Help With Concrete Bid
Here is a crawl space, the homeowner basically wants a concrete floor covering all the dirt with concrete steps going up to that footing. A line pump will be required to get it in there, as the street is quite a bit lower than the house and kind of far away.
![]() So I worked out a bid and came up with $1086.00 for concrete and line pump. Labor I figured three to five days of man hours for the set up; that includes some digging, form up the slabs, form up the stairs, add steel, lay visqueen, and some other minor stuff. And then a crew of guys on the day of the pour, So I estimated $1,200 for labor. For the material I figured steel, epoxy, form work for stairs and slabs, plastic, etc. = about $300.00 (which can vary). Then to rent some tools = $82.00. So I came up with: Concrete & Pump = $1,086 Labor = $1,200 Material for prep = $300 Tool Rental = $82 Total w/tax = $2,800 Now previously he had another guy give him a bid and then leave and never contact him again. Homeowner would call him, he wouldn't return his phone calls, which is the reason he's hiring me to do this in the first place. Homeowner says that other contractor gave him a bid for $1,800. I looked it through, and I can't figure out any way to charge that little, unless he showed up, dumped in the concrete and left, without doing any preparation work. But now I am beginning to think that's the reason the other guy left. He realized he made a mistake in his bid and doesn't even want to talk to the homeowner now? I'm not sure, but do you think I went about this bid the right way? |
|
|
|
|
|
#2 |
|
Workin' Hard & Havin' Fun
Trade: Deck Designer/Builder
Join Date: May 2006
Location: Reading, PA
Posts: 1,739
|
Re: Help With Concrete Bid
At $1800 it's a mistake, and you walk away. At my price sir, I'll not only finish the job, but I'll answer my phone when you call.
At $2800 I'm not convinced you really make any money... but... congrats on running the numbers so well! ~Matt |
|
|
|
|
|
#3 |
|
Pro
Trade: General Contractor
Join Date: Mar 2006
Location: Hennessey, Oklahoma
Posts: 6,051
|
Re: Help With Concrete Bid
Without knowing the volume of concrete, or sq/ft, I can't second guess, but it seems cheap. I just bought a line pump, and in my area, the minimum pump charge is $100 an hour, 3 hour minimum. Pump mix mud runs a little over $100 a yard, and if you have steps to form, you will have issues with the slump of the mix from the pump.
__________________
Ladwig Construction Hennessey, Oklahoma 405 853 1563 Ladwig Insulation & Construction Services Serving Oklahoma Statewide
|
|
|
|
|
|
#4 | ||
|
Pro
|
Re: Help With Concrete BidQuote:
Quote:
As for the slump, if you're talking about losing slump through the hose, I don't think that will be much of a problem because the hose doesn't need to be very long. I was going to use a 4000 psi, 6 sac mix at a 6 inch slump, then vibrate the stairs really good. |
||
|
|
|
|
|
#5 |
|
Member
Trade: Commercial Construction
Join Date: May 2008
Location: Portland, OR
Posts: 61
|
Re: Help With Concrete Bid
never been so wrong in my life when I looked at something and estimated the volume....., 6" slump? seems kinda wet to me, I wouldn't be able to get away with it.
|
|
|
|
|
|
#6 |
|
Pro
|
Re: Help With Concrete Bid
You may not on a commercial site with special inspectors on your back, but that depends on the mix. I think for what I'm doing it will be plenty strong.
|
|
|
|
|
|
#7 |
|
Pro
Trade: General Contractor
Join Date: Mar 2006
Location: Hennessey, Oklahoma
Posts: 6,051
|
Re: Help With Concrete Bid
How do you arrive at 6 yards without measuring? I usually measure before calculating the amount.
__________________
Ladwig Construction Hennessey, Oklahoma 405 853 1563 Ladwig Insulation & Construction Services Serving Oklahoma Statewide
|
|
|
|
|
|
#8 |
|
Pro
Trade: General, Electrical, and Plumbing Contractor
Join Date: Feb 2007
Location: Portland, OR & Eatonville, WA
Posts: 1,264
|
Re: Help With Concrete Bid
If you get the job, measure it and then add a little more.
Nothing sucks as bad as coming up 1/2 a yard short when pouring concrete, and then having to call in another truck for 1/2 a yard. I would rather have a yard to much and waste it than have to do that. |
|
|
|
|
|
#9 | |
|
Pro
|
Re: Help With Concrete BidQuote:
I know I need to add a little extra when it comes time to order it. A trick that works well for me is I measure out the cubic footage and divide by 25, then add 1/2 yard for what's stuck in the pump. If you were figuring exact then it would be 27, so dividing by 25 accounts for waste. |
|
|
|
|
|
|
#10 |
|
Twisted Cameron
Trade: Concrete, Metal buildings
Join Date: May 2009
Location: Yorkville Il
Posts: 312
|
Re: Help With Concrete Bid
Let me get this straight, you may be stuck there for 5 days, are you putting in half time? Plus a crew of guys the day of? FORGET THAT!!!! tell him you would rather go to McDonalds than go any lower. you pay a crew of guys even just 200.00 the day of and get stuck here for 5 days at 8 hours a day, 40 hours my man. thats a measly 25 an hour, after taxes and overhead. Even if its only insurance. Your giving the guy a hell of a deal man.
|
|
|
|
|
|
#11 |
|
Pro
Trade: Construction
Join Date: Jun 2009
Location: VA
Posts: 4,704
|
Re: Help With Concrete Bid
Yeah your price sounds to low to me. I would add another $600-1000 on your price.
|
|
|
|
|
|
#12 |
|
Pro
|
Re: Help With Concrete Bid
He said he's not going to do it now because of his budget, and that maybe now isn't a good time. He says the other contractor was confident he could set it up in a day, then pour the next day. I was thinking three to five days labor on the set up. But I was figuring on doing some digging for a haunch where he wants a wall to go later, put in visqueen, add steel epoxied into the existing perimeter, and get the stairs done nice. I suppose if I just went in, put in some boards for the slab, built the stairs kind of sloppy, I could get it all done in six hours and call it a day, I just don't think that's a good idea.
I know my rates seem low, but lately I have been getting calls stacked up, so I may be raising my rates. |
|
|
|
|
|
#13 |
|
Twisted Cameron
Trade: Concrete, Metal buildings
Join Date: May 2009
Location: Yorkville Il
Posts: 312
|
Re: Help With Concrete Bid
Well that sounds like that may be better for you. I have been in the situation where I bid something low, and then the customer tried to beat me down. Its nice when that happens cause it makes it so much easier to just walk away.
|
|
|
|
|
|
#14 |
|
Registered User
Trade: concrete,landscaping
Join Date: Aug 2009
Location: Aurora,Colorado
Posts: 11
|
Re: Help With Concrete Bid
mmmm
It takes that much for me to get out of bed in the mourning,much less work.For me the $2800 number may not be right,maybe more.I will say using a 3/8 mix and 2" line will help cut placement costs (labor).I never figure a pump at less than $500,did I say never?There are some jobs I will bid including pump,others home owner pays for it. It was mentioned a good point,some you need to walk away from.From my stranger than fiction files.When I run across jobs that look like it will eat me alive or don't want I double the bid.That way if it comes to me I probably will make money.Looks like you covered the basics,now adjust the real costs.Good luck and learn from this,your into making money,not heart attacks. |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Concrete Company delivered junk concrete. How best to pursue? | marcomjl | Concrete & Paving | 46 | 08-07-2011 02:55 PM |
| I need a to pour 1/4 yard of black concrete... | ruskent | Masonry | 9 | 05-25-2009 12:50 PM |
| Concrete stain problem | Forry | Concrete & Paving | 6 | 09-02-2008 09:10 PM |
| Advice - concrete Pool Deck coping | ejleonard | Masonry | 4 | 06-17-2008 05:18 PM |
| Go to Page... |