Sewer stub

Deq has just came up with a new rule that all sewer stubs from the main will have to have the 10 foot seperation from the water pipe. This means that if your sewer stub to the house is with in the 10 feet then you will have to go with the pressure pipe. To me this is so stupid because at the property line you can take the sewer pipe and the water line can go back in the same ditch as long as they're of approved metiaral for a building. I am wondering if this is the same rule in your area or is Idaho DEQ just pulling somthing out their , and if you are doing it this way how do you go from the pressure pipe to ABS?

Thanks
Justin

Moscow is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 02-27-2007, 03:29 PM   #2
Pro
 
dayexco's Avatar
Trade: entrepreneur of excavating expertise
 
Join Date: Mar 2006
Posts: 1,645
why in the world are you running ABS? ever leave that stuff out on top of the ground in the summer time? after an hour, you could run a string from end to end, and use it for a bow. you know that ABS stands for absolutely bull shirt, don't you? anyway, class 160, 200 IPS PVC water main has the same OD as schedule 40 pvc, you can no hub, fernco, or use a sched 40 SW coupling.
__________________
When the student is ready, the teacher will appear
[b]Do you teach the best what you need to learn the most?[b]
a few pics of our operation and equipment at http://s72.photobucket.com/albums/i182/dayexco/
dayexco is offline   Reply With Quote
Old 02-27-2007, 05:18 PM   #3
Plumbing/Mechanical Insp.
Trade: plumbing/mechanical/building inspector
 
Join Date: May 2005
Location: Moscow Idaho
Posts: 124
Quote:
Originally Posted by dayexco View Post
why in the world are you running ABS? ever leave that stuff out on top of the ground in the summer time? after an hour, you could run a string from end to end, and use it for a bow. you know that ABS stands for absolutely bull shirt, don't you? anyway, class 160, 200 IPS PVC water main has the same OD as schedule 40 pvc, you can no hub, fernco, or use a sched 40 SW coupling.
I agree with you however PVC is not used and the supply houses only stock ABS there for all you will see is ABS.
Moscow is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Sewer tie violation mdshunk Plumbing 10 07-04-2007 10:36 AM
sewer line cost kenvest Excavation & Site Work 10 03-09-2007 09:20 AM
Plugging sewer pipe that is to be retired personalt Plumbing 3 07-06-2006 11:16 PM
storm sewer drop inlets dayexco Excavation & Site Work 7 06-04-2006 07:29 PM
Sewer gas Texstar Plumbing 1 05-14-2006 09:30 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 03:21 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC