Old 06-27-2009, 11:24 AM   #1
Registered User
Trade: plumbing
 
Join Date: Jun 2009
Posts: 9
cold joint nervous

so i finally got our new house on the go. but, when my concrete guy was puoring the footer they were unable to finish the pour in one shot. it wasnt planned out like that, just some unforseen problems accured. but any way im very concerned about the "cold jiont" in the footer. it has rebar in it all the way around, so there will be bar where the joint is. the walls on top of it are going to be styrofoam and theres going to be rock laid under the slab. the footer is about 6 foot below grade (its a full basement) and laid on 'hardpan". should i have any concerns? any input will be greatly appreciated.

roadhouse is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 06-27-2009, 11:31 AM   #2
Pro
Trade: Bricklayer
 
Join Date: Jan 2009
Posts: 140
No reason for concern. Footings are poured in sections all the time. As long as the footings are doweled together and a keyway would have been a good idea.
NJ Brickie is offline   Reply With Quote
The Following User Says Thank You to NJ Brickie For This Useful Post:
JustaFramer (06-28-2009)
Old 06-27-2009, 11:37 AM   #3
Registered User
Trade: plumbing
 
Join Date: Jun 2009
Posts: 9
would the rebar running through be considered "dowling". could you explain "keyed", ima plumber so not a familier word.
roadhouse is offline   Reply With Quote
Old 06-27-2009, 11:50 AM   #4
Pro
Trade: Bricklayer
 
Join Date: Jan 2009
Posts: 140
yes the rebar going from the old pour to the new pour would be doweling. A keyway would be a groove in the footing where the old pour and new pour meet. It is done by placing a V cut 2x4 into the form work at the pour stop (where the pour is going to stop) vertically. Then removing this and the pour stop after the concrete sets up.This leaves a groove in the old pour for the new pour to lock into the old footing.
NJ Brickie is offline   Reply With Quote
The Following User Says Thank You to NJ Brickie For This Useful Post:
JustaFramer (06-28-2009)
Old 06-27-2009, 11:55 AM   #5
Registered User
Trade: plumbing
 
Join Date: Jun 2009
Posts: 9
thanks for the info, its to late to key it but atleast its dowled. hope i dont have any problems.
roadhouse is offline   Reply With Quote
Old 06-27-2009, 12:05 PM   #6
Pro
Trade: Bricklayer
 
Join Date: Jan 2009
Posts: 140
was a bulkhead placed where the old pour ended? What I mean is the footing stopped by a piece of formwork so that it is the full depth and does not just taper off? I would have some reservations if the footing just tapered off and you are going to have to pour over it in that section to level it off
NJ Brickie is offline   Reply With Quote
Old 06-27-2009, 01:48 PM   #7
Bunny by Malco - NY
 
Chris Johnson's Avatar
Trade: ICF Construction
 
Join Date: Apr 2007
Location: North of 49
Posts: 2,221
Yes, if it is not squared off that can be an issue. It is fairly simple to clean it up if not, just use a Hilti and chip it as square (90 degrees) as possible.

Personally I am not sold on a keyway if you have rebar in a footing, shouldn't be required. It is considered old school, engineers still draw it as habit but no one can explain why it is still there or needed.
__________________
Chris
Chris Johnson is offline   Reply With Quote
Old 06-27-2009, 02:16 PM   #8
Registered User
Trade: plumbing
 
Join Date: Jun 2009
Posts: 9
yes it does taper off and i will talk to them about squaring it off. whats the worst case scenario for a situation like this,ie: water issues or actuall structure problems?
roadhouse is offline   Reply With Quote
Old 06-27-2009, 02:16 PM   #9
Pro
Trade: Bricklayer
 
Join Date: Jan 2009
Posts: 140
Personally I am not sold on a keyway if you have rebar in a footing, shouldn't be required. It is considered old school, engineers still draw it as habit but no one can explain why it is still there or needed.[/quote]

You are most likely correct about the keyway in this situation. Just a little insurance that costs next to nothing, if planned ahead.
NJ Brickie is offline   Reply With Quote
Old 06-27-2009, 02:20 PM   #10
Pro
Trade: Bricklayer
 
Join Date: Jan 2009
Posts: 140
Square it off like chris said. Yes I would think you might have some structural issues in the future. Might be fine but why gamble?
NJ Brickie is offline   Reply With Quote
Old 06-27-2009, 04:41 PM   #11
Bunny by Malco - NY
 
Chris Johnson's Avatar
Trade: ICF Construction
 
Join Date: Apr 2007
Location: North of 49
Posts: 2,221
If it tapers off you end up with the concrete being too thin, concrete does not bond to concrete so that thinner section will crack and could potentially cause structural damage.

The keyway is spec'd in all drawings I get, I always question why I need a keyway when I have rebar dowels (#5, gr. 60) every 6-8" o.c., some engineers concede and say yes, ignore the keyway, others want it all, so me being lazy I pour and cut it in with a scrap of 2x material just to appease them.
__________________
Chris
Chris Johnson is offline   Reply With Quote
Old 06-28-2009, 09:29 AM   #12
Registered User
Trade: plumbing
 
Join Date: Jun 2009
Posts: 9
its not a long taper, probobly around 45 degrees or a little more so it shouldtnt be to thin. as far as structual, what am i looking at, the footer actually moving seperatly? seperating at the joint? if it moves, is going to crack my basement wall all the up?
roadhouse is offline   Reply With Quote
Old 06-28-2009, 09:29 AM   #13
Registered User
Trade: plumbing
 
Join Date: Jun 2009
Posts: 9
also thanks for the replies and info.
roadhouse is offline   Reply With Quote
Old 06-28-2009, 09:30 AM   #14
Pro
 
genecarp's Avatar
Trade: LI,NY designer, new homes, renovation work, concre
 
Join Date: Mar 2008
Location: Long Island, NY
Posts: 4,161
Quote:
Originally Posted by roadhouse View Post
its not a long taper, probobly around 45 degrees or a little more so it shouldtnt be to thin. as far as structual, what am i looking at, the footer actually moving seperatly? seperating at the joint? if it moves, is going to crack my basement wall all the up?
Are you really a plumber? If you are i will tell you what to do
__________________
genecarp is offline   Reply With Quote
Old 06-28-2009, 09:30 AM   #15
Bunny by Malco - NY
 
Chris Johnson's Avatar
Trade: ICF Construction
 
Join Date: Apr 2007
Location: North of 49
Posts: 2,221
potentially or theoretically yes, that is what can happen
__________________
Chris
Chris Johnson is offline   Reply With Quote
Old 06-28-2009, 09:33 AM   #16
Registered User
Trade: plumbing
 
Join Date: Jun 2009
Posts: 9
yes i am actually a plumber. for comfort systems usa in syracuse ny.
roadhouse is offline   Reply With Quote
Old 06-28-2009, 09:35 AM   #17
Pro
 
genecarp's Avatar
Trade: LI,NY designer, new homes, renovation work, concre
 
Join Date: Mar 2008
Location: Long Island, NY
Posts: 4,161
Quote:
Originally Posted by roadhouse View Post
yes i am actually a plumber. for comfort systems usa in syracuse ny.
THere is a product made for bonding cold joints, Google NITOBOND, apply the product, as directed, the joint will then be stronger than the surrounding area. G
__________________
genecarp is offline   Reply With Quote
Old 06-28-2009, 09:37 AM   #18
Pro
 
genecarp's Avatar
Trade: LI,NY designer, new homes, renovation work, concre
 
Join Date: Mar 2008
Location: Long Island, NY
Posts: 4,161
HERE YOU GO

http://www.scl.co.tt/Assets/nitobond%20ep...pdf
__________________
genecarp is offline   Reply With Quote
Old 06-28-2009, 09:51 AM   #19
Registered User
Trade: plumbing
 
Join Date: Jun 2009
Posts: 9
ill have to check into that nitobond. this hole situation just plain sucks. it seems to me that the footer is one of the most important parts of the whole house. this is probobly going to be hanging in my head for the next 50 years!
roadhouse is offline   Reply With Quote
Old 06-28-2009, 09:53 AM   #20
Pro
 
genecarp's Avatar
Trade: LI,NY designer, new homes, renovation work, concre
 
Join Date: Mar 2008
Location: Long Island, NY
Posts: 4,161
Rest easy, if you use the nitobond correctly, this will be a non issue. G
__________________
genecarp is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Hot water coming out of cold side Eric K Plumbing 12 06-29-2009 08:43 PM
Cold Jet/ColdJet 250-FP? ERAD_DIB Sandblasting 9 03-20-2009 07:07 AM
very cold outside air from cold air return ?? slawek HVAC 3 12-24-2008 09:30 AM
FDA to declare cold medicines too risky for babies, toddlers eagleandbaby Off Topic (Non Trade) 0 01-17-2008 09:36 AM
Best location for cold joint in footer n74tg Excavation & Site Work 4 06-09-2006 02:43 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 12:46 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC