How Much Will You Put Up With During The Estimating Process?

 
Thread Tools Search this Thread Display Modes
Old 03-04-2017, 02:36 PM   #1
Pro
 
Stevarino's Avatar
 
Trade: General contractor specializing in kitchen and bath remodeling and design
Join Date: Sep 2013
Posts: 247
Rewards Points: 415

How Much Will You Put Up With During The Estimating Process?


I have a couple questions here I'll ask after laying out my scenario.

I got a referral from my carpet guy for a half bath remodel. He doesn't know the customer and actually paid $65 to home advisor for the lead. It was out of his scope so he sent it over to me.
The job is 45 minutes away from me so I schedule a time to go look at the job and the lady asks me a dozen questions she seems kinda particular and skeptical. I answer her questions even give her some suggestions for a future main bath remodel and a kitchen remodel. She only wants a quote for he half bath right now. I work it up and send it over to her. She emails me back several more questions. Then wants to change some things. I update quote and send it back. Another round of questions. Asks for references (which no one ever asks me for but whatever) I give her references. She calls at least one of the references and gives them the third degree on me.
Gets back with me with her final material selections and asks if she buys paint how much will I take off quote. I tell her. She then changes the scope again and has me update the quote a fourth time. I'm really annoyed at this point because I'm wasting too much time.
So today I get a call from her husband who says they both have several questions and would like me to come out on an evening or weekend when they are both home to discuss before moving forward.

I hate giving up evenings and weekends. I know that's picky but I have a wife and two young boys and a third due any day. My family time is sacred and I'm willing to grow my business a little slower by not sacrificing too much family time. I will work on weekends on occasion when needed or do a quote in an evening on occasion if it seems worthwhile.

How much back and forth are you willing to go through on a quote before you deem it a waste?
How many trips to a potential job will you make?
At what point is a customer asking too many questions and taking up too much time? Especially on small jobs that don't have a lot of profit to begin with such as a small half bath.

End of rant




Sent from my iPhone using Tapatalk
Stevarino is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 03-04-2017, 02:47 PM   #2
Pro
 
MarkJames's Avatar
 
Trade: Essential Handyman Services
Join Date: Nov 2012
Location: Arlington, VA
Posts: 10,369
Rewards Points: 18,979

Re: How Much Will You Put Up With During The Estimating Process?


Quote:
Originally Posted by Stevarino View Post
I have a couple questions here I'll ask after laying out my scenario.

I got a referral from my carpet guy for a half bath remodel. He doesn't know the customer and actually paid $65 to home advisor for the lead. It was out of his scope so he sent it over to me.
The job is 45 minutes away from me so I schedule a time to go look at the job and the lady asks me a dozen questions she seems kinda particular and skeptical. I answer her questions even give her some suggestions for a future main bath remodel and a kitchen remodel. She only wants a quote for he half bath right now. I work it up and send it over to her. She emails me back several more questions. Then wants to change some things. I update quote and send it back. Another round of questions. Asks for references (which no one ever asks me for but whatever) I give her references. She calls at least one of the references and gives them the third degree on me.
Gets back with me with her final material selections and asks if she buys paint how much will I take off quote. I tell her. She then changes the scope again and has me update the quote a fourth time. I'm really annoyed at this point because I'm wasting too much time.
So today I get a call from her husband who says they both have several questions and would like me to come out on an evening or weekend when they are both home to discuss before moving forward.

I hate giving up evenings and weekends. I know that's picky but I have a wife and two young boys and a third due any day. My family time is sacred and I'm willing to grow my business a little slower by not sacrificing too much family time. I will work on weekends on occasion when needed or do a quote in an evening on occasion if it seems worthwhile.

How much back and forth are you willing to go through on a quote before you deem it a waste?
How many trips to a potential job will you make?
At what point is a customer asking too many questions and taking up too much time? Especially on small jobs that don't have a lot of profit to begin with such as a small half bath.

End of rant

Sent from my iPhone using Tapatalk
Maybe they're too far away, but that's on you.

They sound like they're still in the normal range of client, but you can't let yourself get pushed around. If you think you may land the job, how about phoning them to reassess? Explain that you need to stay close to home this week, but would like to answer their questions sooner than later, etc. And if they're almost ready to make a commitment (ask them), then go for the appointment.

Advertisement

MarkJames is online now  
Old 03-04-2017, 02:51 PM   #3
I'm on a boat!
 
J L's Avatar
 
Trade: Yacht carpenter
Join Date: Nov 2009
Location: West Palm Beach, FL
Posts: 3,178
Rewards Points: 3,468

Re: How Much Will You Put Up With During The Estimating Process?


1 round of changes. More changes only happen with a signed contract and as change orders. If change orders take more than 10 minutes to write up then my time gets billed whether they approve the change order or not.
J L is offline  
The Following 2 Users Say Thank You to J L For This Useful Post:
B.Johnson (03-04-2017), TaylorMadeAB (03-05-2017)
Sponsored Links
Advertisement
 
Old 03-04-2017, 03:14 PM   #4
Fire up the BBQ
 
griz's Avatar
 
Trade: GC
Join Date: Nov 2009
Location: ex-calif
Posts: 23,175
Rewards Points: 1,962

Re: How Much Will You Put Up With During The Estimating Process?


Quote:
Originally Posted by Stevarino View Post
...How much back and forth are you willing to go through on a quote before you deem it a waste?
How many trips to a potential job will you make?
At what point is a customer asking too many questions and taking up too much time? Especially on small jobs that don't have a lot of profit to begin with such as a small half bath.

End of rant...
Sent from my iPhone using Tapatalk
depends how big a job it is.

from what you are describing i would have been done about 4 phone calls ago,,,,
__________________
SOME JOBS JUST AREN'T WORTH DOING:
griz is online now  
The Following 5 Users Say Thank You to griz For This Useful Post:
Calidecks (04-07-2017), greg24k (03-06-2017), Jaws (03-04-2017), Seven-Delta-FortyOne (03-11-2017), sunkist (03-04-2017)
Old 03-04-2017, 03:24 PM   #5
Pro
 
VinylHanger's Avatar
 
Trade: I'll do that for 500 bucks.
Join Date: Jul 2011
Location: Oregon
Posts: 10,644
Rewards Points: 12,964

Re: How Much Will You Put Up With During The Estimating Process?


You need to step back and think if it would be different if they were closer. It isn't their fault you are 45 minutes away. Remember, to you a half bath remodel is a small job, but to them it may be the biggest thing they have done, or they have saved up for a few years to do it.

If they were close by, you probably would think it was a great little gig to fill in and would work to make it happen. If that is the case, then it is the distance, and you need to rethink that part.

Not sure if I would do a half bath that far away, unless it was a great customer, or I also signed for the other parts at the same time. Do you want to drive 45 minutes, to touch up some paint, or drywall, or even do the small amount of drywall that would be done with repeated trips to tape, texture and paint? Then meet with the electrician and plumber, then meet with the owners for small changes?
__________________
Your emergency does not constitute a problem with my Constitution.
VinylHanger is offline  
The Following 2 Users Say Thank You to VinylHanger For This Useful Post:
CharlieDelta (03-06-2017), MonsieurBon (03-05-2017)
Old 03-04-2017, 05:39 PM   #6
Pro
 
sunkist's Avatar
 
Trade: builder fl cbc
Join Date: Apr 2012
Location: bradenton fl
Posts: 3,069
Rewards Points: 890

Re: How Much Will You Put Up With During The Estimating Process?


Im with griz, you will have done a weeks work for zero soon, and you still have not got a signed contract, and if and when you get a signed contract you will regret it, in the words of some one else "RUN FOREST RUN"
sunkist is offline  
The Following User Says Thank You to sunkist For This Useful Post:
rjconstructs (04-10-2017)
Old 03-04-2017, 06:07 PM   #7
Pro
 
rselectric1's Avatar
 
Trade: Licensed Electrical Contractor and Remodeler
Join Date: Sep 2009
Location: Chicago Suburbs
Posts: 11,897
Rewards Points: 946

Re: How Much Will You Put Up With During The Estimating Process?


Sounds typical on my jobs. I can usually handle all that over the phone though after one thorough walk through.

It sounds like they are very interested in you doing the job. I really can't blame them when there are so many hacks and thieves out there posing as contractors.

Keep us posted.
__________________
220...221...whatever it takes!
rselectric1 is offline  
Old 03-04-2017, 06:10 PM   #8
Pro
 
SearchforSignal's Avatar
 
Trade: Low voltage
Join Date: Aug 2016
Posts: 449
Rewards Points: 740

Re: How Much Will You Put Up With During The Estimating Process?


I charge in 15 min increments. I have a small small business and the initial quote is free. After that I charge for drive time. Change orders ect. It's all up to you and how bad u want this job. I would have said I'm not your guy after they asked u to drive out again.
SearchforSignal is offline  
Old 03-05-2017, 12:35 AM   #9
Pro
 
TaylorMadeAB's Avatar
 
Trade: Renovations
Join Date: Nov 2014
Location: Alberta
Posts: 794
Rewards Points: 1,686

Re: How Much Will You Put Up With During The Estimating Process?


First estimate is free. Answer some questions, maybe tweak an item or two, but after that you should have a commitment from them before revising anything else.
I'd prepare them over the phone that if you come out to meet them, you'll be bringing a contract with you that needs to be signed.


Sent from my iPhone using Tapatalk
TaylorMadeAB is offline  
Old 03-05-2017, 06:46 AM   #10
Pro
 
builditguy's Avatar
 
Trade: Carpentry
Join Date: Nov 2013
Location: Missouri
Posts: 2,329
Rewards Points: 2,072

Re: How Much Will You Put Up With During The Estimating Process?


Same opinion here.

I'm not surprised they are checking you references. Remember, this all started with an online referral. They have no idea who you are or your quality of work.

Think about how much time you have already spent, quoting this job.

The fact that they are 45 minutes away really depends on your area. For me, a 45 minute drive, I would have never looked at it.

I'm also guessing you give free estimates. Of course your free estimate is really a free quote. Right?

The days of free quotes, are over for me. I give free estimates. They are broad in scope. I can give an estimate on a half bath, in less than 10 minutes. If they want a quote, I charge for it. I don't charge much. For a half bath, I would charge $100. I know it doesn't cover my time, but it sets a president. I've been charging for the last 2 years. I've never had anyone complain, question it, or decline having me look at their project.
I should have started charging years ago. Foolish on my part. I was following the herd.

People are going to tell you that customers won't pay for quotes. They will. These people already paid $65 just to get a phone number.

In your case, I think they are going to have you do the work. If you don't want to work on nights or weekends, don't. Try to get them to agree to a late afternoon meeting. That way you aren't sacrificing your nights completely and they have a little invested in it.
builditguy is offline  
The Following 2 Users Say Thank You to builditguy For This Useful Post:
CharlieDelta (03-06-2017), Rock Headed (05-27-2017)
Old 03-05-2017, 07:46 AM   #11
Wormdrive Operator
 
heavy_d's Avatar
 
Trade: Contractor
Join Date: Dec 2012
Location: Durham Region, Ontario
Posts: 3,318
Rewards Points: 6,888

Re: How Much Will You Put Up With During The Estimating Process?


I think his buddy paid 65 for the lead, not the other way around.

Sent from my SGH-I337M using Tapatalk
__________________
Aztec Decks
Oshawa deck builder
heavy_d is offline  
Old 03-05-2017, 08:36 AM   #12
Design/Build
 
NJ Contractor's Avatar
 
Trade: GC
Join Date: Nov 2016
Location: New Jersey
Posts: 1,054
Rewards Points: 1,100

Re: How Much Will You Put Up With During The Estimating Process?


Depends on the client and size of the project. I normally will not take a project that size that is 45 minutes away. But for discussion purposes let's say 1 site visit to meet with the clients, make sure they aren't crazy and to scope the project.

The rest can be done via conference calls or email. After a couple of calls or emails I can usually tell if it is worth pursuing or putting to bed.
NJ Contractor is online now  
Old 03-05-2017, 01:20 PM   #13
Pro
 
Stevarino's Avatar
 
Trade: General contractor specializing in kitchen and bath remodeling and design
Join Date: Sep 2013
Posts: 247
Rewards Points: 415

Re: How Much Will You Put Up With During The Estimating Process?


The biggest issue for me is that they seem to be wasting my time and tire kicking. The 45 min drive is just another reason not to want to drive back out. I usually try to give ballpark "estimates" over the phone before I go look at a job. It saves me a trip if someone is going to get sticker shock from a ballpark figure and have unrealistic budget expectations. Sometimes people insist I come out and look and in this case I did. So after looking at the job (literally a 21 Sq ft half bath) and answering a dozen questions and re-working the quote 4 times for minor changes and having them call for references I cannot fathom what questions they could have that would require me to meet them at their house all with no commitment to sign a contract or move forward. If they are that skeptical of me as a contractor at this point red flags start popping up. This seems to be the type of customer that can't be pleased or is looking for excuses to get you to drop your price. I also offered to meet them again if they could do it early morning or in an afternoon
I emailed them back and told them that I will not have an evening or weekend available for quite a while but I would be happy to answer any questions they had over the phone. If I don't hear back from them because of that then I'm happy because I don't need that kind of customer.


Sent from my iPhone using Tapatalk
Stevarino is offline  
The Following User Says Thank You to Stevarino For This Useful Post:
A&E Exteriors (04-10-2017)
Old 03-05-2017, 04:06 PM   #14
Pro
 
TimberlineMD's Avatar
 
Trade: Remodeling Contractor
Join Date: Jan 2008
Location: Arizona
Posts: 440
Rewards Points: 738

Re: How Much Will You Put Up With During The Estimating Process?


You need to have them put some 'skin in the game'. That would be money if it was me. Whatever it is for you, you need them to commit something before you see them in person again.

I have a simular situtation where a passed customer wanted me to look at some water damage to his kitchen. I normally charge for insurance quotes, but if your a passed customer I may waive the fee. Very small job and the leak was in his roof, which I didn't want to do, so I refered him to my roofer, who took care of it.

Adjuster wants a detailed SOW for the interior damage from me. I tell the customer 'if I get involved the cost to him is $xx.xx'. He tells me he wants it done right and he wants only me to do the work.

Insurance settles, roofer makes his repair. Customers calls me to start work. I tell him I will come by Monday with the contract. He tells me to 'hold up' as he feels that we 'need to talk about reducing the scope of work'. I read this as 'now that I got as much as I can from my insurance we need to reduce your price to do the job'.

He will get a phone call from me Monday telling him I am not interested in the job. If the check is written in my companys name and his then 'that's his problem'.

I'm way too old for this...
__________________
It's easy to have a business that is busy.. it's harder to have a business that makes a profit
TimberlineMD is offline  
The Following User Says Thank You to TimberlineMD For This Useful Post:
kirkdc (05-11-2017)
Old 03-05-2017, 07:52 PM   #15
Pro
 
builditguy's Avatar
 
Trade: Carpentry
Join Date: Nov 2013
Location: Missouri
Posts: 2,329
Rewards Points: 2,072

Re: How Much Will You Put Up With During The Estimating Process?


Quote:
Originally Posted by heavy_d View Post
I think his buddy paid 65 for the lead, not the other way around.

Sent from my SGH-I337M using Tapatalk


Oh. Obviously I don't know how it works.


Sent from my iPhone using Tapatalk
builditguy is offline  
Old 03-05-2017, 09:10 PM   #16
Pro
 
KAP's Avatar
 
Trade: Custom
Join Date: Feb 2011
Posts: 12,278
Rewards Points: 39,768

Re: How Much Will You Put Up With During The Estimating Process?


Quote:
Originally Posted by Stevarino View Post
The biggest issue for me is that they seem to be wasting my time and tire kicking. The 45 min drive is just another reason not to want to drive back out. I usually try to give ballpark "estimates" over the phone before I go look at a job. It saves me a trip if someone is going to get sticker shock from a ballpark figure and have unrealistic budget expectations. Sometimes people insist I come out and look and in this case I did. So after looking at the job (literally a 21 Sq ft half bath) and answering a dozen questions and re-working the quote 4 times for minor changes and having them call for references I cannot fathom what questions they could have that would require me to meet them at their house all with no commitment to sign a contract or move forward. If they are that skeptical of me as a contractor at this point red flags start popping up. This seems to be the type of customer that can't be pleased or is looking for excuses to get you to drop your price. I also offered to meet them again if they could do it early morning or in an afternoon
I emailed them back and told them that I will not have an evening or weekend available for quite a while but I would be happy to answer any questions they had over the phone. If I don't hear back from them because of that then I'm happy because I don't need that kind of customer.


Sent from my iPhone using Tapatalk


They've had their questions addressed by phone and email... no reason you need to drive out another 1 1/2 trip AGAIN (plus meeting time) to address some more...

That is, unless they're paying you for your time...

Last edited by KAP; 03-05-2017 at 09:12 PM.
KAP is offline  
The Following User Says Thank You to KAP For This Useful Post:
greg24k (03-06-2017)
Old 03-05-2017, 09:17 PM   #17
Pro
 
MarkJames's Avatar
 
Trade: Essential Handyman Services
Join Date: Nov 2012
Location: Arlington, VA
Posts: 10,369
Rewards Points: 18,979

Re: How Much Will You Put Up With During The Estimating Process?


Then again, if you need the work, you do it and learn from it for next time. Work the phone. Don't let your pride make you bug out prematurely if you're almost there. Maybe half the neighbors will want work done after you get over the hurdle of these folks.

I am thinking about a few clients I let go, who ended up doing exactly my "plan" with the next guy. I probably should have stuck it out and got it closed.
MarkJames is online now  
Old 03-05-2017, 09:26 PM   #18
Pro
 
RMDailey's Avatar
 
Trade: Carpenter
Join Date: Nov 2016
Location: Bryan-College Station, Texas
Posts: 127
Rewards Points: 288

Re: How Much Will You Put Up With During The Estimating Process?


Man I feel you. I'm a small time guy but i just gave up on a $6000 painting job on a huge house (to me anyway). Wanted references, gave references, wanted more references, complained that I got mud in their house or something. Finally I just quit bothering. And their HOA recommended me to them in the first place.

I don't even answer my phone on the weekends anymore. I'd use to go do estimates on Saturdays but not anymore. I might make an exception for one of my repeat customers but they respect me enough to value my family time (which is why I'm willing to work harder to meet there needs). I had lead insist on meeting me on a Saturday and I told him that I charge a $100 consultation fee on Saturdays, never heard back.

If you're at the point where you are good at what you do, have great references and referrals you don't have to chase annoying clients. I work 12+ hour days M-F so I can spend time with my family on the weekends.

So to some up: Ask for your deposit before making anymore changes or tell them to find someone else.
RMDailey is offline  
Old 03-06-2017, 07:03 AM   #19
General Contractor
 
greg24k's Avatar
 
Trade: New Home Construction-Additions-Remodeling
Join Date: May 2007
Location: NJ
Posts: 7,735
Rewards Points: 8,660

Re: How Much Will You Put Up With During The Estimating Process?


Tell her to go fk herself, this is the type of a job where you never leave and no matter what you do, they will never be satisfied and you still gonna get a s^*t rap and for the amount of money that you can make remodeling 1/2 bath not worth the hassle driving 45min to put up with BS.

That being said all sites like home adviser and other sites alike where contractors pay for leads, they have a bunch of weirdoes on them who think they can get away with anything because they think that they own you and if you do something wrong or something they don't like they can ruin your reputation by giving you a bad rap on there.
__________________
I never lost a cent on the jobs I didn't get!
greg24k is online now  
Old 03-06-2017, 08:26 AM   #20
Pro
 
Stevarino's Avatar
 
Trade: General contractor specializing in kitchen and bath remodeling and design
Join Date: Sep 2013
Posts: 247
Rewards Points: 415

Re: How Much Will You Put Up With During The Estimating Process?


Quick update. The husband called me back and was willing to ask all his questions over the phone. It was a lot of random specific questions about how I was going to level (flatten) their floor and if the grout was going to need sealed so it didn't come up when the swept (apparently someone did a horrible job in the past for them if the are worried grout will sweep away) they wanted to know if the plumbing was going to be hidden behind the pedestal and if I could sand the walls before I painted. Nothing out of what I would normally do anyway. He said they had been burned by a contractor in the past and just want to make sure they get a flawless job so they can brag on me blah blah. He apologized for being such a pain and taking up my time and thanked me for being patient. He then said he was pretty sure they wanted me to do the job and would call back in a few days to confirm and schedule.

I appreciated the apology and that they at least recognized they were being a pain haha. That goes a long way with me. So if they call back to schedule I'll be happy to go ahead a do the job and will ask for 1/2 up front on start up as I usually do with non repeat customers. Maybe it will be a good opportunity for referrals as it is a condo in a nice complex and they also want their kitchen remodeled at some point.

Either way I'm going to proceed with caution

Sent from my iPhone using Tapatalk

Advertisement

Stevarino is offline  
The Following 2 Users Say Thank You to Stevarino For This Useful Post:
KAP (03-06-2017), MarkJames (03-06-2017)


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Deck Estimating Colorado_J General Discussion 8 07-24-2016 10:31 PM
Process for shimming for pocket door opening... Spencer Finish Carpentry 15 04-23-2016 10:57 PM
Estimating subs Tylerwalker32 General Discussion 45 01-21-2013 11:16 PM
Estimating Software DIGGN4U Technology 0 03-13-2011 08:48 AM
Info Needed on Lumber Estimating for Residential Construction bigbuilderagent Framing 28 12-18-2010 11:23 AM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?