiple deliveries because we don't ave the space like you ground guys.
Don't tell too many people that you are actually building and making a living out of it, you'll get fast and cheap comments by people who build little and post a lot

Advertisement

killerdecks is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
How do you handle Owner Provided Scopes of Work Shark49 Business 8 02-19-2012 09:52 PM
How would you handle going over budget? Everend Business 15 02-14-2012 06:44 PM
Looking for a 20+ oz smooth faced hammer with a long fiberglass ax style handle Cabdoctor Tools & Equipment 8 12-19-2011 09:19 PM
replaceing car door handle woodworkbykirk Vehicles 7 06-20-2009 09:21 PM
do i need to change my handle??? advanced_energy Windows, Siding and Doors 6 03-25-2009 09:53 PM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?