I know my trade says electrical, but that is just one of the things I do. I really do it all around here.

So, in excavating for a footer for a rather large point load, I encountered a very large void. It is basically a large open pit about 12' deep and many square feet in size. We are pumping the water out now, so I have not seen the bottom, but my money is on a thick concrete slab.

Moving the location of my new footer is not really an option, so I need to address the issue of the void. The void is about 60% of the area of my proposed footer. I might post some pics later.

My plan is to install a galvanized culvert pipe vertically in the hole and pour if full of concrete. I plan on getting it in the hole and secured against movement and then drop a few bags of quick-crete down the hole to seal the bottom. After that sets up, I will order the concrete.

So, should I order anything other than what I would pour for a slab? What about the free fall? I don't see how I can limit the fall to less than 13' initially. Should I do it in lifts?

I am assuming the metal culvert can take the pressure, and i already have several of then on hand, but would I be better off with a plastic culvert?

Total footer size if about 48x48 and the culvert is 22"

Thanks

Last edited by acro; 03-31-2013 at 06:06 AM.
acro is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 03-31-2013, 07:18 AM   #2
Pro
 
rjconstructs's Avatar
 
Trade: Residential remodel
Join Date: Apr 2009
Location: Oklahoma City, Oklahoma
Posts: 682
Rewards Points: 198

Re: Considerations For Pouring A Rather Tall Concrete Pier?


There are a lot of factors to consider. This is a column with "a rather large point load", is one. Is there an engineer around that you can call on to give you some specs for sizes? The culvert pipe is a good idea but what size? (22? 24?) Are you going to lay steel in it? What strength concrete are you thinking? I don't like the idea of dropping the concrete 13' but if you vibrate it as you go up you can lessen the separation that might occur. Keep us posted on what you figure out.

Advertisement

rjconstructs is offline  
Old 03-31-2013, 07:42 AM   #3
Pro
 
11678's Avatar
 
Trade: Remodeler
Join Date: Jan 2007
Location: Clifton, NJ
Posts: 251
Rewards Points: 250

Re: Considerations For Pouring A Rather Tall Concrete Pier?


A large void = future sinkhole ?
11678 is offline  
Sponsored Links
Advertisement
 
Old 03-31-2013, 08:27 AM   #4
Forming and Framing
 
FramingPro's Avatar
 
Trade: Shell builder
Join Date: Jan 2010
Location: Toronto
Posts: 6,273
Rewards Points: 3,582

Re: Considerations For Pouring A Rather Tall Concrete Pier?


Concrete placement rate and consolidation .And finally bracing!!! You will find out that you have too little bracing much faster then you will if you have too much.
__________________
Im after fortune and frame

http://www.proicf.com
http://instagram.com/instagrauds
FramingPro is offline  
The Following User Says Thank You to FramingPro For This Useful Post:
Old 03-31-2013, 09:44 AM   #5
Pro
 
acro's Avatar
 
Trade: Electrical
Join Date: Jan 2013
Location: Ohio
Posts: 161
Rewards Points: 531

Re: Considerations For Pouring A Rather Tall Concrete Pier?


Quote:
Originally Posted by 11678 View Post
A large void = future sinkhole ?
I can see where my description might imply that.

Here are a couple of pics.




The original floor was built up about 27" due to flooding, and this service pit was never filled in, just covered over. I suppose got lucky(or unlucky ) when I laid out the cuts for the slab, two of them pretty much lined up with the old access hatch.




I have a little prep work to do.


Last edited by acro; 03-31-2013 at 10:01 AM.
acro is offline  
Old 03-31-2013, 10:07 AM   #6
Pro
 
acro's Avatar
 
Trade: Electrical
Join Date: Jan 2013
Location: Ohio
Posts: 161
Rewards Points: 531

Re: Considerations For Pouring A Rather Tall Concrete Pier?


Is there an engineer around that you can call on to give you some specs for sizes?
I am not familiar with any, but I am in southern Ohio if you know of any.


The culvert pipe is a good idea but what size? (22? 24?)
About 22"


Are you going to lay steel in it?
Was not planning on it.



What strength concrete are you thinking?
5k psi, but that was one of my initial questions.



I don't like the idea of dropping the concrete 13' but if you vibrate it as you go up you can lessen the separation that might occur.
What about adding any friction modifiers or other additives to the mix? The drop would be straight down, so nothing to hit that could separate the mix and cause graveling. That's my thought anyway.


This building is an old service facility for DT&I trains.
acro is offline  
Old 03-31-2013, 10:14 AM   #7
Pro
 
acro's Avatar
 
Trade: Electrical
Join Date: Jan 2013
Location: Ohio
Posts: 161
Rewards Points: 531

Re: Considerations For Pouring A Rather Tall Concrete Pier?


