4" Concrete Over 2" Dirst Over 7/8 Sub Floor Wood Planking! - Flooring - Contractor Talk

4" Concrete Over 2" Dirst Over 7/8 Sub Floor Wood Planking!

 
Thread Tools Search this Thread Display Modes
Old 08-27-2008, 06:45 PM   #1
Registered User
 
agent99's Avatar
 
Trade: Remodeler/handyman
Join Date: Aug 2008
Posts: 3
Rewards Points: 10

4" Concrete Over 2" Dirst Over 7/8 Sub Floor Wood Planking!


I searched hard for something on this unusual situation, but no luck. I appreciate anyone's help or input:

We have a old storefront built around 1885 with a grand entrance that were common in commercial areas in Chicago back in the day. It had large 12 foot windows and a middle entrance with a ramp that goes up 6 inches in about 10 feet from the front (1:20). The entire entrance area about 35 feet into the space had roughly a 4" slap of concrete with old top embedded tile work. This slab was poured over about 2" of dirt with some gravel in it. It is 6 inches in total height. The joists were actually lowered 6 inches in this area to accept the concrete and meet the section beyond the 35 feet level which has no concrete and is just wood 6" higher. The joists are about 22 feet but they are split with a steel i-beam down the center, so each joist panel is about 11 feet on each side of that and they are 11 1/2" wide. This is for the front 35 feet because each 11 foot joist is notched and dropped into the i-beam. The joists past the 35 feet, are a solid long 22 feet laying completely over the i-beam and up that 6" higher.The old wood is solid with no cracks or significant dips and 1 3/4 thick. They are spaced about 14 inches on center. Much weight I know, but it has supported it for over 100 years! I guess they used the gravel dirt as a barrier and a cushion over the 7/8 sub floor planking. It's very solid.

When we ripped out the front storefront windows, we also ripped up the ramp and concrete flooring back about 12 feet. We are trying to move the door and ramp to meet ADA requirements off to the side next to the staircase. ADA does not enforce other code requirements on a ramp of a incline of 1:20 or less because it is actually not then classified as a ramp. We do not want to have to rip up the rest of the concrete ( a real pain in the a) and do not want to redo the whole ripped area in concrete. We plan to install new 3/4 plywood t&g over that 12 foot area on the joists. Then we plan to frame a box to the side of the ramp with 2 x 6's on 16" center, topped off with another t&g floor. The box side that meets the concrete down one joist line will be backed off about 10 inches. We will try to put 1/2" rebar every 2 feet epoxy anchored into the old slab and leading out towards the wood box frame. Also we will add concrete fortifier and bonding solutions. The wood box would have 3" Tapcons every foot W staggered towards the old slab to hold it steady. It would also have Simpson ties to the t&g (or should we go through to the joists?) We then would coat the wood water treatment solution over that 3/4 t&, a poly barrier, then 2" of the old dirt gravel and then pour 4" of a concrete slab to level off. We would have an expansion joint on the opposite side of the ramp and staircase where the concrete would meet a brick wall.There is a 1x6 trim against the staircase wall on the other side.We were thinking of cutting and replacing that with cement backer board and later coat with a cement paste to give it a cement wall look on that support side of the ramp. Later, we will add a 6" x 6" wall perpendicular across the joists and form a 4'6" wide ramp down to the door on the side away from the staircase. The ramp will be poured with 5000 psi crack resistant concrete and reinforced as well (or Rapid set 9000 psi?). To finish we will pour self level Edison coating 52 about 3/8" thick to level the whole area outside the ramp and over the entire 2800 sq ft floor. Are we crazy? What would you do? I'll try to get a couple of photos soon. I am just trying to give details of a difficult situation that is hard to explain, but you need photos to see what I mean.

Last edited by agent99; 08-27-2008 at 10:52 PM.
agent99 is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 08-27-2008, 07:28 PM   #2
Tile Contractor
 
Bud Cline's Avatar
 
Trade: Building Trades-Specializing in Ceramic Tile
Join Date: Feb 2006
Location: Hastings Nebraska
Posts: 1,249
Rewards Points: 518

Re: 4" Concrete Over 2" Dirst Over 7/8 Sub Floor Wood Planking!


Let me see if I understand this. You have two questions?

1.Are we crazy?
2.What would you do?

Is that correct? A short answer will suffice.

Advertisement

Bud Cline is offline  
Old 08-27-2008, 09:21 PM   #3
Pro
 
cleveman's Avatar
 
Trade: custom home building
Join Date: Dec 2007
Location: Central Iowa
Posts: 2,836
Rewards Points: 2,624

Re: 4" Concrete Over 2" Dirst Over 7/8 Sub Floor Wood Planking!


that is the longest post that i ever sawr
cleveman is offline  
Sponsored Links
Advertisement
 
Old 08-27-2008, 09:30 PM   #4
Pro
 
Mike Costello's Avatar
 
Trade: Flooring
Join Date: Aug 2004
Location: Portage County Ohio
Posts: 455
Rewards Points: 250

Re: 4" Concrete Over 2" Dirst Over 7/8 Sub Floor Wood Planking!


1 Yes

2 I would hire you to do it.
Mike Costello is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
taking a crack at my own concrete work J-Peffer Masonry 9 10-25-2010 05:16 PM
structural concrete... mdshunk Masonry 3 03-05-2009 03:42 PM
Advice - concrete Pool Deck coping ejleonard Masonry 4 06-17-2008 04:18 PM
Wood floor 2" or 4" drivewizard Flooring 23 12-24-2006 12:06 AM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?