First Prefab. Steel Building Bid / Project


Any tips on bidding a steel building assembly? Garage / Work shop 15x25-ish. How about tips to help the erection go smoothly? I pretty much have the job, just need to price it to make a decent profit. Grading and slab are no problem, bidding & construction. Thanks
HammerOn is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 11-15-2013, 06:02 AM   #2
Pro
 
Pearce Services's Avatar
 
Trade: Commercial Loading Dock and Door Contractor
Join Date: Nov 2005
Location: Southeastern Massachusetts
Posts: 1,365
Rewards Points: 100

Re: First Prefab. Steel Building Bid / Project


Check with the manufacturer and ask them how many man hours it should take for a first timer, then check out youtube, then be honest with your customer about your experience level,

Advertisement

__________________
Kevin

www.BadcoDoors.com
Pearce Services is offline  
Old 11-15-2013, 08:04 AM   #3
Pro
 
Joasis's Avatar
 
Trade: General Contractor
Join Date: Mar 2006
Location: Hennessey, Oklahoma
Posts: 9,469
Rewards Points: 164

Re: First Prefab. Steel Building Bid / Project


A few more details about the building would help. We do steel erections as our main line of work, and pricing is pretty basic. You can call me as a lifeline if you need to ask something. When I did my first buildings, no one was around to ask, or willing to answer.
__________________
Ladwig Construction
Hennessey, Oklahoma
405 853 1563

Insulated Concrete Homes / ICF's
My Facebook Page
Joasis is online now  
The Following User Says Thank You to Joasis For This Useful Post:
aptpupil (12-23-2013)
Sponsored Links
Advertisement
 
Old 12-14-2013, 02:34 PM   #4
Member
 
HammerOn's Avatar
 
Trade: Building / Remodel / Repair / Earth Works / Masonry
Join Date: Jul 2013
Location: NC
Posts: 63
Rewards Points: 91

Re: First Prefab. Steel Building Bid / Project


I hadn't noticed any replies. The job has went a little screwy with the customer deciding he can assemble the building himself with a "little help" from us. I don't know where that's going... so I'm just taking it one step at a time.

We took the job of constructing the foundation- grading, footing, block, and slab.

The building is a Quonset Hut, 20'-5" x 72'-5". It has 7' of straight wall before the arch begins and has a center height of 16'.

I would like to give him a straight price on construction/assembly as I couldn't imagine helping a customer with a project being anything other than a nightmare. He thinks the manpower is all he needs.

Thanks in advance! Hope everyone is gearing up for a little down time with the family for the holidays.
HammerOn is offline  
Old 12-14-2013, 03:23 PM   #5
Pro
 
CarpenterSFO's Avatar
 
Trade: GC
Join Date: Dec 2012
Location: CA
Posts: 7,076
Rewards Points: 2,044

Re: First Prefab. Steel Building Bid / Project


Quote:
Originally Posted by HammerOn View Post
... the customer deciding he can assemble the building himself with a "little help" from us. I don't know where that's going...
...I couldn't imagine helping a customer with a project being anything other than a nightmare. He thinks the manpower is all he needs.
If he only wants your labor he can get workers comp and liability and a license and hire you as an employee.
__________________
- Bob
CarpenterSFO is offline  
Old 12-14-2013, 10:29 PM   #6
Pro
 
Joasis's Avatar
 
Trade: General Contractor
Join Date: Mar 2006
Location: Hennessey, Oklahoma
Posts: 9,469
Rewards Points: 164

Re: First Prefab. Steel Building Bid / Project


Either you are doing the job, or you are an employee with a paycheck. You pick.

I had a guy many years ago who called me and asked me how much to erect his building, that he already bought. I quoted my number, and he acted like I was committing a crime. Then he asked how long it would take me and I said 4 days I think, or something....anyway, less then 40 hours on site. So he says he has to think about it.

He calls back a few days later and says he will not pay me what I quoted, as it worked out to about $400 an hour, and no one is worth that. I told him that my price included insurance, comp on my crew, and my equipment, plus, my experience. I don't need the practice. He said he didn't see it.....and offered my about 1/4 of what we charge to do the erection. Sorry, I say, and good luck, and I don't give it another thought.

He calls several weeks later, and decided to talk about this again...and he asks if I will do it for 1/2? Nope....I tell him I don't mean to be rude, but I am not in the business of making wages or I would go get a job. He hangs up on me, and I really think this was it.

A week or two pass, and the phone rings again...and it is him, and he decided he would pay my price, and can I get there right now, like RIGHT NOW? Nope....we are busy, and it will be weeks.....and he says he needs us right now.....and then tells me he bolted a main frame together and then using his farm tractor with a front end loader and a pipe stinger chained to the bucket, managed to get the frame up in the air, and bolted on, and then when he tried to get off of it, letting the frame stand alone, it was trying to rack over and fall, and he was now afraid he would ruin it, and could I please come with my forklift, scissor lift, and crew and help him out.....

So........the next morning we roll in, and literally manage to get his building done in like 28 hours.....and as he was paying me, the bitching started all over again......and I said you sure sounded different the other day, didn't you? He tried until the end to beat me down on price.


So...moral to the story, stand your ground. A duraspan building, which is what you are describing, is labor intensive. And there are a lot of bolts and lots of potential to leak if you fail to do the install correctly. So either the customer runs the show, or you do.....pick.
__________________
Ladwig Construction
Hennessey, Oklahoma
405 853 1563

Insulated Concrete Homes / ICF's
My Facebook Page
Joasis is online now  
The Following 6 Users Say Thank You to Joasis For This Useful Post:
aptpupil (12-23-2013), CarpenterSFO (12-23-2013), griz (12-14-2013), overanalyze (12-14-2013), stombaugh85 (12-15-2013), Timo (12-15-2013)
Old 12-23-2013, 12:09 PM   #7
Registered User
 
RDWelch's Avatar
 
Trade: GC and Roofing
Join Date: Dec 2013
Location: Arcadia, FL
Posts: 7
Rewards Points: 16

Re: First Prefab. Steel Building Bid / Project


I have a similar scenario. I'll soon be starting my first prefab steel building. My business model is to sub out all trades. Does anyone have any insight on pitfalls to look out for with steel buildings?
RDWelch is offline  
Old 12-23-2013, 03:27 PM   #8
Pro
 
Joasis's Avatar
 
Trade: General Contractor
Join Date: Mar 2006
Location: Hennessey, Oklahoma
Posts: 9,469
Rewards Points: 164

Re: First Prefab. Steel Building Bid / Project


Sure...qualify them. You know, check references, credentials, insurance certs, and then go and see their past work. A guy with a magnetic sign on his 15 year old truck with a ladder in the back is not a steel erector.
__________________
Ladwig Construction
Hennessey, Oklahoma
405 853 1563

Insulated Concrete Homes / ICF's
My Facebook Page
Joasis is online now  
Old 10-13-2014, 12:10 PM   #9
Registered User
 
exco's Avatar
 
Trade: general contracting
Join Date: Oct 2014
Posts: 15
Rewards Points: 36

Re: First Prefab. Steel Building Bid / Project


All very good points, we are about to do a demolition job, we had to open a new company to get insurance as the construction guys dont want to touch demo. I dont think folks realize how much of the cost is insurance and workers comp.

Advertisement

exco is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
My latest project Dustincoc Off Topic (Non Trade) 2 03-24-2013 10:01 PM
Framing with steel article. Rich D. Decks & Fencing 6 02-02-2013 05:51 PM
Steel Building Delivery baronbuildings Business 29 02-10-2012 06:04 PM
material options for large steel framed building AustinDB Roofing 3 01-21-2012 07:59 AM
??? Whats the best way to spread the news about your company? jmgrahamjr Marketing & Sales 21 06-24-2008 03:46 AM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?