Maybe the point load won't be that great.




That is just an area of about 50'x70'. Ceiling height is about 30'

I've got more pics of that truss, but they would just cause more concern.

Last edited by acro; 03-31-2013 at 10:16 AM.
acro is offline  
Old 03-31-2013, 10:25 AM   #8
Fire up the BBQ
 
griz's Avatar
 
Trade: GC
Join Date: Nov 2009
Location: CA
Posts: 21,539
Rewards Points: 1,808

Re: Considerations For Pouring A Rather Tall Concrete Pier?


If that culvert is going to bear a significant point load it will likely be driven into the ground.

If your goal is to fill the hole & provide a bearing point, why not fill it with CDF and leave the top 6-12" for concrete.

You don't "drop" concrete that far. A pump is used with a snout to place it. You can also push out any water this way.

It would be advisable to consult an Engineer on this.
__________________
SOME JOBS JUST AREN'T WORTH DOING:
griz is online now  
Old 03-31-2013, 10:36 AM   #9
Pro
 
acro's Avatar
 
Trade: Electrical
Join Date: Jan 2013
Location: Ohio
Posts: 161
Rewards Points: 531

Re: Considerations For Pouring A Rather Tall Concrete Pier?


I am not familiar with the costs of CDF. I am waiting for the ventilation to run a while before entering the space, but I figure it is at least 80 yards.

I do certainly prefer the option of filling the hole completely, but want to minimize the $$.


When you say you don't drop concrete that far, I have read otherwise. If the forms can hold the pressure.. and a round culvert will be very strong.

What do you think of this?
Quote:
That "hard splash" you invisioned is actually good as it helps consolidate the concrete in the lower levels. Thats why you don,t need to vibrate concrete that drops more than 20'.
acro is offline  
Old 03-31-2013, 10:41 AM   #10
Fire up the BBQ
 
griz's Avatar
 
Trade: GC
Join Date: Nov 2009
Location: CA
Posts: 21,539
Rewards Points: 1,808

Re: Considerations For Pouring A Rather Tall Concrete Pier?


CDF- Controlled Density Fill.

Basically slurry. Cheaper than concrete & you can dump it right out of the truck into the hole. Also very quick.

Not permitted to drop concrete like that out here.
__________________
SOME JOBS JUST AREN'T WORTH DOING:
griz is online now  
Old 03-31-2013, 10:43 AM   #11
Pro
 
acro's Avatar
 
Trade: Electrical
Join Date: Jan 2013
Location: Ohio
Posts: 161
Rewards Points: 531

Re: Considerations For Pouring A Rather Tall Concrete Pier?


Thanks for mentioning the CDF. I will see if that might be an option around here.
acro is offline  
Old 03-31-2013, 06:07 PM   #12
Number cruncher
 
Mellissam's Avatar
 
Trade: Construction
Join Date: Oct 2009
Posts: 156
Rewards Points: 150

Re: Considerations For Pouring A Rather Tall Concrete Pier?


To take it one step further...if bottom of hole is sound (i.e. good bearing) fill it with a mix (3/8 minus - aka fill) and compact as you fill. Then two feet from top, make your footing with 5/8" rebar and use good concrete 30mpa = 4k psi or better. You'll have a solid footing, and a large one at that. Of course, swing it by an engineer, but it'll likely be your cheapest and less of a headache option...

BTW - A culvert will not blow out when filled with concrete...the max I've gone with sono-tubes (wax cardboard) is 8'...no higher due to drop, not ability of tube to hold it. Just bracing of top and bottom so it stays vertical, and minor uplift force when placing concrete. And I always use rebar so it complicates placement from a height. Almost pointless to use a culvert without rebar, unless an engineer says it can handle the shear requirements. Everything here revolves around seismic considerations.
Mellissam is offline  
Old 03-31-2013, 07:18 PM   #13
Member
 
chew's Avatar
 
Trade: All
Join Date: Apr 2012
Location: MD
Posts: 88
Rewards Points: 117

Re: Considerations For Pouring A Rather Tall Concrete Pier?


The pier will need vertical reinforcement & horizontal ties. No drop more than 5ft. permitted. Use a snout on a pump or a bucket. Call local redi-mix co. they can recommend an engineer. Make sure you protect against vertical lift. I launched an 18" dia. x 14ft form like a missile once.
chew is offline  
The Following User Says Thank You to chew For This Useful Post:
Old 03-31-2013, 08:00 PM   #14
Pro
 
dayexco's Avatar
 
Trade: entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 6,353
Rewards Points: 138

Re: Considerations For Pouring A Rather Tall Concrete Pier?


pump, clean out the debris, use an elephant trunk or a pump...fill it full of k-crete
dayexco is online now  
Old 04-01-2013, 01:23 AM   #15
Number cruncher
 
Mellissam's Avatar
 
Trade: Construction
Join Date: Oct 2009
Posts: 156
Rewards Points: 150

Re: Considerations For Pouring A Rather Tall Concrete Pier?


Quote:
Originally Posted by chew View Post
The pier will need vertical reinforcement & horizontal ties. No drop more than 5ft. permitted. Use a snout on a pump or a bucket. Call local redi-mix co. they can recommend an engineer. Make sure you protect against vertical lift. I launched an 18" dia. x 14ft form like a missile once.
I would have liked to have seen that...lol
That is quite the column...did the bottom blow out? What type of form? Good to know...

I try to use stiff concrete for columns (tell truck beforehand), filling 1/3, then comeback after a bit 15-30min and ease the rest in there...

Noticed on Sonotube site they say can fill a 20' in one lift...wow. I get nervous at 8'...the bottom when tapped feels like it wants to explode. Just an 1/8" of cardboard between me and disaster...
Mellissam is offline  
Old 04-13-2013, 11:40 AM   #16
Registered User
 
ssconstruction's Avatar
 
Trade: home builder
Join Date: Apr 2013
Location: south dakota
Posts: 3
Rewards Points: 10

Re: Considerations For Pouring A Rather Tall Concrete Pier?


not sure if im understanding right. but from what I do under stand is I think you should install a new construction helical in the ground were you put your peir grip-tite had one of best out there go to there site and check it out
http://griptite.com/
they are made to build on unstable ground
ssconstruction is offline  
Old 04-13-2013, 02:43 PM   #17
Pro
 
acro's Avatar
 
Trade: Electrical
Join Date: Jan 2013
Location: Ohio
Posts: 161
Rewards Points: 531

Re: Considerations For Pouring A Rather Tall Concrete Pier?


I have seen the helical piers, and they do seem like a nice option in certain cases. However, we moved forward with the 22" culvert. I have not yet raised the roof and set the post, but preparations are being made.

There are definitely some unknowns regarding what is actually under there, but I am assuming that there is substantial concrete footing under the structure I placed the pier on. The pier is only supporting half of the footer. The other half is resting on the poured wall that forms part of the pit.
acro is offline  
Old 04-22-2013, 03:43 PM   #18
Pro
 
acro's Avatar
 
Trade: Electrical
Join Date: Jan 2013
Location: Ohio
Posts: 161
Rewards Points: 531

Re: Considerations For Pouring A Rather Tall Concrete Pier?


Well, there where no issues filling the culvert and then continuing on with the footing. Did them both in one pour.

Sorry, I didn't get any pics of it, but the concrete crew got it in the hole before I got there.



Finally got some of the fabrication done. Here is some of the progress I made today.

Here is the new post - 16" pipe.


This is fabricated from 6" WF beam. Grout is to assure good even contract with the bottom of the truss.






Just put some slight pressure on it until the grout sets.





Still mulling over how much I want to lift it before setting the "post".
acro is offline  
The Following 2 Users Say Thank You to acro For This Useful Post:
Mellissam (04-24-2013), Wile E Coyote (04-23-2013)
Old 04-23-2013, 06:30 PM   #19
Pro
 
MTN REMODEL LLC's Avatar
 
Trade: Remodel and new build Colorado @ 7651 FT
Join Date: Sep 2010
Posts: 2,193
Rewards Points: 1,428

Re: Considerations For Pouring A Rather Tall Concrete Pier?


Cool job... great pic's..... creative thinking.....

but looks like a commercial job.... why did customer not get some engineering stamps???... just curious
__________________
Never stop learning (xcep fer speling en typeing)
MTN REMODEL LLC is offline  
Old 04-23-2013, 07:26 PM   #20
Pro
 
acro's Avatar
 
Trade: Electrical
Join Date: Jan 2013
Location: Ohio
Posts: 161
Rewards Points: 531

Re: Considerations For Pouring A Rather Tall Concrete Pier?


Thanks, We try to keep everything in house.

Advertisement

acro is offline  
The Following User Says Thank You to acro For This Useful Post:
MTN REMODEL LLC (04-23-2013)


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Powder actuated pins in 4500 psi concrete Calidecks Concrete & Paving 10 10-03-2012 05:55 PM
Crown molding on concrete ceiling CadetC Finish Carpentry 13 09-15-2012 09:14 PM
Concrete overlays, anyone use one? Little Excavation & Site Work 3 08-24-2012 07:09 PM
TYPARŪ Flashing BA - under a concrete floor?? AmeliaP Masonry 5 07-27-2012 04:08 AM
Tire line in concrete after finishing. aydin_eng Flooring 34 03-09-2010 10:03 PM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?