Quote:
Originally Posted by Digger1799 View Post
Where is AROUND HERE? Because in New York, you are looking at $1,200 to $1,500 for a pump truck. and I believe many are hitting you with Fule Surcharges on top of that.
UUUUh, that would be....
<---

And Mac is in the Pacific North Wet, he says $200!
__________________
Put your location in your profile!
(Sorry....it seems there really are dumb questions)
neolitic is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 10-28-2007, 10:20 PM   #22
David Davis
 
shed-n-deck's Avatar
 
Trade: ? No thanks, I like mine better!
Join Date: Sep 2007
Location: Denver, Colorado
Posts: 245
Rewards Points: 150

Re: Largest Slab Poured From 80lb Bags?


Quote:
Originally Posted by curapa View Post
I made a few calls today after seeing what some of you are paying for the pump truck and it turns out this guy jacked up his prices in hopes to get a quick hefty paycheck. He is apparently about to lose his truck and needs a bit of cash quick. My friend told me he knew he was in debt but didn't expect him to jack up prices to make ends meet. His normal charge would have been around $500 from what I hear.
Well, he tried taking advantage of you...Call him back and take advantage of him. Tell him you know of his situation, and that even though he tried to rip you off, you'd still be willing to hire him for the job and pay him $300.00 for his time.
__________________
Shed
shed-n-deck is offline  
Old 10-29-2007, 09:00 AM   #23
Pro
 
dirt diggler's Avatar
 
Trade: contractor
Join Date: May 2006
Location: east
Posts: 3,309
Rewards Points: 2,000

Re: Largest Slab Poured From 80lb Bags?


First - I think you're crazy.

Second - I think you're going to need 226 bags ... but that's neither here nor there ....


Third ... doesn't make sense financially to do it this way. I'm not wasting time breaking this down for you (i will later if you ask). But it'll cost more doing it by the bag



Most I've ever done by myself (at least within past 5 years that I can remember) was a 36 sq. ft. pad. I felt like an idiot for trying to attempt this alone. If nothing else - it was certainly not the "professional" way of doing it.


$1,200 for pump truck (boom truck) is reasonable (areas of the country aside). You would need a dozen guys just for labor ... so you'd end up paying this anyways.



If you can't get a skid steer in (due to trees, fence, etc) - use one of those walk behind loaders (landscapers use them) - or a concrete buggy ... or a boom truck.



if 8x8 pads are the most you've done by yourself - with the mix/bag way - you're in for one hell of a surprise
__________________
Thanks in advance!!!
dirt diggler is offline  
Sponsored Links
Advertisement
 
Old 10-29-2007, 09:14 AM   #24
Pro
 
dirt diggler's Avatar
 
Trade: contractor
Join Date: May 2006
Location: east
Posts: 3,309
Rewards Points: 2,000

Re: Largest Slab Poured From 80lb Bags?


Quote:
Originally Posted by Teetorbilt View Post
I was doing 12' X 12' X 2 1/2" to 3 1/2" (60-66 bags) about every other month for a couple of years. No problem, I wouldn't hesitate to go bigger and have plans to with footers.

Tricks.

A couple of guys willing to WORK!!!

The above were always on existing slabs and I sealed then bonded them to prevent wicking away moisture. On bare ground I use Visqueen. Moisture content is also crucial to curing.

2 bags is all that you can mix in a wheelbarrow. Premeasure your water on the first batch and use 2 5gal. buckets. One is a 'control bucket', if you need to add more water to the mix add the same amount to the 'control' bucket. When you have it right, mark the level in the control bucket and it becomes the primary bucket. Fill it to the same line every time.

Use a couple of good 6" hoes with a guy working from each end of the wheelbarrow. Once you get the rhythm down, you should be cranking down about 2 bags in 2 mins. or less.

For 200 bags I'd bring in a second team and a helper to ferry bags, etc.
I gotta call shenanigans here.

First ... 60-66 bags for 144 sq feet??? I might give you that only if it sub base was exactly on-grade and without any low spots

In the real world ... haven't seen too many concrete preps that didn't have some low spots.


Second - again, financially does not make sense to do that way. You would pay more in labor than you would for the minimum delivery charge in concrete from the plant.


Third - can't see why anyone who would've attempted this would want to do it AGAIN




Also - i certainly hope these aren't footers or anything structural. Just throw in the factor of human error and it's near impossible to be have a consistent mix
__________________
Thanks in advance!!!

Last edited by dirt diggler; 10-29-2007 at 09:17 AM.
dirt diggler is offline  
Old 10-29-2007, 09:31 AM   #25
Pro
 
Mike Finley's Avatar
 
Trade: Bathroom Remodeling
Join Date: Apr 2004
Location: Littleton, Colorado
Posts: 14,078
Rewards Points: 2,000

Re: Largest Slab Poured From 80lb Bags?


While I wouldn't want to be involved in this thing personally, I don't see the big deal if you're willing to either be involved in the nightmare yourself or better yet get yourself some cheap and dumb labor to do it as you direct the action. 95% of this scenario is dumb labor with 5% concrete knowledge and finishing skill.


Quote:
Originally Posted by curapa View Post
I have a project coming up with no access for a concrete truck. The slab will be 20' x 17' x 4", has anyone ever poured something this large out of 80lb bags? I estimate around 200 bags. I have done smaller 8' x 8' slabs without much difficulty. Any thoughts? Tips?
As I see it what you want to do is just doing your 8x8s four times. There is no way in hell you can do a competent job trying to do this entire slab as a single 200 bag pour, but you could very competently do it as (4) 10'x8'-6" slabs done one right after the other.

Anything is doable, they built the pyramids without power tools you know, the difference between speed/efficiency and just getting the job done is adding more man power.

Teetor in a past life was a pyramid builder ya know! While his ways might not involve turning the key on a Cat to get something done, he knows that shovels will still move the same dirt.

Last edited by Mike Finley; 10-29-2007 at 09:35 AM.
Mike Finley is offline  
Old 10-29-2007, 10:33 AM   #26
Pro
 
Tscarborough's Avatar
 
Trade: Monkey Scratching Cat Herder
Join Date: Feb 2006
Location: Austin
Posts: 6,341
Rewards Points: 1,450

Re: Largest Slab Poured From 80lb Bags?


I have job mixed over 200 bags in 8 hours, but it was to grout a 12" CMU wall, so time was not a factor. I would still never do it again, no matter what the cost.
Tscarborough is offline  
Old 10-29-2007, 01:35 PM   #27
Pro
 
curapa's Avatar
 
Trade: Carpentry / Fencing / Decks
Join Date: Oct 2007
Location: Savannah, Ga
Posts: 1,249
Rewards Points: 500

Re: Largest Slab Poured From 80lb Bags?


I completely understand the difficulty in doing a 200 bag pour and it was not something I wanted to do. I also understand the additional cost in labor and concrete but I was not going to pay $1000 just for the pump truck to come out. The total bid for the 17' x 20' pad was $3200 and I wasnt willing to pay that. I'm getting some more quotes on pump trucks this week.
curapa is offline  
Old 10-29-2007, 05:26 PM   #28
Pro
 
dirt diggler's Avatar
 
Trade: contractor
Join Date: May 2006
Location: east
Posts: 3,309
Rewards Points: 2,000

Re: Largest Slab Poured From 80lb Bags?


Quote:
Originally Posted by curapa View Post
I completely understand the difficulty in doing a 200 bag pour and it was not something I wanted to do. I also understand the additional cost in labor and concrete but I was not going to pay $1000 just for the pump truck to come out. The total bid for the 17' x 20' pad was $3200 and I wasnt willing to pay that. I'm getting some more quotes on pump trucks this week.
dude, im tellin ya at $3200 - if you go with the bags - you're going to break even - if not lose money on this job. And for the amount of work involved - it is NOT WORTH IT.


You're going to need AT LEAST a dozen guys to make this work in a reasonable amount of time .... and they would need to be hustling the entire time.


evidently - you didn't think of all of this when you bid the job out. Judging by the price - you just figured up 340 sq. ft. and spat out the sq. foot price


have you even thought about how many wheelbarrows you're going to need???? At $75 a pop - you're going to exceed the cost in renting a skid steer for the day. See how ridiculous that sounds??


concrete work sucks enough - let alone sucks even more when you don't make money on it. My advice would be to either cancel the job - or tell them the situation (be upfront) and get some more money for the pump truck.

You SHOULD have in your contract that "Client provides access to site" ... having trees, sewer lines, fences, etc in the way is included in such clauses.


THIS IS EXACTLY WHY YOU SHOULD NOT USE ONLY SQUARE FOOT PRICING FOR PRICING THE JOBS OUT
__________________
Thanks in advance!!!

Last edited by dirt diggler; 10-29-2007 at 05:29 PM.
dirt diggler is offline  
Old 10-29-2007, 05:33 PM   #29
Pro
 
bobcaygeonjon's Avatar
 
Trade: Bricklayer / contractor
Join Date: Aug 2007
Location: Stirling, Ontario
Posts: 185
Rewards Points: 150

Re: Largest Slab Poured From 80lb Bags?


It can be done. Listen to teetor. Get 2 mixers going and get them as close to the pour as possible. How big are the mixers. 2 bag each? The main thing is though you will need a good crew and a good guy to start trowling off the first part of the pour while still pouring the later half.
But then again how would the cost of a larger crew and extra mixer etc compare to the cost of a pumpp truck?
bobcaygeonjon is offline  
Old 10-29-2007, 06:12 PM   #30
Pro
 
mickeyco's Avatar
 
Trade: Squirrel Handler
Join Date: May 2006
Location: Chicago
Posts: 3,432
Rewards Points: 2,000

Re: Largest Slab Poured From 80lb Bags?


Quote:
Originally Posted by bobcaygeonjon View Post
It can be done. Listen to teetor. Get 2 mixers going and get them as close to the pour as possible. How big are the mixers. 2 bag each? The main thing is though you will need a good crew and a good guy to start trowling off the first part of the pour while still pouring the later half.
But then again how would the cost of a larger crew and extra mixer etc compare to the cost of a pumpp truck?
What happens if one of those mixers breaks?
__________________
Some people climb mountains. I take out the trash. But we both do it for the same reason.
mickeyco is offline  
Old 10-29-2007, 09:45 PM   #31
Pro
 
dirt diggler's Avatar
 
Trade: contractor
Join Date: May 2006
Location: east
Posts: 3,309
Rewards Points: 2,000

Re: Largest Slab Poured From 80lb Bags?


of course it can be done ...

but this is like digging someone's foundation for an addition by hand, with a shovel just because you can't fit a backhoe


point is - HELLO! ... ACCESS CLAUSE????

ugh ... nevermind ... maybe im the crazy one
__________________
Thanks in advance!!!

Last edited by dirt diggler; 10-29-2007 at 09:49 PM. Reason: figured maybe i am the crazy one;)
dirt diggler is offline  
Old 10-29-2007, 11:45 PM   #32
Pro
 
reveivl's Avatar
 
Trade: Renovations
Join Date: May 2005
Location: West Coast Canada
Posts: 1,716
Rewards Points: 1,000

Re: Largest Slab Poured From 80lb Bags?


What is the actual situation? You've had lots of advice but there doesn't seem to be much info, unless I missed it. How close can you get a concrete truck? A couple hundred yards, or a couple miles? If you can get delivery on site then just rent barrows and people and wheel the stuff in. I recently did 3-7yd pours several hundred yards from the truck with three barrows. They kept me hopping on the vibe and finishing on footers, walls and slabs. If it's further than that you'll need more barrows for the turn-around time.

If it's across a lake and up a mountain trail, I grant you this method might not be practical.
__________________
From where does knowledge come? If you need to know what is in a box, you could ask someone (not reliable), you could pray, (not useful), you can consult with the scripture (not helpful) or you could open the box (science)
reveivl is offline  
Old 10-29-2007, 11:47 PM   #33
Pro
 
CaliDesigns's Avatar
 
Trade: Contractor, Stamped Concrete, Pool Design
Join Date: Sep 2007
Location: Omaha, NE
Posts: 141
Rewards Points: 75

Re: Largest Slab Poured From 80lb Bags?


Let me get this straight. You bid a patio at $9.42/sq.ft. , and you want to spend $1000 on bags vs. $360 for ready mix, but don't want to spend 400 for a pump? Sounds like you should sub this one out. If you were in my area, I'd do it and stamp it for $10.25/ sq.ft. For the record, my largest pour (not bags) was 2,640 yrds in 10 hrs.
CaliDesigns is offline  
Old 10-30-2007, 05:05 PM   #34
Pro
 
curapa's Avatar
 
Trade: Carpentry / Fencing / Decks
Join Date: Oct 2007
Location: Savannah, Ga
Posts: 1,249
Rewards Points: 500

Re: Largest Slab Poured From 80lb Bags?


Quote:
Originally Posted by CaliDesigns View Post
Let me get this straight. You bid a patio at $9.42/sq.ft. , and you want to spend $1000 on bags vs. $360 for ready mix, but don't want to spend 400 for a pump? Sounds like you should sub this one out. If you were in my area, I'd do it and stamp it for $10.25/ sq.ft. For the record, my largest pour (not bags) was 2,640 yrds in 10 hrs.
Actually the guy with the pump truck quoted me at $3200 to pour and finish the pad. I have gotten several quotes from others If I were able to get a concrete truck in there at $1100-$1600.

This pad is for a pergola on the opposite side of a pond behind someones home. It can be reached with a pump truck and will be a very easy job.

The pergola will be built over the slab and then the slab will get tiled.

I have now gotten quotes from other pump truck companies and they are in line with what I had budgeted. After I got the initial quote for the pump truck it threw me way off and I resourced here for other options. I had never done a 200 bag pour so I asked if it was possible and if so did anyone have any advise. I am no concrete guy and you couldn't pay enough to mess with the stuff for a living other than setting posts and such. If it were possible to do a decent pour with bags I would have no problem paying $1000 for bags and $1000 for labor rather than the previous $3200 for the pump truck.
BTW I had never thought of having the concrete delivered and wheelbarrowing it to the slab, I will keep that in mind.

Thanks for the help,
Curt
curapa is offline  
Old 11-03-2007, 07:20 PM   #35
Registered User
 
J&A IslandWide's Avatar
 
Trade: Mason
Join Date: Nov 2007
Location: Long Island NY
Posts: 17
Rewards Points: 10

Re: Largest Slab Poured From 80lb Bags?


Go with the ready-mix, get your self 2 wheelbarrels and 2 guys that will carry the concrete to the frame, put another guy in the mud to screed. As long as its not uphill for the wheelbarrels you should be fine. Figiure about 13-17 trips at half-full wheelbarrel per yard...you need about 5 yards...do not fill them up all the way...close to 400 lbs if there full.
J&A IslandWide is offline  
Old 11-03-2007, 07:27 PM   #36
Entpenuer
 
a2zhandi's Avatar
 
Trade: Residential and light commercial renovations. Cabinet/Furniture design - construct.
Join Date: Nov 2007
Location: Gainesville, Florida
Posts: 157
Rewards Points: 150

Re: Largest Slab Poured From 80lb Bags?


Quote:
Originally Posted by curapa View Post
I have a project coming up with no access for a concrete truck. The slab will be 20' x 17' x 4", has anyone ever poured something this large out of 80lb bags? I estimate around 200 bags. I have done smaller 8' x 8' slabs without much difficulty. Any thoughts? Tips?
Yes, in fact, I poured 5 pallets of 80# and 1 pallet of mortar. I cheated though and used a gas mixer. But I can now mix on average 80-100# in a wheelbarrow in 3 minutes or less. With out even breaking a sweat!! AND (Without slump). I have that down to a science. Have at it
__________________
You can always be too bad. But you can NEVER be too good.
"If you didn't learn something one day, you didn't do anything that day
A2Z
a2zhandi is offline  
Old 11-03-2007, 07:41 PM   #37
Carpenter/fencing
 
nywoodwizard's Avatar
 
Trade: Carpenter/Fence contractor
Join Date: Sep 2005
Location: Lindenhurst,NY
Posts: 808
Rewards Points: 504

Re: Largest Slab Poured From 80lb Bags?


Quote:
Originally Posted by mickeyco View Post
I've given it some thought, this can be done, You will need 104 day laborers (easily found at the local home center in any of the sanctuary cities), 104 cement mixing pans, 104 mixing tools, 104 5 gallon buckets and a coach's whistle. The extra 4 on every thing is back up just in case of a problem. You line up the laborers outside, each with 2 bags of concrete, a mixing pan, a mixing tool and a 5 gallon bucket. You fill all the 5 gallon buckets with water, when that's done and everybody is in their places and ready to go you blow your whistle and they all begin mixing 2 bags of concrete each. When they are finished mixing they pour the concrete into the buckets, form a bucket brigade in both directions and move the concrete inside and return the empty buckets back to be filled and returned again. You then return all the buckets, mixing pans and mixing tools to the home center for a refund, give the laborers $5 each and a bag of peanuts as agreed upon, DONE.

Obviously I'm kidding, but I can't think of any good way other than pump it, chutes, wheel barrows or using the bobcats as already suggested.

You are a genius!
__________________
Learning without thought is labor lost; thought without learning is perilous.
nywoodwizard is offline  
Old 12-30-2007, 05:07 AM   #38
Pro
 
mrghm's Avatar
 
Trade: Commerical Construction
Join Date: Nov 2006
Posts: 232
Rewards Points: 150

Re: Largest Slab Poured From 80lb Bags?


might be all done by now, but if not you should use one of these. or use a crane bucket on a telehandler.
Attached Thumbnails
Largest slab poured from 80lb bags?-getimage.jpg  
mrghm is offline  
Old 12-30-2007, 08:09 AM   #39
Retired Contractor
 
LNG24's Avatar
 
Trade: Handyman
Join Date: Oct 2005
Location: Oregon
Posts: 1,197
Rewards Points: 538

Re: Largest Slab Poured From 80lb Bags?


Yeah, give us a follow up. What Happened with the SLAB?
LNG24 is offline  
Old 12-30-2007, 09:45 AM   #40
Member
 
RLGC's Avatar
 
Trade: General contracting
Join Date: Mar 2007
Posts: 33
Rewards Points: 25

Re: Largest Slab Poured From 80lb Bags?


I paid about 800.00 5 years ago, 1000.00 don't sound bad. I called a local concrete company in North Jersey. They said to call this female. I don't think I should use her real name, lets say Sandy. I called and she was out the next day by her self with her truck and trailer. She was not bad looking and had a decent body. Well, she put on her work gloves and started tossing those hoses around like nothing. Cement truck got there and we busted out several sono tubes and about 80' of footings in less than 2 hours. Set up and cleanup took her longer than the pour. The advantage she had is being the sap that most of us are when it comes to woman we wind up offering to help her along. But in the end it was a pleasant experience. We would have had to kill ourselves with wheelbarrows. The trick is figuring the cost in your price before hand.

Advertisement

RLGC is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
built up slab question stampcrete Concrete & Paving 9 03-27-2008 04:24 PM
Question regarding concrete slab TennesseeBrian Concrete & Paving 5 01-06-2008 09:11 PM
Poured Foundations +- phanley Masonry 22 07-22-2007 12:17 AM
Demo a foundation under a radiant heat slab without disturbing the slab...? wackman Remodeling 18 04-01-2007 11:38 PM
Basement slab question n74tg Masonry 5 05-26-2006 03:38 PM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?