I got a licensed PE to design a solution for remedial measures. He opted for a minimum impact on work in place, saying that with only a 4 foot depth back fill leaking we can pr...
Replies 38My archi, did .... but the dear contractor did not build what was designed.... he wanted to save money by doing the small pour of fdn and slab all at once , you see, and did n...
Replies 38My archi, did .... but the dear contractor did not build what was designed.... he wanted to save money by doing the small pour of fdn and slab all at once , you see, and did n...