Rules Of Thumb For Demo Work??
What are some rules of thumb for demo work??
|
|
|
|
|
|
#2 |
|
Pro
Trade: General Contractor
Join Date: Mar 2006
Location: Hennessey, Oklahoma
Posts: 6,052
|
Re: Rules Of Thumb For Demo Work??
Make a profit?
So what are you asking exactly? I just went through a demo bid and have yet to see any 2 that are even close...the amount of material to remove, number of roll offs, construction of the building, concrete, depth of footings and foundations, utilities, returning site to grade.....on and on.
__________________
Ladwig Construction Hennessey, Oklahoma 405 853 1563 Ladwig Insulation & Construction Services Serving Oklahoma Statewide
|
|
|
|
|
|
#3 |
|
Registered User
Trade: Demo
Join Date: Jun 2008
Posts: 15
|
Re: Rules Of Thumb For Demo Work?? Im trying to bid a demo job, for the first time and Im running into, where do I start? Its about 3850 s.f. 1 story retail space. There's carpet, wallpaper, doors and (4) storefronts to be removed. I know your supposed to figure how many men, how many days, but cant figure it out...
|
|
|
|
|
|
#4 |
|
Pro
Trade: General Contractor
Join Date: Mar 2006
Location: Hennessey, Oklahoma
Posts: 6,052
|
Re: Rules Of Thumb For Demo Work??
You will catch some grief on this topic, but I will start off by pointing out that no one can accurately tell you how to estimate this....estimating is a difficult trade to just jump into, since most estimators have been in the field long before they jump into the numbers side.
I know a guy that used to clear retail properties, which is not as much demo as you would think...he basically gave a bid to empty the area, and salvaged the fixtures for his profit. You can try it on the "safe side" by seeing if your customer will agree to a cost plus basis......hire your labor from a temp agency so you are covered on WC and insurance, and then be on site to run the show. At the end, you add up the costs, add 10% (or whatever you agree to) and bill the customer. Take the percentage as being paid to see what it costs, and then next time, you will know how many man hours are involved in gutting a retail space. Good luck. BTW, in the contracting business, demolition generally refers to tearing down of existing structures, not what you are doing.
__________________
Ladwig Construction Hennessey, Oklahoma 405 853 1563 Ladwig Insulation & Construction Services Serving Oklahoma Statewide
|
|
|
|
|
|
#5 |
|
Pro
Trade: LI,NY designer, new homes, renovation work, concre
Join Date: Mar 2008
Location: Long Island, NY
Posts: 5,426
|
Re: Rules Of Thumb For Demo Work??
dont hit the gas main.
__________________
|
|
|
|
|
|
#6 |
|
Professional Instigator
Trade: Design Build Remodeling Contractor DC MD
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,872
|
Re: Rules Of Thumb For Demo Work??
always make sure the electrical breakers are off
|
|
|
|
|
|
#7 |
|
Pro
Trade: LI,NY designer, new homes, renovation work, concre
Join Date: Mar 2008
Location: Long Island, NY
Posts: 5,426
|
Re: Rules Of Thumb For Demo Work??
Locate The Water Main, Prior To Starting.
__________________
|
|
|
|
| The Following User Says Thank You to genecarp For This Useful Post: | Metro M & L (12-14-2009) |
|
|
#8 |
|
Professional Instigator
Trade: Design Build Remodeling Contractor DC MD
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,872
|
Re: Rules Of Thumb For Demo Work??
by the time someone says what's that noise?? its to late
|
|
|
|
| The Following 2 Users Say Thank You to rbsremodeling For This Useful Post: | LeeChimko (02-09-2010), Metro M & L (12-14-2009) |
|
|
#9 |
|
Registered User
Trade: General contractor fire and flood restoration especialist.
Join Date: May 2008
Location: chicago
Posts: 17
|
Re: Rules Of Thumb For Demo Work??
make sure you squechule the dumpsters on the right times of the day or your going to have to do double the work, early day, garbage every ware or the opposite a half full dumpster because he came to early and he as to go knowing how to pack is also a most if your paying flat fee for the dumpster dont just trow stuff in there. Insulation first then drywall to compress, any lumber make sure is aling or youll lose alot of space in the box, furniture brake. Dumpsters are a big part of demo and motivated guys, if your getting guys from an agency i ussually give them a task for the day and tell them if they finish early i give them full day pay that ussually makes them want to work harder. good luck hope every thing works out
Last edited by sapotech101; 06-02-2008 at 07:44 PM. Reason: bad grammar |
|
|
|
|
|
#10 | |
|
Professional Remodeler
Trade: Remodeling Contractor
Join Date: Dec 2005
Location: Southeast Michigan
Posts: 2,289
|
Re: Rules Of Thumb For Demo Work??Quote:
__________________
-Mike- Falcon Contracting Residential - Commercial
|
|
|
|
|
|
|
#11 |
|
Registered User
Trade: Demo
Join Date: Jun 2008
Posts: 15
|
Re: Rules Of Thumb For Demo Work??
Thanks!!
|
|
|
|
|
|
#12 |
|
Pro
Trade: Licensed Colorado electrician, licensed B-1 GC
Join Date: Jul 2005
Location: Colorado Front Range
Posts: 2,604
|
Re: Rules Of Thumb For Demo Work??
You should know a little about hazardous materials and what you might run into and what might be enforced. They are pretty easy around here but I would not count on it. I saw 7 state troopers unloading a truck at the dump years ago. Maybe looking for a body or maybe some illegal material... Bigger demo's might require a permit.
|
|
|
|
|
|
#13 |
|
Dmax Consulting
Trade: Paint Contractor
Join Date: Jul 2008
Posts: 84
|
Re: Rules Of Thumb For Demo Work??
Great post!
I am in a similar situation and am also looking for advice. |
|
|
|
|
|
#14 |
|
Pro
Trade: Remodeling - Carpentry
Join Date: Feb 2009
Location: Hollywood, FL
Posts: 150
|
Re: Rules Of Thumb For Demo Work??
Wear a mask, and gloves, watch out for nails and other sharp objects, be aware of things like bearing walls, plumbing and electrical, plan out what your going to do before you do it. Don't hurt your self.
Last edited by sk071077; 03-03-2009 at 06:24 PM. |
|
|
|
|
|
#15 |
|
Pro
Trade: Framing,Remodeling,General Contractor
Join Date: Mar 2009
Location: Kansas City
Posts: 1,922
|
Re: Rules Of Thumb For Demo Work??
Just guess. thats what bidding is,right?
|
|
|
|
|
|
#16 |
|
Pro
Trade: Remodeling 30+ yrs
Join Date: Jul 2008
Location: Connecticut
Posts: 1,639
|
Re: Rules Of Thumb For Demo Work?? |
|
|
|
|
|
#17 |
|
Pro
Trade: Excavation
Join Date: Feb 2009
Location: Saginaw Michigan
Posts: 272
|
Re: Rules Of Thumb For Demo Work??
I know its an old thread, but I wanted to cover a little something.
This may be a common sense approach, but there are ways you can start at the bottom and work your way up. Heres one I worked on in Oregon. The reactor dome was over 250ft tall when we started. Did it all from the bottom. |
|
|
|
|
|
#18 |
|
Professional Remodeler
Trade: Remodeling Contractor
Join Date: Dec 2005
Location: Southeast Michigan
Posts: 2,289
|
Re: Rules Of Thumb For Demo Work??
There is always an exception to every rule! :-) I am guessing the structure was strong enough to remain intact and self supporting as you "whittled" it down.
__________________
-Mike- Falcon Contracting Residential - Commercial
|
|
|
|
|
|
#19 | |
|
General Contractor
Trade: New Home Construction-Additions-Remodeling
Join Date: May 2007
Location: NJ
Posts: 2,788
|
Re: Rules Of Thumb For Demo Work??Quote:
to soften the whole thing up and make a nice pile which is easy to scoop... that would be best the solution a case like this, unless there is some sorts of restrictions.
__________________
I never lost a cent on the jobs I didn't get!
|
|
|
|
|
|
|
#20 |
|
Pro
Trade: Excavation
Join Date: Feb 2009
Location: Saginaw Michigan
Posts: 272
|
Re: Rules Of Thumb For Demo Work??
Well, the concrete was 3 feet thick. The interior of the building had 1/2-inch thick steel plate with 4in tall x 2in wide I beams welded to it. The beams were imbedded into the concrete wall. We would hammer out 10 feet tall sections at a time. Basically like we were making a giant core bit. We would hammer out three triangles, then at the point contacting the ground, we would hammer away at that section. With the weight of the structure above, it would slowly crumble, with help from the hammers of course. The steel inside also helped keeping the process slow and predictable.
As for dynamite. This plant had the first cooling tower to be imploded. It was up hill and far enough away to be done this way. The reactor building you see here was to close to the spent fuel casks to be imploded. They were afraid of a few issues. 1 The storage casks were literally in the shadow of the building. 2 They were afraid that the dust created would cause damage to the cooling system for those casks. 3 You see the bolt looks piece on the side of the structure. They are actually caps for a cable system. The thinking behind the cables were if for some reason there was a catastrophic failure of the reactor and an explosion happened, the cables would keep the structure mostly in tact. So those would be an issue for explosives. Top that off, the cables were coated in a grease that is supposedly a known carcinogen. We had to pull a pig behind the cable as we pulled it out of the structure. As much grease as possible had to be disposed off to a proper landfill. |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Side Work | specwood | Business | 81 | 05-12-2009 07:19 AM |
| Paving Machine Rules of Thumb | BlackGold | Concrete & Paving | 2 | 09-08-2007 04:33 PM |
| I Am Looking For Work As Labourer/contractor Helper In Toronto | Remmike | Help Wanted or Looking For Work | 0 | 02-22-2007 09:28 AM |
| On discouraging DIY electrical work... | mdshunk | Electrical | 52 | 02-18-2006 12:58 AM |
| Go to Page... |