I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


I am about to start doing work for a new contractor this year doing his roofing projects. I myself do general contracting however, I have done roofing as my main thing over my career. I do not have the manpower on my crew to handle the volume this contractor will be giving me and I have hired another subcontractor under me that I trust to handle the volume. The problem resides with the fact that I am now in fact double subbing and someone has to eat the costs of that inefficiency. I know the work and I know it deserves the pricing it demands and my subcontractor has given me a locked in price structure for the year that is along where I would do it myself. I Have informed the GC to the fact that this is how it will be if he hires me for sure and that I will be higher priced compared to others out there and with that he gets my business skills and the handling of things when they come up and keeping issues out of his mind in relation to the roofing projects he gives me. My issue is I know I am marking up to higher prices but what would be right? lets say My sub charges 70/sq I initially am thinking a 15% would be fair which would make my pricing 82.35/sq.

Anyone have some input or suggestions? Is this something I should pass on? He is a very nice guy and has tons of work based on his reputation and he said he will pay more to keep that. I like to believe that my work reflects high quality in service and trade up to the standards he would like.
Sniffer is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 04-03-2014, 09:25 AM   #2
Pro
 
stombaugh85's Avatar
 
Trade: Roofing
Join Date: Jul 2012
Location: USA
Posts: 318
Rewards Points: 284

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


Quote:
Originally Posted by Sniffer View Post
I am about to start doing work for a new contractor this year doing his roofing projects. I myself do general contracting however, I have done roofing as my main thing over my career. I do not have the manpower on my crew to handle the volume this contractor will be giving me and I have hired another subcontractor under me that I trust to handle the volume. The problem resides with the fact that I am now in fact double subbing and someone has to eat the costs of that inefficiency. I know the work and I know it deserves the pricing it demands and my subcontractor has given me a locked in price structure for the year that is along where I would do it myself. I Have informed the GC to the fact that this is how it will be if he hires me for sure and that I will be higher priced compared to others out there and with that he gets my business skills and the handling of things when they come up and keeping issues out of his mind in relation to the roofing projects he gives me. My issue is I know I am marking up to higher prices but what would be right? lets say My sub charges 70/sq I initially am thinking a 15% would be fair which would make my pricing 82.35/sq.

Anyone have some input or suggestions? Is this something I should pass on? He is a very nice guy and has tons of work based on his reputation and he said he will pay more to keep that. I like to believe that my work reflects high quality in service and trade up to the standards he would like.

Where you located?

Advertisement

stombaugh85 is offline  
Old 04-03-2014, 09:28 AM   #3
Registered User
 
Sniffer's Avatar
 
Trade: Roofing
Join Date: Apr 2014
Posts: 5
Rewards Points: 10

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


Twin cities mn
Sniffer is offline  
Sponsored Links
Advertisement
 
Old 04-03-2014, 09:45 AM   #4
Pro
 
stombaugh85's Avatar
 
Trade: Roofing
Join Date: Jul 2012
Location: USA
Posts: 318
Rewards Points: 284

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


Quote:
Originally Posted by Sniffer View Post
Twin cities mn
I would keep your price as low as possible. If you can keep this guy happy then he will feed you more work.

You will be in business a very long time....

Give him a great deal now and he'll get more work lined up.

Charging by the square is the best way, sounds like you got it all figured out already. And definitely lock in your prices for the whole year.
stombaugh85 is offline  
Old 04-03-2014, 10:29 AM   #5
Member
 
Allcity1's Avatar
 
Trade: Roofing and siding
Join Date: Mar 2014
Location: WI
Posts: 37
Rewards Points: 60

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


Quote:
Originally Posted by Sniffer
I am about to start doing work for a new contractor this year doing his roofing projects. I myself do general contracting however, I have done roofing as my main thing over my career. I do not have the manpower on my crew to handle the volume this contractor will be giving me and I have hired another subcontractor under me that I trust to handle the volume. The problem resides with the fact that I am now in fact double subbing and someone has to eat the costs of that inefficiency. I know the work and I know it deserves the pricing it demands and my subcontractor has given me a locked in price structure for the year that is along where I would do it myself. I Have informed the GC to the fact that this is how it will be if he hires me for sure and that I will be higher priced compared to others out there and with that he gets my business skills and the handling of things when they come up and keeping issues out of his mind in relation to the roofing projects he gives me. My issue is I know I am marking up to higher prices but what would be right? lets say My sub charges 70/sq I initially am thinking a 15% would be fair which would make my pricing 82.35/sq. Anyone have some input or suggestions? Is this something I should pass on? He is a very nice guy and has tons of work based on his reputation and he said he will pay more to keep that. I like to believe that my work reflects high quality in service and trade up to the standards he would like.
Who handles deliveries, colors, schedules, warranty ? Labor only? How many roofs? 1 or 4 a month? You need a sub at 50 and you charge 90.
Allcity1 is offline  
Old 04-03-2014, 11:03 AM   #6
Registered User
 
Sniffer's Avatar
 
Trade: Roofing
Join Date: Apr 2014
Posts: 5
Rewards Points: 10

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


At this point, he handles sales, color, delivery etc..warranty is another thing, that will need to be discussed. However, on the other hand I will be handling anything that pops up during the work. Handling the customer on the job, and just being the face of the workers in a sense.
Sniffer is offline  
Old 04-03-2014, 11:35 AM   #7
Registered User
 
Sniffer's Avatar
 
Trade: Roofing
Join Date: Apr 2014
Posts: 5
Rewards Points: 10

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


Also as of now it looks to be about 1-5 a month starting out and progressing from there.
Sniffer is offline  
Old 04-03-2014, 11:53 AM   #8
Have Trowel, Do travel
 
brunothedog's Avatar
 
Trade: Artisan
Join Date: Sep 2013
Location: international
Posts: 909
Rewards Points: 1,188

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


its a bad road your going down, a sub subbing out, why should the GC give you more than the sub your giving
?
__________________
I used to love the days when you could look at an unattended bag on a train or bus and think to yourself...'Iím going to take that.'
brunothedog is offline  
Old 04-03-2014, 12:16 PM   #9
Registered User
 
Sniffer's Avatar
 
Trade: Roofing
Join Date: Apr 2014
Posts: 5
Rewards Points: 10

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


He told me he will pay for quality, as in he has a very strong reputation in the area and 90% of the work is referral and prior customers. I can deliver the quality experience and dedication to the actual product as that is the same way I get most of my work. In his words he wants to create a better image for roofing than in the past and is willing to pay for that, which is where I come in.
Sniffer is offline  
Old 04-03-2014, 12:20 PM   #10
GC/carpenter
 
Calidecks's Avatar
 
Trade: Decking, Railing, Carpenter/General Contractor
Join Date: Nov 2011
Location: Anaheim Hills, California (OC)
Posts: 38,582
Rewards Points: 4,168

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


You should of charged the same price from the beginning including the 15% markup. This way he doesn't feel like he's paying for the job and a superintendent, on the jobs your not doing. Now he won't know his costs before he bids. He has no way of knowing if your going to do the job or if this will be one your too busy to get to.
Calidecks is online now  
The Following User Says Thank You to Calidecks For This Useful Post:
CompleteW&D (04-03-2014)
Old 04-03-2014, 12:28 PM   #11
Pro
 
CompleteW&D's Avatar
 
Trade: Windows, Doors, Siding, Enclosures
Join Date: May 2011
Location: Indianapolis, IN
Posts: 2,495
Rewards Points: 2,936

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


Quote:
Originally Posted by Californiadecks View Post
You should of charged the same price from the beginning including the 15% markup. This way he doesn't feel like he's paying for the job and a superintendent, on the jobs your not doing. Now he won't know his costs before he bids. He has no way of knowing if your going to do the job or if this will be one your too busy to get to.
I agree with Mike.... Figure out a rate you can live with and that's your FIRM price you give the guy, no matter which crew you use. If you sub it out, you make a little less. If your crew does it, then you make a little more.

Good luck.
__________________
- John Williams
Complete Window and Door
Quote:
Originally Posted by TNTSERVICES View Post
As accomplishments go, getting me to talk is an easy one.
CompleteW&D is offline  
The Following User Says Thank You to CompleteW&D For This Useful Post:
Calidecks (04-03-2014)
Old 04-03-2014, 01:14 PM   #12
Pro
 
Anti-wingnut's Avatar
 
Trade: Commercial Superintendent
Join Date: Mar 2009
Posts: 2,939
Rewards Points: 3,428

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


And no crying at this forum in six months when the GC and sub-sub get together and cut you out of the equation.
Anti-wingnut is offline  
Old 04-03-2014, 01:23 PM   #13
Have Trowel, Do travel
 
brunothedog's Avatar
 
Trade: Artisan
Join Date: Sep 2013
Location: international
Posts: 909
Rewards Points: 1,188

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


Quote:
Originally Posted by Anti-wingnut View Post
And no crying at this forum in six months when the GC and sub-sub get together and cut you out of the equation.
infact, if the subs sub is as good as the sub, And the GC is a god loving christian with strong morals and the "I dont care if I make money, as long as my subs ( and their subs) are happy" that everybody loves,
you should have no problems.

Your best bet and least of problems is to ask the sub for a percentage up front, for the work your passing to him, a 5% maybe,
Then have him meet with the GC and let them take care of their business.

That way if problems accur, they are not yours and the god loving GC will always come back to you,

Putting your self in the middle with no real substantial gain(money wise)
is a bad decision.

the worst that could happen is you lose a sub,GC and a reputation and for what, a few bucks.

never risk in business if there is nothing to gain
__________________
I used to love the days when you could look at an unattended bag on a train or bus and think to yourself...'Iím going to take that.'
brunothedog is offline  
The Following User Says Thank You to brunothedog For This Useful Post:
jhark123 (04-03-2014)
Old 04-03-2014, 04:02 PM   #14
Pro
 
CompleteW&D's Avatar
 
Trade: Windows, Doors, Siding, Enclosures
Join Date: May 2011
Location: Indianapolis, IN
Posts: 2,495
Rewards Points: 2,936

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


I suppose it all depends on the character of the GC. I pay my main sub (he runs several crews - which I am sure are subs for him) and they do EXCELLENT work for me. It's to MY standards, I'm comfortable with his pricing, and I get excellent service from him all around.

So, why in the world would I try and "steal" any of his guys, just to save a few bucks? That would be a horrible business decision on my part. I would be placing my eggs in one basket. And my guess is, the minute I couldn't keep him busy 24/7, he would bolt right back to my main sub. But, I would have ruined my good name with my main sub and he would likely refuse to work for me again.
__________________
- John Williams
Complete Window and Door
Quote:
Originally Posted by TNTSERVICES View Post
As accomplishments go, getting me to talk is an easy one.

Last edited by CompleteW&D; 04-03-2014 at 04:04 PM.
CompleteW&D is offline  
The Following User Says Thank You to CompleteW&D For This Useful Post:
FerrisHI (04-03-2014)
Old 04-03-2014, 05:39 PM   #15
Pro
 
BamBamm5144's Avatar
 
Trade: Everything Exterior, Mostly Roofing.
Join Date: Jul 2008
Location: Wisconsin
Posts: 7,181
Rewards Points: 2,786

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


This is so dumb I can't even put it into words.
BamBamm5144 is offline  
Old 04-03-2014, 05:50 PM   #16
Pro
 
MJW's Avatar
 
Trade: General Contractor, Roofing, siding, windows
Join Date: Jan 2006
Location: MN
Posts: 1,934
Rewards Points: 1,772

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


Quote:
Originally Posted by BamBamm5144 View Post
This is so dumb I can't even put it into words.
This is almost considered normal here.

This Contractor WILL drop this guy in six months. We have lost out on some of the largest and best builders in this state for cheaper labor. The Mexi's will do them for $25 a square. Especially if there aren't enough storms.

Many Contractors that do roofing in MN is a sub of a sub of a sub.

Hey sniffer, make sure they are at least licensed. If not, not legal here.


These kind of GC's will string a guy along for a long time waiting for payment too. They will want quite a few done before you are paid.

If you have enough of your own work, I wouldn't even bother with them. 1-5 houses a week? This company doesn't give a rats ass about their subs.

Last edited by MJW; 04-03-2014 at 05:54 PM.
MJW is offline  
Old 04-03-2014, 06:25 PM   #17
LRG WoodCrafting

 
Leo G's Avatar
 
Trade: Maker of Fine Sawdust
Join Date: May 2005
Location: Windsor Locks, Connecticut
Posts: 41,744
Rewards Points: 1,467

Re: I Am Sub-Contracting & Need To Hire A Sub Under Me. What Margin Should I Do?


Thank you for posting on ContractorTalk.com. Straight pricing questions are frowned upon here, as are 'Going Rate' questions. If you are a contractor seeking advice regarding your pricing structure, the Moderators of this forum would like to direct you to this thread: "Pricing, Estimating and Success".

ContractorTalk.com is designed for professional contractors to discuss issues and topics related to the construction and remodeling industries.

We apologize for any inconvenience that this may have caused. This thread has been closed.

Advertisement

__________________
Sawdust Follows Me Everywhere
I can explain it to you, but I can't understand it for you.
Sanding is the bane of my existence
WWG1WGA

Quote:
Originally Posted by HusqyPro View Post
Carpenter by day.
Mad scientist by night.
http://lrgwood.com
Custom Cabinets in Hartford County Connecticut
Leo G is online now  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Why do people hire web designers to do their SEO or SEM cjaccardi Websites and SEO 8 02-08-2010 01:43 PM
Engineering Margin of Safety jonjenk Framing 14 02-04-2010 04:40 PM
new small plant hire company neig11 New Member Introductions 1 01-06-2010 09:00 AM
Advice on a New Hire CookeCarpentry Business 69 08-03-2009 10:06 PM
Charge by Markup or Margin? yoyoma Remodeling 2 09-13-2008 09:30 PM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?