Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Construction > Demolition

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 06-02-2008, 12:10 PM   #1
Registered User
Trade: Demo
 
Join Date: Jun 2008
Posts: 15
Rules of Thumb for Demo work??

What are some rules of thumb for demo work??

SiteGirl is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 06-02-2008, 12:17 PM   #2
Pro
 
joasis's Avatar
Trade: General Contractor
 
Join Date: Mar 2006
Location: Hennessey, Oklahoma
Posts: 4,570
Make a profit?

So what are you asking exactly?

I just went through a demo bid and have yet to see any 2 that are even close...the amount of material to remove, number of roll offs, construction of the building, concrete, depth of footings and foundations, utilities, returning site to grade.....on and on.
__________________
Ladwig Construction
Hennessey, Oklahoma
405 853 1563

Ladwig Insulation & Construction Services
Serving Oklahoma Statewide
405 314 5802
joasis is offline   Reply With Quote
Old 06-02-2008, 12:29 PM   #3
Registered User
Trade: Demo
 
Join Date: Jun 2008
Posts: 15
Demo work??

Im trying to bid a demo job, for the first time and Im running into, where do I start? Its about 3850 s.f. 1 story retail space. There's carpet, wallpaper, doors and (4) storefronts to be removed. I know your supposed to figure how many men, how many days, but cant figure it out...
SiteGirl is offline   Reply With Quote
Old 06-02-2008, 04:17 PM   #4
Pro
 
joasis's Avatar
Trade: General Contractor
 
Join Date: Mar 2006
Location: Hennessey, Oklahoma
Posts: 4,570
You will catch some grief on this topic, but I will start off by pointing out that no one can accurately tell you how to estimate this....estimating is a difficult trade to just jump into, since most estimators have been in the field long before they jump into the numbers side.

I know a guy that used to clear retail properties, which is not as much demo as you would think...he basically gave a bid to empty the area, and salvaged the fixtures for his profit.

You can try it on the "safe side" by seeing if your customer will agree to a cost plus basis......hire your labor from a temp agency so you are covered on WC and insurance, and then be on site to run the show. At the end, you add up the costs, add 10% (or whatever you agree to) and bill the customer. Take the percentage as being paid to see what it costs, and then next time, you will know how many man hours are involved in gutting a retail space. Good luck.

BTW, in the contracting business, demolition generally refers to tearing down of existing structures, not what you are doing.
__________________
Ladwig Construction
Hennessey, Oklahoma
405 853 1563

Ladwig Insulation & Construction Services
Serving Oklahoma Statewide
405 314 5802
joasis is offline   Reply With Quote
Old 06-02-2008, 06:02 PM   #5
Pro
 
genecarp's Avatar
Trade: LI,NY designer, new homes, renovation work, concre
 
Join Date: Mar 2008
Location: Long Island, NY
Posts: 4,153
dont hit the gas main.
__________________
genecarp is offline   Reply With Quote
Old 06-02-2008, 06:05 PM   #6
Professiona Instigator
 
rbsremodeling's Avatar
Trade: Design Build Remodeling Contractor Washington, DC
 
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,546
always make sure the electrical breakers are off
rbsremodeling is offline   Reply With Quote
Old 06-02-2008, 06:20 PM   #7
Pro
 
genecarp's Avatar
Trade: LI,NY designer, new homes, renovation work, concre
 
Join Date: Mar 2008
Location: Long Island, NY
Posts: 4,153
Locate The Water Main, Prior To Starting.
__________________
genecarp is offline   Reply With Quote
Old 06-02-2008, 06:26 PM   #8
Professiona Instigator
 
rbsremodeling's Avatar
Trade: Design Build Remodeling Contractor Washington, DC
 
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,546
by the time someone says what's that noise?? its to late
rbsremodeling is offline   Reply With Quote
Old 06-02-2008, 06:42 PM   #9
Registered User
Trade: General contractor fire and flood restoration especialist.
 
Join Date: May 2008
Location: chicago
Posts: 17
make sure you squechule the dumpsters on the right times of the day or your going to have to do double the work, early day, garbage every ware or the opposite a half full dumpster because he came to early and he as to go knowing how to pack is also a most if your paying flat fee for the dumpster dont just trow stuff in there. Insulation first then drywall to compress, any lumber make sure is aling or youll lose alot of space in the box, furniture brake. Dumpsters are a big part of demo and motivated guys, if your getting guys from an agency i ussually give them a task for the day and tell them if they finish early i give them full day pay that ussually makes them want to work harder. good luck hope every thing works out

Last edited by sapotech101; 06-02-2008 at 06:44 PM. Reason: bad grammar
sapotech101 is offline   Reply With Quote
Old 06-02-2008, 09:58 PM   #10
Professional Remodeler
 
firemike's Avatar
Trade: Remodeling Contractor
 
Join Date: Dec 2005
Location: Southeast Michigan
Posts: 2,290
Quote:
What are some rules of thumb for demo work??
Don't start at the bottom of a structure and try to work your way up....
__________________
-Mike-
Falcon Contracting
Residential - Commercial
firemike is offline   Reply With Quote
Old 06-03-2008, 10:42 AM   #11
Registered User
Trade: Demo
 
Join Date: Jun 2008
Posts: 15
Thanks!!
SiteGirl is offline   Reply With Quote
Old 06-03-2008, 11:04 AM   #12
K2
Pro
 
K2's Avatar
Trade: GC. Apprentice electrician
 
Join Date: Jul 2005
Location: Colorado Front Range
Posts: 2,529
You should know a little about hazardous materials and what you might run into and what might be enforced. They are pretty easy around here but I would not count on it. I saw 7 state troopers unloading a truck at the dump years ago. Maybe looking for a body or maybe some illegal material... Bigger demo's might require a permit.
K2 is offline   Reply With Quote
Old 09-11-2008, 07:39 PM   #13
Dmax Consulting
Trade: Paint Contractor
 
Join Date: Jul 2008
Posts: 76
Great post!

I am in a similar situation and am also looking for advice.
Dmax Consulting is offline   Reply With Quote
Old 03-03-2009, 06:22 PM   #14
Member
Trade: Carpentry & Remodeling
 
Join Date: Feb 2009
Location: Hollywood, FL
Posts: 53
Wear a mask, and gloves, watch out for nails and other sharp objects, be aware of things like bearing walls, plumbing and electrical, plan out what your going to do before you do it. Don't hurt your self.

Last edited by sk071077; 03-03-2009 at 06:24 PM.
sk071077 is offline   Reply With Quote
Old 03-03-2009, 06:45 PM   #15
Pro
 
knucklehead's Avatar
Trade: Framing,Remodeling,General Contractor
 
Join Date: Mar 2009
Location: Kansas City
Posts: 613
Just guess. thats what bidding is,right?
knucklehead is offline   Reply With Quote
Old 03-04-2009, 09:44 PM   #16
Snobnd
 
Snobnd's Avatar
Trade: Remodeling 30+ yrs
 
Join Date: Jul 2008
Location: Connecticut
Posts: 227
Quote:
Originally Posted by knucklehead View Post
Just guess. thats what bidding is,right?
Tools tools tools- and Lots of insurance! ....Oh ya and a box of band-aid
Snobnd is offline   Reply With Quote
Old 03-04-2009, 09:51 PM   #17
Pro
Trade: Excavation
 
Join Date: Feb 2009
Location: Saginaw Michigan
Posts: 125
I know its an old thread, but I wanted to cover a little something.

Quote:
Originally Posted by firemike View Post
Don't start at the bottom of a structure and try to work your way up....
This may be a common sense approach, but there are ways you can start at the bottom and work your way up. Heres one I worked on in Oregon. The reactor dome was over 250ft tall when we started. Did it all from the bottom.
Attached Images
  
JDavis21835 is offline   Reply With Quote
Old 03-05-2009, 03:25 PM   #18
Professional Remodeler
 
firemike's Avatar
Trade: Remodeling Contractor
 
Join Date: Dec 2005
Location: Southeast Michigan
Posts: 2,290
There is always an exception to every rule! :-) I am guessing the structure was strong enough to remain intact and self supporting as you "whittled" it down.
__________________
-Mike-
Falcon Contracting
Residential - Commercial
firemike is offline   Reply With Quote
Old 03-05-2009, 07:14 PM   #19
General Contractor
 
greg24k's Avatar
Trade: New Home Construction-Additions-Remodeling
 
Join Date: May 2007
Location: NJ
Posts: 900
Quote:
Originally Posted by JDavis21835 View Post
I know its an old thread, but I wanted to cover a little something.



This may be a common sense approach, but there are ways you can start at the bottom and work your way up. Heres one I worked on in Oregon. The reactor dome was over 250ft tall when we started. Did it all from the bottom.
What about a little dynamite to soften the whole thing up and make a nice pile which is easy to scoop... that would be best the solution a case like this, unless there is some sorts of restrictions.
__________________
I never lost a cent on the jobs I didn't get!
greg24k is offline   Reply With Quote
Old 03-05-2009, 07:43 PM   #20
Pro
Trade: Excavation
 
Join Date: Feb 2009
Location: Saginaw Michigan
Posts: 125
Well, the concrete was 3 feet thick. The interior of the building had 1/2-inch thick steel plate with 4in tall x 2in wide I beams welded to it. The beams were imbedded into the concrete wall. We would hammer out 10 feet tall sections at a time. Basically like we were making a giant core bit. We would hammer out three triangles, then at the point contacting the ground, we would hammer away at that section. With the weight of the structure above, it would slowly crumble, with help from the hammers of course. The steel inside also helped keeping the process slow and predictable.

As for dynamite. This plant had the first cooling tower to be imploded. It was up hill and far enough away to be done this way. The reactor building you see here was to close to the spent fuel casks to be imploded. They were afraid of a few issues. 1 The storage casks were literally in the shadow of the building. 2 They were afraid that the dust created would cause damage to the cooling system for those casks. 3 You see the bolt looks piece on the side of the structure. They are actually caps for a cable system. The thinking behind the cables were if for some reason there was a catastrophic failure of the reactor and an explosion happened, the cables would keep the structure mostly in tact. So those would be an issue for explosives. Top that off, the cables were coated in a grease that is supposedly a known carcinogen. We had to pull a pig behind the cable as we pulled it out of the structure. As much grease as possible had to be disposed off to a proper landfill.
JDavis21835 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Side Work specwood Business 81 05-12-2009 06:19 AM
Paving Machine Rules of Thumb BlackGold Concrete & Paving 2 09-08-2007 03:33 PM
I Am Looking For Work As Labourer/contractor Helper In Toronto Remmike Help Wanted or Looking For Work 0 02-22-2007 09:28 AM
On discouraging DIY electrical work... mdshunk Electrical 52 02-18-2006 12:58 AM




Top of Page | View New Posts


All times are GMT -5. The time now is 04:19 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC