This section of school hallway had VCT tile that was failing. We removed the tile, installed a moisture remediation system, and then installed a designer epoxy floor. We set the school logo in the floor in the middle of the hall and put a urethane top-coat over it all. About 750 sq. ft. completed over mid-winter break.