Question: I have an addition being put on to my house with a full bsmt under it. They will pour footings, pour the walls, cut a doorway to the the current bsmt then pour a floor on the addition piece. I want to put in the plumbing neccasary to put in a bathroom in the bsmt. I have public sewer but the feed is 4' high so i will need to put in a pump. What do I need to do before they pour the new floor? should I have them not pour a piece or should I put in a tub and rough in the pipes? any ideas. Thanks
|
|
|
|
#2 | |
|
New Guy
Trade: plumbing heating gas fitting
Join Date: Jan 2007
Posts: 17
|
Re: Basement Bathroom
you have to rough in the underground plumbing right into the ejector pump which also has to be in the floor, If you didnt know that you probably shouldnt be doing this..
thats all done before you pour the floor over youre rough underground plumbing..Quote:
|
|
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Help Water in Basement | LG2720 | Construction | 12 | 01-17-2007 02:40 AM |
| Bathroom Plumbing on an exterior basement wall | mcamp60 | Plumbing | 12 | 01-08-2007 09:12 PM |
| HELP! Basement floor disaster | Profiter | Construction | 5 | 07-11-2006 09:01 PM |
| basement bathroom lavatory | HandyAl | Plumbing | 1 | 12-31-2005 09:42 PM |
| Landscape solution to basement moisture problem | RJC | Construction | 3 | 11-21-2005 01:34 AM |
| Go to Page... |