Old 11-14-2014, 12:18 AM   #41
Pro
 
Xtrememtnbiker's Avatar
 
Trade: General Remodeling
Join Date: Jun 2013
Location: Virginia
Posts: 4,991
Rewards Points: 304

Re: A Deck Job...


Quote:
Originally Posted by Californiadecks View Post
Wow you got to love that. Maybe it was a good thing you didn't try to plan it all out.
I should probably quit while I'm ahead.
The next one will work out awful...
Xtrememtnbiker is online now  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 11-14-2014, 12:23 AM   #42
Pro
 
totes's Avatar
 
Trade: General Contractor
Join Date: Oct 2013
Location: Bend Oregon
Posts: 551
Rewards Points: 910

Re: A Deck Job...


Quote:
Originally Posted by Xtrememtnbiker View Post
Matt, here's a picture of a tracksaw cut.



And some progress photos. Stepped away today for another job and will be gone tomorrow as well. Rain Monday so hopefully back on the deck job on Tuesday.



Sick! You do quality work, props.
Pic #1 is awesome, clean clean clean..... Like a manufactures photo.
Pic #2, the decking looks purple? Weird. Out of curiosity, what device took those photos?
__________________
"faster horses, younger women, older whiskey, and more money"
totes is offline  
The Following 2 Users Say Thank You to totes For This Useful Post:
Tom Struble (11-23-2014), Xtrememtnbiker (11-14-2014)
Old 11-14-2014, 12:31 AM   #43
Pro
 
Xtrememtnbiker's Avatar
 
Trade: General Remodeling
Join Date: Jun 2013
Location: Virginia
Posts: 4,991
Rewards Points: 304

Re: A Deck Job...


Quote:
Originally Posted by totes View Post
Sick! You do quality work, props.
Pic #1 is awesome, clean clean clean..... Like a manufactures photo.
Pic #2, the decking looks purple? Weird. Out of curiosity, what device took those photos?
The sun was going down, maybe that messed with the coloring? It's Azek River Rock which is a grey color.

Iphone 6
Xtrememtnbiker is online now  
Sponsored Links
Advertisement
 
Old 11-14-2014, 02:57 AM   #44
Pro
 
BuiltByMAC's Avatar
 
Trade: Deck guy
Join Date: Mar 2006
Location: Portland, OR
Posts: 3,257
Rewards Points: 2,270

Re: A Deck Job...


Quote:
Originally Posted by Californiadecks View Post
Parker this had always been my question as well. The solid beam is most common here in Southern Cali. Seems to me like a lot less work too.
We're in the land of big wood - East coasters have problems finding quality 4x stock so it's easier/faster/less expensive to lam up 2x.

IRC doesn't call out specific sized stock, only that the structural framing meets engineering specs for the weights it's supporting.

Mac
BuiltByMAC is offline  
The Following User Says Thank You to BuiltByMAC For This Useful Post:
Calidecks (11-14-2014)
Old 11-14-2014, 06:05 AM   #45
Pro
 
BCConstruction's Avatar
 
Trade: Construction
Join Date: Jun 2009
Location: Roanoke, VA
Posts: 16,392
Rewards Points: 2,394

Re: A Deck Job...


Travis how did the cantilever figure out?

Also are you doing 16" centers with the azek?
__________________
www.bcconstructionllc.com
BCConstruction is offline  
Old 11-14-2014, 07:25 AM   #46
Pro
 
Xtrememtnbiker's Avatar
 
Trade: General Remodeling
Join Date: Jun 2013
Location: Virginia
Posts: 4,991
Rewards Points: 304

Re: A Deck Job...


Quote:
Originally Posted by BCConstruction View Post
Travis how did the cantilever figure out?

Also are you doing 16" centers with the azek?
Well, it was 32" from the edge of the girder to the end of the joists on the house side. Like I said, I hadn't measured. Dad said he wasn't worried about it since all we did was expand the deck but the original had that much over hang. So now I'm scared... lol.

Anybody who knows more about deck building code want to chime in and say that since it's a double cantilever you can extend more than 24"...

I'm doing 12" centers since it's running at a 45 angle.
Xtrememtnbiker is online now  
Old 11-14-2014, 07:36 AM   #47
Pro
 
BCConstruction's Avatar
 
Trade: Construction
Join Date: Jun 2009
Location: Roanoke, VA
Posts: 16,392
Rewards Points: 2,394

Re: A Deck Job...


Quote:
Originally Posted by Xtrememtnbiker View Post
Well, it was 32" from the edge of the girder to the end of the joists on the house side. Like I said, I hadn't measured. Dad said he wasn't worried about it since all we did was expand the deck but the original had that much over hang. So now I'm scared... lol.

Anybody who knows more about deck building code want to chime in and say that since it's a double cantilever you can extend more than 24"...

I'm doing 12" centers since it's running at a 45 angle.
off the top of my head you measure from center of the posts so lets you its 10ft between centers. you are then allowed a max over hang of 2.5ft. basically 1/4th the post centers. That over hang is then measured from the center of the post to outside edge. If that makes sense.

I very much doubt they will measure it. only one of the code guys here does and he's a d*** head. As long as you are close i'm sure you will be fine. Whats funny is around here i see a few which are way over what they are meant to be yet they have sun rooms built on them and they aint come down.

i see the steps and though dam i hope he aint gone 16" centers as that gap looked big between the stringers.
__________________
www.bcconstructionllc.com
BCConstruction is offline  
Old 11-14-2014, 08:03 AM   #48
Pro
 
Xtrememtnbiker's Avatar
 
Trade: General Remodeling
Join Date: Jun 2013
Location: Virginia
Posts: 4,991
Rewards Points: 304

Re: A Deck Job...


Quote:
Originally Posted by BCConstruction View Post
off the top of my head you measure from center of the posts so lets you its 10ft between centers. you are then allowed a max over hang of 2.5ft. basically 1/4th the post centers. That over hang is then measured from the center of the post to outside edge. If that makes sense.

I very much doubt they will measure it. only one of the code guys here does and he's a d*** head. As long as you are close i'm sure you will be fine. Whats funny is around here i see a few which are way over what they are meant to be yet they have sun rooms built on them and they aint come down.

i see the steps and though dam i hope he aint gone 16" centers as that gap looked big between the stringers.

Hm. Well, I guess we will find out then. The stringers are on 16's. I thought it could span 16"...
Xtrememtnbiker is online now  
Old 11-14-2014, 08:49 AM   #49
Pro
 
BuiltByMAC's Avatar
 
Trade: Deck guy
Join Date: Mar 2006
Location: Portland, OR
Posts: 3,257
Rewards Points: 2,270

Re: A Deck Job...


Quote:
Originally Posted by Xtrememtnbiker View Post
Hm. Well, I guess we will find out then. The stringers are on 16's. I thought it could span 16"...
9" max oc. on stringers per AZEK install guide:

http://www.azek.com/files/files/tech...ide_2_2014.pdf

There's a couple of work arounds for your existing stringer spacing on page 11.


12" oc 2x8 joists can easily cantilever 32" the way your deck is framed.


Mac
BuiltByMAC is offline  
The Following 2 Users Say Thank You to BuiltByMAC For This Useful Post:
Calidecks (11-14-2014), Xtrememtnbiker (11-15-2014)
Old 11-14-2014, 10:31 AM   #50
Pro
 
Xtrememtnbiker's Avatar
 
Trade: General Remodeling
Join Date: Jun 2013
Location: Virginia
Posts: 4,991
Rewards Points: 304

Re: A Deck Job...


Quote:
Originally Posted by BuiltByMAC View Post
9" max oc. on stringers per AZEK install guide:

http://www.azek.com/files/files/tech...ide_2_2014.pdf

There's a couple of work arounds for your existing stringer spacing on page 11.


12" oc 2x8 joists can easily cantilever 32" the way your deck is framed.


Mac

Thanks. I'll look at that on the computer later.
Xtrememtnbiker is online now  
Old 11-14-2014, 02:14 PM   #51
GC/carpenter
 
Calidecks's Avatar
 
Trade: Decking, Railing, Carpenter/General Contractor
Join Date: Nov 2011
Location: Anaheim Hills, California (OC)
Posts: 36,538
Rewards Points: 18,354

Re: A Deck Job...


Quote:
Originally Posted by BCConstruction View Post
off the top of my head you measure from center of the posts so lets you its 10ft between centers. you are then allowed a max over hang of 2.5ft. basically 1/4th the post centers. That over hang is then measured from the center of the post to outside edge. If that makes sense.

I very much doubt they will measure it. only one of the code guys here does and he's a d*** head. As long as you are close i'm sure you will be fine. Whats funny is around here i see a few which are way over what they are meant to be yet they have sun rooms built on them and they aint come down.

i see the steps and though dam i hope he aint gone 16" centers as that gap looked big between the stringers.
I've had a city engineer tell me it's from start of bearing, is where you measure from.
Calidecks is online now  
Old 11-14-2014, 03:08 PM   #52
Pro
 
BCConstruction's Avatar
 
Trade: Construction
Join Date: Jun 2009
Location: Roanoke, VA
Posts: 16,392
Rewards Points: 2,394

Re: A Deck Job...


Quote:
Originally Posted by Californiadecks View Post
I've had a city engineer tell me it's from start of bearing, is where you measure from.
I think thats the rule for the joist being inside the posts for joist spans but for cantilevers i think they say middle of the post that way its slipt between the joist and the overhang. But it would make sense for it to be from the start of bearing as that's where its gonna lever from.

Here's what our county code book says. I bet travis is the same as he just down the road from me.
__________________
www.bcconstructionllc.com
BCConstruction is offline  
The Following User Says Thank You to BCConstruction For This Useful Post:
Calidecks (11-14-2014)
Old 11-14-2014, 03:18 PM   #53
GC/carpenter
 
Calidecks's Avatar
 
Trade: Decking, Railing, Carpenter/General Contractor
Join Date: Nov 2011
Location: Anaheim Hills, California (OC)
Posts: 36,538
Rewards Points: 18,354

Re: A Deck Job...


Quote:
Originally Posted by BCConstruction View Post
I think thats the rule for the joist being inside the posts for joist spans but for cantilevers i think they say middle of the post that way its slipt between the joist and the overhang. But it would make sense for it to be from the start of bearing as that's where its gonna lever from.

Here's what our county code book says. I bet travis is the same as he just down the road from me.
The IRC is like the bible. 13,900 different interpretations, from the same writing.

Last edited by Calidecks; 11-14-2014 at 03:20 PM.
Calidecks is online now  
The Following 2 Users Say Thank You to Calidecks For This Useful Post:
BCConstruction (11-14-2014), Xtrememtnbiker (11-14-2014)
Old 11-14-2014, 04:31 PM   #54
Pro
 
Xtrememtnbiker's Avatar
 
Trade: General Remodeling
Join Date: Jun 2013
Location: Virginia
Posts: 4,991
Rewards Points: 304

Re: A Deck Job...


What's odd is the deck used to have no overhang on the end away from the house but it had a 32" overhang at the house. We added the 24" overhang on the outer edge. It's only a 7 year old house too. No way that would pass code right?
Xtrememtnbiker is online now  
Old 11-14-2014, 04:59 PM   #55
GC/carpenter
 
Calidecks's Avatar
 
Trade: Decking, Railing, Carpenter/General Contractor
Join Date: Nov 2011
Location: Anaheim Hills, California (OC)
Posts: 36,538
Rewards Points: 18,354

Re: A Deck Job...


Quote:
Originally Posted by Xtrememtnbiker View Post
What's odd is the deck used to have no overhang on the end away from the house but it had a 32" overhang at the house. We added the 24" overhang on the outer edge. It's only a 7 year old house too. No way that would pass code right?
Two things, one it may be only 25% of the span, and two the inspector could of missed it or saw it and said nothing.
Calidecks is online now  
The Following User Says Thank You to Calidecks For This Useful Post:
Xtrememtnbiker (11-14-2014)
Old 11-16-2014, 12:35 AM   #56
Pro
 
Fresh Decks's Avatar
 
Trade: Carpentry
Join Date: Nov 2013
Location: Regina. SK
Posts: 148
Rewards Points: 310

Re: A Deck Job...


Quote:
Originally Posted by Californiadecks View Post
Two things, one it may be only 25% of the span, and two the inspector could of missed it or saw it and said nothing.
I WISH I had 25% to work with. For some reason my municipality has decided 16" is the max cantilever regardless of joist size.

I just submitted a 12' long 2x10 joist layout that cantilevered a total of 18" and they modified me to 16".
Fresh Decks is offline  
Old 11-23-2014, 06:55 PM   #57
Pro
 
Xtrememtnbiker's Avatar
 
Trade: General Remodeling
Join Date: Jun 2013
Location: Virginia
Posts: 4,991
Rewards Points: 304

Re: A Deck Job...


So we got the roof on it and did some more stair framing work.

I ended up switching the stringer's to 9" OC after the helpful link from Mac.
Also blocked for the picture frame on the stairs.



https://lh3.googleusercontent.com/-k...o/IMG_2819.JPG

As always, I came up with a couple more questions. How do you guys handle the bottom of your stairs? What makes for a really solid set of stairs? I did the blocking between the middle stringers because I realized they're not tied together by anything but the decking. That's how we always do it with wood but I figured with the PVC I might should block them.

It also seemed to help make the posts sturdier. But can I do anything better or different next time?


On the deck at the edge of the porch roof we'll be putting in a few more 4x4 posts to for the end wall of the for the screen to attach to. We had discussion on putting the posts on the decking vs cutting the decking out and putting the posts on the framing. I was very much in favor of the framing option but Dad and the other guy we were discussing it with said the decking seemed fine.

The posts aren't really load bearing. My understanding is the decking will expand and contract almost entirely linearly. Dad had suggested screwing through from underneath for the posts.

My standpoint was, maybe that way works, but I just really felt like it was better to cut out and go all the way down to the framing. I couldn't really give much reason other than expansion and contraction which seems like it wouldn't really mess up anything in the first place. Anybody have advice for me on that? I'm pretty sure the way we left it was Dad saying it was fine to do it my way since I thought we should but he still didn't see why.
Xtrememtnbiker is online now  
Old 11-23-2014, 10:19 PM   #58
Pro
 
Roofcheck's Avatar
 
Trade: Know it all
Join Date: Dec 2011
Location: Vermont
Posts: 2,104
Rewards Points: 2,054

Re: A Deck Job...


Finehomebuilding has a article on stairs this month.

BTW nice job.
Roofcheck is offline  
The Following User Says Thank You to Roofcheck For This Useful Post:
Xtrememtnbiker (11-23-2014)
Old 11-23-2014, 11:11 PM   #59
GC/carpenter
 
Calidecks's Avatar
 
Trade: Decking, Railing, Carpenter/General Contractor
Join Date: Nov 2011
Location: Anaheim Hills, California (OC)
Posts: 36,538
Rewards Points: 18,354

Re: A Deck Job...


Nice job Travis. Well there are a couple ways to tie in that last post. I always drop it through the decking and tie it to the framing. You can even drop the last post in the footing, or drop it through the framing setting on top the footing and block it nice and tight. Also you can fill the two outside stringer bays holding the posts, with concrete. A couple shovel fulls around the post to help lock it in.
Calidecks is online now  
The Following 3 Users Say Thank You to Calidecks For This Useful Post:
Jaws (11-23-2014), Tom Struble (11-23-2014), Xtrememtnbiker (11-23-2014)
Old 11-23-2014, 11:17 PM   #60
Pro
 
Xtrememtnbiker's Avatar
 
Trade: General Remodeling
Join Date: Jun 2013
Location: Virginia
Posts: 4,991
Rewards Points: 304

Re: A Deck Job...


Quote:
Originally Posted by Californiadecks View Post
Nice job Travis. Well there are a couple ways to tie in that last post. I always drop it through the decking and tie it to the framing. You can even drop the last post in the footing, or drop it through the framing setting on top the footing and block it nice and tight. Also you can fill the two outside stringer bays holding the posts, with concrete. A couple shovel fulls around the post to help lock it in.
The bottom stair posts are ThruLok'd to the stringer and sitting on 12" footing blocks. The center 3 stringers are on a concrete pad we poured. The blocking I did at the bottom of the steps seemed to help. I just was curious what other ways people used. The concrete is certainly an interesting idea.

What about the 4x4's on the deck for the screen wall. Any thoughts on that?

Advertisement

Xtrememtnbiker is online now  
The Following User Says Thank You to Xtrememtnbiker For This Useful Post:
overanalyze (12-03-2014)


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Hidfast Gun redwood Decks & Fencing 28 06-08-2012 06:43 PM
Roof top Deck issue mandaloril Decks & Fencing 22 04-24-2012 10:19 PM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?