|
|
Thread Tools | Search this Thread | Display Modes |
|
|
#1 |
|
Sunny Southern California
Join Date: May 2004
Location: Los Angeles County
Posts: 50
|
New Plumbing Inspection Phases
I've already gone through the initial subfloor rough plumbing inspection for my new bathroom.
I've also had the inspector look at the vents going through the new framed walls and through the ceiling. Before I proceed, does he need to see a frame for the whirlpool tub I will be installing? As well as a shower floor? |
|
|
|
|
|
#2 |
|
Chief Toilet Mover
Trade: Bathroom Remodeling
Join Date: Apr 2004
Location: Littleton, Colorado
Posts: 14,078
|
Re: New Plumbing Inspection Phases
Where I'm from you would need a framing inspection for the framing of the whirlpool and shower. A rough plumbing for the drains and water pipes, a rough electrical for the GFCI circuits for the tub. Then a final plumbing, electrical and final inspection to close the permit.
|
|
|
|
|
|
#3 | |
|
Pro
Join Date: Dec 2003
Location: +up-state N.Y.
Posts: 118
|
Re: New Plumbing Inspection PhasesQuote:
Don't forget the motor access door |
|
|
|
|
|
|
#4 |
|
Sunny Southern California
Join Date: May 2004
Location: Los Angeles County
Posts: 50
|
Re: New Plumbing Inspection Phases
Thanks guys, seems like the same happens here in So Cal.
I will be accessing the motor and "in-line" heater through an adjacent closet. But I am also leaning towards a "removable" skirt. Maybe make it look like the vanity so that I can access the motor from the from through one of the panels. |
|
|
|
|
|
#5 |
|
Chief Toilet Mover
Trade: Bathroom Remodeling
Join Date: Apr 2004
Location: Littleton, Colorado
Posts: 14,078
|
Re: New Plumbing Inspection Phases
The last one I did was really nice and I ordered matching cabinet doors from the vanity manufacturer, turned them sideways and attached them with whole earth magnets. Looks really nice and works really nice.
|
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| under-slab plumbing / DIY | ruger9 | Plumbing | 28 | 03-09-2009 01:31 PM |
| boiler plumbing question | 72chevy4x4 | HVAC | 2 | 05-06-2007 08:26 PM |
| Home inspection | brentsid | Inspections | 13 | 03-26-2007 11:27 AM |
| Difference in Plumbing up north Vs. south | jdrew6788 | Plumbing | 3 | 10-02-2006 04:59 AM |
| Locating plumbing in an outside wall | Mike Finley | Plumbing | 15 | 09-09-2006 07:49 AM |
| Go to Page... |
