Need To Learn To Estimate Pool Jobs


Hey all,
First time doing a forum. I am an electrician in Louisiana and just recently got my license for pools. I am new to having to bid and estimate pool jobs and am not sure how it typically is priced out. Any and all information would be greatly appreciated. Details and specifics are awesome as well.

Thanks in advance,
Klein
Klein225 is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 04-02-2014, 11:02 PM   #2
Pro
 
Stoneyard's Avatar
 
Trade: Journeyman Carpenter
Join Date: Mar 2014
Location: Mn.
Posts: 106
Rewards Points: 249

Re: Need To Learn To Estimate Pool Jobs


Utilize your competition, call them and get a few quotes... And go from there.

Advertisement

Stoneyard is offline  
Old 04-03-2014, 03:59 AM   #3
Pro
 
Big Shoe's Avatar
 
Trade: Carpentry,drywall,trim. Part time painter.
Join Date: Jun 2008
Location: Florida
Posts: 4,459
Rewards Points: 2,024

Re: Need To Learn To Estimate Pool Jobs


Klein. First, can you explain what you mean by ''I'm a electrician and got my license for pools''? I don't think there is such a thing here in Florida.

Second, there is now way anyone could answer that question. Too many variables. You run power to the equipment. How much for materials and labor for starters.

I would think/hope you already have an idea what the cost should be.

This may get shut down.
__________________
Expect the Unexpected
Big Shoe is offline  
Sponsored Links
Advertisement
 
Old 04-03-2014, 06:19 AM   #4
Pro
 
RobertCDF's Avatar
 
Trade: Custom deck builder
Join Date: Aug 2005
Location: Colorado Springs, Colorado
Posts: 9,177
Rewards Points: 1,533

Re: Need To Learn To Estimate Pool Jobs


Quote:
Originally Posted by Stoneyard View Post
Utilize your competition, call them and get a few quotes... And go from there.
I sniff you guys out in a heartbeat... not happening. Learn your own numbers.
RobertCDF is offline  
The Following 4 Users Say Thank You to RobertCDF For This Useful Post:
66 Shelby (04-03-2014), rotarex (04-03-2014), Sir Mixalot (04-03-2014), stombaugh85 (04-03-2014)
Old 04-03-2014, 06:31 AM   #5
90%-er
 
onmywayup's Avatar
 
Trade: Remodeling
Join Date: Aug 2012
Location: Southeast Michigan
Posts: 1,095
Rewards Points: 2,164

Re: Need To Learn To Estimate Pool Jobs


Also, if anybody would like to come up to Michigan, wipe my arse for me, completely run my business for me, and teach me to get rich quick, I'd appreciate that too

Last edited by Gus Dering; 04-03-2014 at 07:14 AM.
onmywayup is offline  
The Following 2 Users Say Thank You to onmywayup For This Useful Post:
66 Shelby (04-03-2014), Big Shoe (04-03-2014)
Old 04-03-2014, 09:58 AM   #6
Pro
 
Tiger's Avatar
 
Trade: Electrical Contractor
Join Date: Nov 2007
Location: Northern Illinois
Posts: 929
Rewards Points: 718

Re: Need To Learn To Estimate Pool Jobs


Although profit is actually a divided decimal this will work for a start. Loaded labor includes overhead.

((materials + material markup) + loaded labor) + profit = job price
__________________
www.TigerElectrical.com
Tiger is offline  
Old 04-03-2014, 10:39 AM   #7
The Dude
 
smalpierre's Avatar
 
Trade: home improvement
Join Date: Jan 2011
Location: Sunny South Florida!
Posts: 2,019
Rewards Points: 1,946

Re: Need To Learn To Estimate Pool Jobs


Quote:
Originally Posted by Tiger View Post
Although profit is actually a divided decimal this will work for a start. Loaded labor includes overhead.

((materials + material markup) + loaded labor) + profit = job price
The parenthesis around materials and markup are unnecessary, since it doesn't matter what order you add and subtract.

It would matter if it were mixed multiplication and addition, but only if the addition had to be performed first.

Order of operations: PEMDAS Parenthesis, Exponents, Multiplication, Division, Addition, Subtraction.

A + B x C is the same as A + (B x C), but not the same as (A + B) x C.

__________________
"That somebitch looks like MANAGEMENT MATERIAL TO ME...I would have handed him another rod after he bent the first one." ~MAULEMALL
"I think he was grandmaster at a gay pride parade in san fran this week (not that there's anything wrong with that). " ~ J F
smalpierre is offline  
Old 04-03-2014, 11:43 AM   #8
I'm a Mac
 
Chris Johnson's Avatar
 
Trade: ICF Construction
Join Date: Apr 2007
Location: Hog Town
Posts: 5,487
Rewards Points: 4,254

Re: Need To Learn To Estimate Pool Jobs


Pools are a cash cow in my area, but also a limited cash cow, here you only have 4-5 months to utilize them, and not much more time to actually install them. And people pay a fortune for the landscaping that goes around them.

So not that my answer helps, but the perceived profit on a pool is huge, until you realize the short time frame to make it in, divided out by 12 months and it's not that special…so have something else to do in the off season
__________________
Chris
Chris Johnson is offline  
Old 04-03-2014, 11:48 AM   #9
Pro
 
Stoneyard's Avatar
 
Trade: Journeyman Carpenter
Join Date: Mar 2014
Location: Mn.
Posts: 106
Rewards Points: 249

Re: Need To Learn To Estimate Pool Jobs


Quote:
Originally Posted by RobertCDF View Post
I sniff you guys out in a heartbeat... not happening. Learn your own numbers.
Maybe, maybe not. But irrelevant. Nothing wrong with establishing an initial baseline then taking the lead from there.
Stoneyard is offline  
Old 04-03-2014, 11:49 AM   #10
Pro
 
Tiger's Avatar
 
Trade: Electrical Contractor
Join Date: Nov 2007
Location: Northern Illinois
Posts: 929
Rewards Points: 718

Re: Need To Learn To Estimate Pool Jobs


Quote:
Originally Posted by smalpierre View Post
The parenthesis around materials and markup are unnecessary, since it doesn't matter what order you add and subtract.

It would matter if it were mixed multiplication and addition, but only if the addition had to be performed first.

Order of operations: PEMDAS Parenthesis, Exponents, Multiplication, Division, Addition, Subtraction.

A + B x C is the same as A + (B x C), but not the same as (A + B) x C.

True. Although not written that way material markup is often often a multiplier.
__________________
www.TigerElectrical.com
Tiger is offline  
The Following User Says Thank You to Tiger For This Useful Post:
smalpierre (04-03-2014)
Old 04-03-2014, 07:42 PM   #11
The Dude
 
smalpierre's Avatar
 
Trade: home improvement
Join Date: Jan 2011
Location: Sunny South Florida!
Posts: 2,019
Rewards Points: 1,946

Re: Need To Learn To Estimate Pool Jobs


Quote:
Originally Posted by Tiger View Post
True. Although not written that way material markup is often often a multiplier.
Yes, but the way he did it was just adding the material with markup already applied - and you still wouldn't need parenthesis.
__________________
"That somebitch looks like MANAGEMENT MATERIAL TO ME...I would have handed him another rod after he bent the first one." ~MAULEMALL
"I think he was grandmaster at a gay pride parade in san fran this week (not that there's anything wrong with that). " ~ J F
smalpierre is offline  
Old 04-04-2014, 11:50 AM   #12
Pro
 
Tiger's Avatar
 
Trade: Electrical Contractor
Join Date: Nov 2007
Location: Northern Illinois
Posts: 929
Rewards Points: 718

Re: Need To Learn To Estimate Pool Jobs


(((hourly labor rate + hourly overhead rate)(hours)) + ((materials cost)(sales tax multiplier)(material markup multiplier))) / profit divisor = job price

Advertisement

__________________
www.TigerElectrical.com
Tiger is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Estimating with Excel for the Small Contractor YouTube cargin2 Business 123 01-13-2018 03:45 PM
need help on bidding for concrete jobs! Bconcretegirl Marketing & Sales 15 12-04-2013 12:25 PM
Looked at two Hurricane Sandy flood jobs... InterCounty Flooring 29 12-11-2012 04:02 PM
Pool Deck killerdecks Decks & Fencing 26 06-20-2012 08:30 AM
15 kw pool heater pat c Electrical 6 06-13-2012 07:38 PM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?