Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Specialty Trades > Concrete & Paving

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 10-06-2009, 08:10 PM   #1
Registered User
Trade: Remodeler
 
Join Date: Nov 2006
Location: CA, Los Angeles
Posts: 9
Reconnecting cut concrete slap

Hi,

I am working on a commercial construction project in Los Angeles CA.
We have to cut a trench into the existing concrete slap for plumbing.
After the plumber is done we have to refill the trench and reinstate the concrete slap.
My question is how does the rebars need to be spaced and more important which building code is applied?

Thank you

acer66 is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 10-09-2009, 12:43 PM   #2
Twisted Cameron
Trade: Concrete, Metal buildings
 
Join Date: May 2009
Location: Yorkville Il
Posts: 89
Take a look at the cut concrete does it even have rebar in it? I am not sure if Ca has some sort of code on that, but I usually put my dowels 24 inches on center.
scrapecc is offline   Reply With Quote
Old 10-27-2009, 09:59 PM   #3
Registered User
Trade: Remodeler
 
Join Date: Nov 2006
Location: CA, Los Angeles
Posts: 9
That`s something like I had in mind, I just have a hard time to find any codes about concrete slap repair.

Asking the inspector is going to be my last resort since the local building department is not very helpful so far.

We just cut it and the slab has wire mash in it or more they laid the mash onto the moist barrier and poured the concrete on top of it with the result that the concrete sits more or less on top of the concrete.

Thank you
acer66 is offline   Reply With Quote
Old 11-05-2009, 10:17 AM   #4
Registered User
Trade: Remodeler
 
Join Date: Nov 2006
Location: CA, Los Angeles
Posts: 9
We just got signed off by the inspector. No wire mesh anymore, what they wanted to have done is.

6mil plastic on the ground.
1/2 rebar staggered so there is no greater distance than 16" oc to the next rebar.
Rebar needs to go at least 6" into the concrete.
Rebar is only anchored in the concrete on one side and ends 2 to 3" short on the other side.
We epoxied the rebars but the Inspector said we could have just hammered the rebar into a 1/2" hole which would have saved some money.
Also the epoxying process is required to be done while a Inspector is present which we did`t know for this kind of application.

What came out was that there is no real code, at least here in CA, which addresses this issue so it`s more or less up to the Inspector.

Thank you
acer66 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Concrete Company delivered junk concrete. How best to pursue? marcomjl Concrete & Paving 39 09-19-2009 09:08 AM
4x4 posts in concrete vs. saddles Strongarm Decks & Fencing 20 08-31-2009 09:41 PM
Spalling concrete stabilization tsunamicontract Concrete & Paving 4 06-07-2009 07:51 PM
Advice - concrete Pool Deck coping ejleonard Masonry 4 06-17-2008 04:18 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 06:03 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC