grout underpinning and deep excavation

heres some pics of a job I've been working on. 30'+ excavation right next to an adjacent building. 1st pic you can see the street side soe. sheet piles with 2 levels of 4 and 5 strand tiebacks. Check out the dewatering as well. Water table is about 10' bgs. 2nd pic you can see the grout underpinning. The building is pretty long so traditional underpinning would have taken way too long to excavate 4' pits, by hand, that deep. To install the grouting, they drill down (from street level before excavation) a regular 5"-6" hole then while withdrawing the drill string, grout and high pressured water and air are pumped into the hole to make a 4 to 5 ft diameter column of cemented soil under the building. The columns are staged as not to undermine a portion of the building and to eventually create a continuous grout wall. All the grout is mixed on site. In the 1st pic, at the top you can see a yellow silo. That is for storage of the dry portland. From there it goes into a hopper where it is measured and mixed with water, then to the mixer and pump house shown in the 3rd pic.
Attached Images
  

ch0mpie is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 09-25-2009, 03:20 PM   #2
Pro
 
ch0mpie's Avatar
Trade: Geotechnical/Civil/Construction Engineer
 
Join Date: Nov 2005
Location: North NJ
Posts: 296
pic3
Attached Images
 
ch0mpie is offline   Reply With Quote
Old 09-25-2009, 04:16 PM   #3
Vagitarian
 
rino1494's Avatar
Trade: site and utility contractor
 
Join Date: Jan 2006
Location: Dallas, PA
Posts: 2,446
Send a message via AIM to rino1494
Great pics, do you have any more ?
__________________
Life is hard. It is harder when you are stupid

Uncle Sam wants YOU....to speak ENGLISH
rino1494 is online now   Reply With Quote
Old 09-29-2009, 09:04 AM   #4
Pro
Trade: excavating
 
Join Date: Jul 2009
Location: upstate ny
Posts: 132
Thats little more involved than the one I just did. Amazing the scope and scale of that work, bet that had a pretty big price tag.
__________________
www.macdonoughexcavating.com
jmacd is offline   Reply With Quote
Old 10-02-2009, 01:59 PM   #5
Pro
 
ch0mpie's Avatar
Trade: Geotechnical/Civil/Construction Engineer
 
Join Date: Nov 2005
Location: North NJ
Posts: 296
Here's a few more for those who are interested. First pic is of the staging area silo, pump house ect. Second is of the powerpac and rig. Had a little problem at this location. The bit must have gotten blocked up or they were chasing a piece of rock down the hole, because once we started digging we found a hole in the grout wall. In this photo the guys are drilling a patch for the hole. Also the wall shown in this pic is a permeant retaining wall. Meaning it's getting finished with something (not sure what) and thats it. No block or concrete is going in front of it. In the photo excavation is at about 2/3 to the bottom.
Attached Images
  
ch0mpie is offline   Reply With Quote
Old 10-02-2009, 02:03 PM   #6
Pro
 
ch0mpie's Avatar
Trade: Geotechnical/Civil/Construction Engineer
 
Join Date: Nov 2005
Location: North NJ
Posts: 296
testing program

Before starting production grouting the contractor has to prove they can do the job. First pic show drilling for a test column. The column is at a radomn spot near the building to recieve production underpinning. Next we core the test column. The core is shown in the 2nd pic. Excellent recovey and quality for this type of work. We also do compression testing. Requirement for this job is 500psi.
Attached Images
  
ch0mpie is offline   Reply With Quote
Old 10-02-2009, 02:07 PM   #7
Pro
 
ch0mpie's Avatar
Trade: Geotechnical/Civil/Construction Engineer
 
Join Date: Nov 2005
Location: North NJ
Posts: 296
Last thing for the test program is to dig up the test columns to check the diameter. One was too small so they had to use the same installation parameters they used for the larger column for the underpinning. You can see that everthing in the ground gets encapulated in the grout.
Attached Images
 
ch0mpie is offline   Reply With Quote
Old 10-02-2009, 02:12 PM   #8
Pro
 
ch0mpie's Avatar
Trade: Geotechnical/Civil/Construction Engineer
 
Join Date: Nov 2005
Location: North NJ
Posts: 296
Quote:
Originally Posted by jmacd View Post
Thats little more involved than the one I just did. Amazing the scope and scale of that work, bet that had a pretty big price tag.
Not sure of the price tag for this job but if I had to guess its in the 7 to 8 figure range
ch0mpie is offline   Reply With Quote
Old 12-18-2009, 05:27 PM   #9
Nac
Pro
 
Nac's Avatar
Trade: Concrete, masonry & excavation
 
Join Date: Apr 2006
Location: New Jersey
Posts: 252
Why not just use sheet piles and tiebacks under building? or drive H piles along the building with timber lagging and tiebacks? was it a siesmeic issue? Basicly it is a secant pile.
Nac is offline   Reply With Quote
Old 12-18-2009, 10:34 PM   #10
Pro
 
ch0mpie's Avatar
Trade: Geotechnical/Civil/Construction Engineer
 
Join Date: Nov 2005
Location: North NJ
Posts: 296
Sheet piles or soldier piles and lagging are not acceptable as underpinning in most cases because they will deflect too much with that much load behind them, causing unacceptable settlement. Plus just the vibrations from installing the piles so close to the foundations could cause damage to the building or settlement.

Basicly it is the same a secant pile just mixing the soil/cement inplace instead of pouring concrete, and no steal.
ch0mpie is offline   Reply With Quote
Old 01-06-2010, 04:49 PM   #11
pce
New Guy
Trade: the tough jobs
 
Join Date: Apr 2009
Location: Michigan
Posts: 20
helical piers ?
pce is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Underpinning Job Nac Excavation & Site Work Picture Post 7 07-14-2008 08:41 AM


Top of Page | View New Posts


All times are GMT -5. The time now is 08:25 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC