Flat work temps, when to call er quits

I have a job coming up this week. Building garage, pouring garage floor, but the temps are going to be low 40's day and high 20's at night. We form up and then hire a finish guy. I'm nervous about this as it's my dime if there's going to be problems down the line. Looking for other input on what to expect and how to proceed.

AJAX is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 10-11-2009, 09:28 AM   #2
Dream Builder
Trade: GC/Remodeling
 
Join Date: Sep 2007
Location: Central America (Kansas)
Posts: 688
Blanket it for a couple of days...
__________________
Quote:
Originally Posted by neolitic View Post
Now, now, next thing we know
you'll be having a press conference
and apologizing to the whole world...
TimelessQuality is offline   Reply With Quote
Old 10-11-2009, 09:29 AM   #3
Trailer park boy
 
shanekw1's Avatar
Trade: Remodeling
 
Join Date: Mar 2008
Location: Castlegar, BC, Canada
Posts: 1,777
Hot water, high early, and insulated tarps.
__________________
shanekw1 is online now   Reply With Quote
Old 10-11-2009, 09:49 AM   #4
concrete designer
Trade:
 
Join Date: Jul 2009
Posts: 39
AJAX,
It's that cold already by you? I'm basically straight east of you. Yesterday was a bit chilly but looking better this next week. I'm sure being this early, your redi-mix plant isn't heating water or materials yet. As other posts had said, cover that with insulated blankets before those temps get down. I generally don't seal with topical sealers when temps start getting that low. Pour that thing + get that garage built on that before the snow + ice get to it.
user50444 is offline   Reply With Quote
Old 10-11-2009, 12:01 PM   #5
Member
Trade: GC, Remodeling
 
Join Date: Sep 2009
Location: Central, MN
Posts: 80
Thanks, I asked my guy but I know he needs the work so that's why I'm lookin for an unbiased opinion.

I'm going to call the plant Monday and ask about the hot water. What about adding chloride? Would that cure enough where I wouldn't have to blanket it if I pour in the morning? Just thinking about the neighborhood, don't want blankets to get stolen.
AJAX is offline   Reply With Quote
Old 10-11-2009, 01:01 PM   #6
Curmudgeon
 
neolitic's Avatar
Trade: carpentry/remodeling/"Yes M'am we do"
 
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 10,672
Quote:
Originally Posted by AJAX View Post
Thanks, I asked my guy but I know he needs the work so that's why I'm lookin for an unbiased opinion.

I'm going to call the plant Monday and ask about the hot water. What about adding chloride? Would that cure enough where I wouldn't have to blanket it if I pour in the morning? Just thinking about the neighborhood, don't want blankets to get stolen.
There's always visqueen and straw.
Keeping the fill warm is part of the battle
as well.
Cold fill will slow the set too.
__________________
Put your location in your profile!
(Sorry....it seems there really are dumb questions)
neolitic is online now   Reply With Quote
Old 10-11-2009, 01:18 PM   #7
concrete designer
Trade:
 
Join Date: Jul 2009
Posts: 39
There are a number of things you can so your finisher doesn't have to work into the moonlight. Blanketing the ground the night before, using calcium or non-calcium chloride + high early, pouring at a lower slump....
With lower temps., you'll still have to cover to retain heat.
user50444 is offline   Reply With Quote
Old 10-11-2009, 02:00 PM   #8
Pro
Trade: Concrete & masonry
 
Join Date: Oct 2008
Location: Wisconsin
Posts: 140
I agree with everything above. The only thing is: I would lay my insulating blankets & HOPE someone stole the stupid things! They're a necessary evil, by I stll opt for straw more often because it has a tendancy to leave less marks behind on the slab. One thing to keep in mind is that the control joints generally need to be sawed before the concrete can be un-covered for good.

BTW, in SE WI we generally will be able to pour things like garage slabs until early December, depending on the winter. Some years earlier, some later. We're trying to wrap up all exterior flatwork in the next week or 2 though.
jomama is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Leads and finding work BKFranks Business 20 10-04-2009 05:10 PM
Flat roof patio AJAX Roofing 3 09-22-2009 08:13 AM
Everycontractor = bad eggs golester Online Leads Services 41 04-10-2009 01:44 AM
Western PA subcontractor looking for work HallamContract Help Wanted or Looking For Work 0 03-25-2008 05:29 PM
In answer to a closed thread. AAPaint donb1959 Painting & Finish Work 42 08-27-2006 12:36 AM


Top of Page | View New Posts


All times are GMT -5. The time now is 12:22 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC