Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Construction > Commercial Construction

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 10-17-2009, 10:25 AM   #1
Registered User
Trade: Plumbing, Irrigation, Solar Solutions
 
Join Date: Oct 2009
Posts: 8
Ground work layout

Hi all, I currently work for a plumbing contractor, in which the boss insist that only he does all the groudworks. Hides the blueprints in the backhoe while he digs and shouts measurements. Ask questions about whats going on and he just rolls up the prints and back to the hoe.
Assuming that all the walls are 2x4's, wood or metal, each wall is 3 5/8" is that correct. The surveyer takes denoted the exterior stud wall, not the actually finish, IE 5/8 plywood, expansion space then brick finish. If the first deminsion of a room 10' wide stud to stud, it would simply be 10' 3 5/8" to front of the second wall? | | ------- 10' ------| |
^ 10' 3 /58 ^
If times weren't tight, I would be working for another company. So for now Im stuck trying to learn as much as possible on my own. Any replies would be greatly appreciated. Thank You

Pipe Wrench is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 10-17-2009, 10:36 AM   #2
General Contractor
 
Willie T's Avatar
Trade: General Contractor
 
Join Date: Jan 2009
Location: St. Petersburg, FL
Posts: 474
3-5/8" is a little dated. It's 3-1/2" now days. (For wood, as stated below)
__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Bill Everett - St. Petersburg, FL

Last edited by Willie T; 10-17-2009 at 11:43 AM.
Willie T is offline   Reply With Quote
Old 10-17-2009, 11:24 AM   #3
Pro
Trade: Commercial Superintendent
 
Join Date: Mar 2009
Posts: 253
Quote:
Originally Posted by Willie T View Post
3-5/8" is a little dated. It's 3-1/2" now days.
Metal studs are 3 5/8", wood studs even in the great Pacific Northwest are about 3 31/32" or less.

Reading the plans and interpreting the plans is where the money is. I've even had to use a magnifying glass to figure out if dimension ended at framing or finish. If I understand your question correctly, your answer is 10' 3 1/2". But until I looked at the plans, I am only guessing.

Last edited by Anti-wingnut; 10-17-2009 at 11:26 AM.
Anti-wingnut is offline   Reply With Quote
Old 10-17-2009, 11:41 AM   #4
General Contractor
 
Willie T's Avatar
Trade: General Contractor
 
Join Date: Jan 2009
Location: St. Petersburg, FL
Posts: 474
True. I stand corrected. I wasn't specific enough. Sorry. Haven't worked with metal studs in so many years, they are kind of lost in my memory.
__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Bill Everett - St. Petersburg, FL
Willie T is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Florida Contractor Does work and doesn't get paid!!!!! localtradesman Business 40 10-13-2009 11:48 AM
Any Plumbers looking for work in Boston, MA area? sadegs Help Wanted or Looking For Work 2 02-20-2009 07:45 PM
Looking for work southern dutchess county NY "JJ" Help Wanted or Looking For Work 0 02-11-2009 04:41 PM
lack of work in the u.k! mull bull Drywall 1 08-30-2008 05:30 PM
In answer to a closed thread. AAPaint donb1959 Painting & Finish Work 42 08-27-2006 12:36 AM




Top of Page | View New Posts


All times are GMT -5. The time now is 05:05 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC