Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Painting & Finish Work

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 10-22-2009, 08:18 PM   #1
Fine-ly Finished
Trade: General
 
Join Date: Sep 2008
Location: W. Michigan
Posts: 42
Sharing information

Why do you guys have such a hard time sharing information when it comes to pricing???

I've never seen a straight answer from anyone on this site when you reply to someones request for help in estimating a project.

It's not hard to think back to the last job you did and figure out if you made fair money on it, then answer the question.

Of course every job is different but there are some rules of thumb to go by and you should not be so stingy with the info when someone's gone to the trouble to ask for help.

To the guy that recently asked for help estimating an interior paint job of two rooms with an approx total of 6oo sq/ft: $2.25 per square foot is a rule of thumb for new construction painting.

Hey, that wasn't hard, i did not lose any money by sharing that info. Maybe I actually helped the trade by creating some consistancy in pricing.

If you want any more free advice just ask me, if i can help, I will.

Michael Helperperson2002@yahoo.com

fine-lyfinished is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 10-22-2009, 08:28 PM   #2
The Duke
 
framerman's Avatar
Trade: Framing, Custom Carpentry, Architectural Design
 
Join Date: Mar 2006
Location: Maine
Posts: 3,783
Blog Entries: 3
It's not a sharing problem, it's a question that cannot be answered accurately.

An example that shows how impossible the question is to answer is "How much is a gallon of gas?"

Whatever you answer for where you live, will not be the answer I have for where I live.
__________________
If one advances confidently in the direction of one's dreams,
and endeavors to live the life which one has imagined,
one will meet with a success unexpected in common hours
~Henry David Thoreau
framerman is online now   Reply With Quote
The Following 2 Users Say Thank You to framerman For This Useful Post:
J F (10-22-2009), nEighter (10-22-2009)
Old 10-22-2009, 08:29 PM   #3
Chief outhouse engineer
 
dakzaag's Avatar
Trade: mason
 
Join Date: Jan 2009
Location: NW Indiana
Posts: 365
Micheal, thanks so much for your thoughtful post. I couldn't agree more and I need all the help I can get.

Yesterday I started a chimney repair that I quoted at a discount because the customer is a repeat and next door to another job I am doing so I offered him a break. The problem is now that I have ripped his chimney down to the roof line I can see his liners are shot and he needs a rebuild down to the fire box. What do you think is a fair price?

Thanks again for the advice as I think this site is really nice except the pricing threads always end in three fifty.
__________________
D K & Sons
The maintenance schedule for brick
1. Stand back and say "man that looks nice!"
2. Repeat as often as needed.
dakzaag is offline   Reply With Quote
Old 10-22-2009, 08:30 PM   #4
J F
where did everybody go?
 
J F's Avatar
Trade: Remodeler
 
Join Date: Dec 2005
Location: North of Atlanta
Posts: 3,257
J F is offline   Reply With Quote
Old 10-22-2009, 08:32 PM   #5
J F
where did everybody go?
 
J F's Avatar
Trade: Remodeler
 
Join Date: Dec 2005
Location: North of Atlanta
Posts: 3,257
Quote:
Originally Posted by fine-lyfinished View Post
Why do you guys have such a hard time sharing information when it comes to pricing???

I've never seen a straight answer from anyone on this site when you reply to someones request for help in estimating a project.

It's not hard to think back to the last job you did and figure out if you made fair money on it, then answer the question.

Of course every job is different but there are some rules of thumb to go by and you should not be so stingy with the info when someone's gone to the trouble to ask for help.

To the guy that recently asked for help estimating an interior paint job of two rooms with an approx total of 6oo sq/ft: $2.25 per square foot is a rule of thumb for new construction painting.

Hey, that wasn't hard, i did not lose any money by sharing that info. Maybe I actually helped the trade by creating some consistancy in pricing.

If you want any more free advice just ask me, if i can help, I will.

Michael Helperperson2002@yahoo.com
says the guy with 7 posts (at this point)
J F is offline   Reply With Quote
Old 10-22-2009, 08:39 PM   #6
Fine-ly Finished
Trade: General
 
Join Date: Sep 2008
Location: W. Michigan
Posts: 42
Chimney rebuild question

My first suggestion is that you limit to whom you give discounts to. The repeat customer? ok, but the neighbor gets no break (in my opinion).

I assume you collected the money for the initial job. Now that you have discoverd new problem you make a new deal. I have little experience in this field as i am a finish guy. That is where sharing is important, you should goto the mansonay forum and ask that question. Sadly though I don't think other contractors think the way i do, that is that sharing info is a good thing.

Call the supply store ask what one section of liner costs, should be easy to give a price for the materials that way, then give the guy the price of 1 days work. for me that is 350
fine-lyfinished is offline   Reply With Quote
Old 10-22-2009, 08:42 PM   #7
Pro
 
Workaholic's Avatar
Trade: Painting Contractor
 
Join Date: Feb 2007
Location: Huntsville Alabama
Posts: 1,182
When you walk into a forum and your first post is how much??? Well that kind of sets the tone of the thread. you think this guy does not know his own production rates, this guy is lacking in experience, why would someone without the basic skills of operating a business charge the same thing I charge. Not to mention regional differences and the the fact that he is more than likely operating without insurance and license.

I think you should start a guru thread, ask me I have all the answers. We have not had one of those in awhile.
__________________
Sean
Workaholic is offline   Reply With Quote
Old 10-22-2009, 08:42 PM   #8
Fine-ly Finished
Trade: General
 
Join Date: Sep 2008
Location: W. Michigan
Posts: 42
I have done work in New Mexico, Texas, Mass. Fla and Michigan ALL THIS YEAR. and the price is pretty much the same everywhere, so that excuse does not work well.
fine-lyfinished is offline   Reply With Quote
Old 10-22-2009, 08:43 PM   #9
Starving Tile Artist
 
wizendwizard's Avatar
Trade: Carpentry, Flooring & (UGLY) Tile installs.
 
Join Date: Nov 2007
Location: South Carolina
Posts: 1,124
Send a message via Yahoo to wizendwizard
Quote:
Originally Posted by fine-lyfinished View Post
Why do you guys have such a hard time sharing information when it comes to pricing???

I've never seen a straight answer from anyone on this site when you reply to someones request for help in estimating a project.

It's not hard to think back to the last job you did and figure out if you made fair money on it, then answer the question.

Of course every job is different but there are some rules of thumb to go by and you should not be so stingy with the info when someone's gone to the trouble to ask for help.

To the guy that recently asked for help estimating an interior paint job of two rooms with an approx total of 6oo sq/ft: $2.25 per square foot is a rule of thumb for new construction painting.

Hey, that wasn't hard, i did not lose any money by sharing that info. Maybe I actually helped the trade by creating some consistancy in pricing.

If you want any more free advice just ask me, if i can help, I will.

Michael Helperperson2002@yahoo.com
OK lets look at this.

You give a price of $2.25 per square ft openly.

You closest competitor sees your post and says. "Good deal, I think I will charge $2.00 per sq ft"

Contractor Bob gets hit by the HO that his lowest bid on the job is $2.00 per sq ft. He says, "Well hell, I can beat that! I'll do it for $1.50 per sq ft.

HO calls just one more "contractor". This guy is off of Craigslist and will beat anybodies price. He'll do it for $1.00 per sq ft.

All this because you thought by giving out your pricing in an open forum you could help someone.

Well, you did. Unfortunately now you are out of business because you can't compete at that price.
__________________
"If you start the grout process over, you too could use sparkly grout!"
Columbia SC Tile Installer
http://www.adepthomerepair.com
Adept Home Repair Services
wizendwizard is offline   Reply With Quote
The Following User Says Thank You to wizendwizard For This Useful Post:
Frankawitz (10-23-2009)
Old 10-22-2009, 08:43 PM   #10
Fine-ly Finished
Trade: General
 
Join Date: Sep 2008
Location: W. Michigan
Posts: 42
Quote:
Originally Posted by J F View Post
says the guy with 7 posts (at this point)
how many posts do you have to have to be a nice guy and share info?
fine-lyfinished is offline   Reply With Quote
Old 10-22-2009, 08:45 PM   #11
Fine-ly Finished
Trade: General
 
Join Date: Sep 2008
Location: W. Michigan
Posts: 42
Quote:
Originally Posted by wizendwizard View Post
OK lets look at this.

You give a price of $2.25 per square ft openly.

You closest competitor sees your post and says. "Good deal, I think I will charge $2.00 per sq ft"

Contractor Bob gets hit by the HO that his lowest bid on the job is $2.00 per sq ft. He says, "Well hell, I can beat that! I'll do it for $1.50 per sq ft.

HO calls just one more "contractor". This guy is off of Craigslist and will beat anybodies price. He'll do it for $1.00 per sq ft.

All this because you thought by giving out your pricing in an open forum you could help someone.

Well, you did. Unfortunately now you are out of business because you can't compete at that price.
Not true, people underbid eachother all the time because the HO is the one sharing his other bids trying to get the next guy to go lower.
fine-lyfinished is offline   Reply With Quote
Old 10-22-2009, 08:47 PM   #12
Starving Tile Artist
 
wizendwizard's Avatar
Trade: Carpentry, Flooring & (UGLY) Tile installs.
 
Join Date: Nov 2007
Location: South Carolina
Posts: 1,124
Send a message via Yahoo to wizendwizard
Quote:
Originally Posted by fine-lyfinished View Post
Not true, people underbid eachother all the time because the HO is the one sharing his other bids trying to get the next guy to go lower.
So you are claiming that my senario isn't possible?

I know for fact that it is. I've seen it too many times.
__________________
"If you start the grout process over, you too could use sparkly grout!"
Columbia SC Tile Installer
http://www.adepthomerepair.com
Adept Home Repair Services
wizendwizard is offline   Reply With Quote
Old 10-22-2009, 08:47 PM   #13
Fine-ly Finished
Trade: General
 
Join Date: Sep 2008
Location: W. Michigan
Posts: 42
Quote:
Originally Posted by Workaholic View Post
When you walk into a forum and your first post is how much??? Well that kind of sets the tone of the thread. you think this guy does not know his own production rates, this guy is lacking in experience, why would someone without the basic skills of operating a business charge the same thing I charge. Not to mention regional differences and the the fact that he is more than likely operating without insurance and license.

I think you should start a guru thread, ask me I have all the answers. We have not had one of those in awhile.
I don't have all the answers, I said as much in the original post. If i can help i will gladly do so. We're all brothers on this earth.
fine-lyfinished is offline   Reply With Quote
Old 10-22-2009, 08:49 PM   #14
Fine-ly Finished
Trade: General
 
Join Date: Sep 2008
Location: W. Michigan
Posts: 42
Quote:
Originally Posted by wizendwizard View Post
So you are claiming that my senario isn't possible?

I know for fact that it is. I've seen it too many times.
you've seen guys share a price on this site and cause 4 others to underbid eachother?? many times??
fine-lyfinished is offline   Reply With Quote
Old 10-22-2009, 08:52 PM   #15
Starving Tile Artist
 
wizendwizard's Avatar
Trade: Carpentry, Flooring & (UGLY) Tile installs.
 
Join Date: Nov 2007
Location: South Carolina
Posts: 1,124
Send a message via Yahoo to wizendwizard
Quote:
Originally Posted by fine-lyfinished View Post
you've seen guys share a price on this site and cause 4 others to underbid eachother?? many times??
I said "openly", I never said on this site.

All in all, I know of 6 of my competitors that visit this site. I would never give out my numbers here.
__________________
"If you start the grout process over, you too could use sparkly grout!"
Columbia SC Tile Installer
http://www.adepthomerepair.com
Adept Home Repair Services
wizendwizard is offline   Reply With Quote
The Following User Says Thank You to wizendwizard For This Useful Post:
skyhook (10-22-2009)
Old 10-22-2009, 08:56 PM   #16
Sean
 
SLSTech's Avatar
Trade: General Contractor
 
Join Date: Sep 2008
Location: Cullman, AL
Posts: 3,418
Send a message via Skype™ to SLSTech
Quote:
Originally Posted by dakzaag View Post
...except the pricing threads always end in three fifty.
Dakzaag, you have been here long enough, its tree-fiddy get it right my man (long live Mickeyco)

Ok, moving on....

Michael, I am so glad that you have volunteered to help everyone out with pricing. I think we get about an average of 3 posts a day here & I am sure that number will go up now that you volunteered. You might want to take a look into a few federal rules regarding price fixing, restraint of trade, just to name a few that apply.

Good luck in your new career
SLSTech is online now   Reply With Quote
Old 10-22-2009, 08:57 PM   #17
J F
where did everybody go?
 
J F's Avatar
Trade: Remodeler
 
Join Date: Dec 2005
Location: North of Atlanta
Posts: 3,257
Quote:
Originally Posted by fine-lyfinished View Post
how many posts do you have to have to be a nice guy and share info?
right around 3,000 or so
J F is offline   Reply With Quote
Old 10-22-2009, 08:57 PM   #18
J F
where did everybody go?
 
J F's Avatar
Trade: Remodeler
 
Join Date: Dec 2005
Location: North of Atlanta
Posts: 3,257
and it has nothing to do with being "a nice guy"
J F is offline   Reply With Quote
Old 10-22-2009, 08:58 PM   #19
Fine-ly Finished
Trade: General
 
Join Date: Sep 2008
Location: W. Michigan
Posts: 42
Quote:
Originally Posted by wizendwizard View Post
I said "openly", I never said on this site.

All in all, I know of 6 of my competitors that visit this site. I would never give out my numbers here.
what kind of advice do you get here? Any advice will make you better and thus tougher competition for the others, so this site should not even exist.
fine-lyfinished is offline   Reply With Quote
Old 10-22-2009, 08:58 PM   #20
J F
where did everybody go?
 
J F's Avatar
Trade: Remodeler
 
Join Date: Dec 2005
Location: North of Atlanta
Posts: 3,257
it's all about not having the necessary information to make an informed decision
J F is offline   Reply With Quote
Reply

Tags
estimating, painting, pricing, share


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
sharing a tip for keeping track of schedule 72chevy4x4 Business 9 09-10-2009 06:44 PM
Building Information Modeling (BIM) willard997 Drafting & CAD Forum 5 04-21-2009 12:07 AM
AutoCAD to .pdf - missing information BeckMacer Drafting & CAD Forum 3 02-04-2009 08:12 PM
Need Pacific Region Information Muntzster General Discussion 3 11-11-2008 10:36 AM
look forward to sharing mark the coach Introductions 3 08-16-2008 05:17 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 04:30 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC