|
|
Thread Tools | Search this Thread | Display Modes |
|
|
#1 |
|
Registered User
Trade: Plumbing, Irrigation, Solar Solutions
Join Date: Oct 2009
Posts: 8
|
Ground Work Layout
Hi all, I currently work for a plumbing contractor, in which the boss insist that only he does all the groudworks. Hides the blueprints in the backhoe while he digs and shouts measurements. Ask questions about whats going on and he just rolls up the prints and back to the hoe.
Assuming that all the walls are 2x4's, wood or metal, each wall is 3 5/8" is that correct. The surveyer takes denoted the exterior stud wall, not the actually finish, IE 5/8 plywood, expansion space then brick finish. If the first deminsion of a room 10' wide stud to stud, it would simply be 10' 3 5/8" to front of the second wall? | | ------- 10' ------| | ^ 10' 3 /58 ^ If times weren't tight, I would be working for another company. So for now Im stuck trying to learn as much as possible on my own. Any replies would be greatly appreciated. Thank You |
|
|
|
|
|
#2 |
|
General Contractor
Trade: General Contractor
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond their range.
Posts: 2,652
|
Re: Ground Work Layout
3-5/8" is a little dated. It's 3-1/2" now days. (For wood, as stated below)
__________________
"True eloquence consists in saying all that is necessary, and only that which is." François Duc de La Rochefoucauld Bill Everett - St. Petersburg, FL Last edited by Willie T; 10-17-2009 at 12:43 PM. |
|
|
|
|
|
#3 |
|
Pro
Trade: Commercial Superintendent
Join Date: Mar 2009
Posts: 1,511
|
Re: Ground Work Layout
Metal studs are 3 5/8", wood studs even in the great Pacific Northwest are about 3 31/32" or less.
Reading the plans and interpreting the plans is where the money is. I've even had to use a magnifying glass to figure out if dimension ended at framing or finish. If I understand your question correctly, your answer is 10' 3 1/2". But until I looked at the plans, I am only guessing. Last edited by Anti-wingnut; 10-17-2009 at 12:26 PM. |
|
|
|
|
|
#4 |
|
General Contractor
Trade: General Contractor
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond their range.
Posts: 2,652
|
Re: Ground Work Layout
True. I stand corrected. I wasn't specific enough. Sorry. Haven't worked with metal studs in so many years, they are kind of lost in my memory.
__________________
"True eloquence consists in saying all that is necessary, and only that which is." François Duc de La Rochefoucauld Bill Everett - St. Petersburg, FL |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Looking for work southern dutchess county NY | "JJ" | Help Wanted or Looking For Work | 1 | 05-25-2010 02:03 PM |
| Florida Contractor Does work and doesn't get paid!!!!! | localtradesman | Business | 40 | 10-13-2009 12:48 PM |
| Any Plumbers looking for work in Boston, MA area? | sadegs | Help Wanted or Looking For Work | 2 | 02-20-2009 07:45 PM |
| lack of work in the u.k! | mull bull | Drywall | 1 | 08-30-2008 06:30 PM |
| In answer to a closed thread. AAPaint | donb1959 | Painting & Finish Work | 42 | 08-27-2006 01:36 AM |
| Go to Page... |
