Finishing up a job, and it turns out the floor in the bathroom isn't quite level. It looks like one of the floor joists is crowning, and one of the adjacent joists is slightly lower.

Anyways, the hardibacker is down, and bonded to the floor with Versibond, but now there is a small area that needs to be leveled. Is it ok to use self leveling cement, directly on the hardibacker? There will be a 3/8 travertine going down once the floor is level.

Anyone have experience with this?

__________________
James
-Ridgeline Development
ridgeline_dev is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 10-26-2008, 09:45 AM   #2
Developer
 
ridgeline_dev's Avatar
 
Trade: Development
Join Date: Apr 2006
Location: Denver, CO
Posts: 31
Send a message via AIM to ridgeline_dev

Re: SLC Over Hardibacker?


I should mention, the area to be leveled is very small. Maybe 2 x 2.
__________________
James
-Ridgeline Development
ridgeline_dev is offline  
Old 10-26-2008, 02:02 PM   #3
Remodeling GC
 
kevjob's Avatar
 
Trade: Remodeling General Contractor
Join Date: Aug 2006
Location: Denver Colorado
Posts: 2,033

Re: SLC Over Hardibacker?


What is the structure of the floor? 2x8 2x10? what is the span of the joists? and how many layers of plywood do you have? for stone you need at least 3/4 and 1/2 inch ply for defelection, if all is good then I would use medium bed thinset if it is over a 1/4 inch and float it one day the set the next.
kevjob is online now  
Old 10-26-2008, 03:10 PM   #4
Developer
 
ridgeline_dev's Avatar
 
Trade: Development
Join Date: Apr 2006
Location: Denver, CO
Posts: 31
Send a message via AIM to ridgeline_dev

Re: SLC Over Hardibacker?


I don't think deflection is a problem. 2x10s @ 16 OC, with a span of about 8 feet. 1/2" hardibacker set in thinset on top of 3/4" plywood. Feels like a rock when walking on it.

So you are saying just use some thinset to level it out, let it dry, and set tile on top of that. It could probably come up about 1/4-3/8" at the lowest point. Definitely not more than 1/2".

Thanks for the help.
__________________
James
-Ridgeline Development
ridgeline_dev is offline  
Old 10-26-2008, 03:40 PM   #5
Pro
 
JazMan's Avatar
 
Trade: Tile Contractor-Manufacturers rep. Tile & Marble
Join Date: Feb 2007
Location: Troy, Michigan
Posts: 238

Re: SLC Over Hardibacker?


You may not think deflection is a problem, but every tile pro will tell you that your single 3/4" spanning 16" o.c. has too much deflection for natural stone tiles. You're correct though that the joists' deflection meets requirements. But......I guess it's too late now?

The out-of-plane dimensions seem to be growing, how much is it? You may need to go back to an SLC? The floor needs to be very flat, level is not required. It should be within 1/4" in 10 ft. AND 1/16" in 12" of the required plane. With large or stone tiles, I recommend within 1/8" in 10' and 1/16" in 12".

Is this your own house, or you doing it as a job?

Jaz
__________________
Tile 4 You llc
KERDI Shower
specialist...DITRA Installs...
www.tile4you.com
JazMan is offline  
Old 10-26-2008, 04:01 PM   #6
Developer
 
ridgeline_dev's Avatar
 
Trade: Development
Join Date: Apr 2006
Location: Denver, CO
Posts: 31
Send a message via AIM to ridgeline_dev

Re: SLC Over Hardibacker?


Quote:
Originally Posted by JazMan View Post
You may not think deflection is a problem, but every tile pro will tell you that your single 3/4" spanning 16" o.c. has too much deflection for natural stone tiles. You're correct though that the joists' deflection meets requirements. But......I guess it's too late now?

The out-of-plane dimensions seem to be growing, how much is it? You may need to go back to an SLC? The floor needs to be very flat, level is not required. It should be within 1/4" in 10 ft. AND 1/16" in 12" of the required plane. With large or stone tiles, I recommend within 1/8" in 10' and 1/16" in 12".

Is this your own house, or you doing it as a job?

Jaz
This happens to be in my own house.

After looking at it again the lowest point is only 1/4", so not as bad as i thought. The floor is flat and level with the exception of this one area.

So back to the original question...SLC or thinset. I am leaning towards thinset at this point.
__________________
James
-Ridgeline Development
ridgeline_dev is offline  
Old 10-26-2008, 04:50 PM   #7
Pro
 
JazMan's Avatar
 
Trade: Tile Contractor-Manufacturers rep. Tile & Marble
Join Date: Feb 2007
Location: Troy, Michigan
Posts: 238

Re: SLC Over Hardibacker?


You should be able to correct the dip if it's about 1/4"? You measure this with a long straight edge? Latex modified of course. What thinset are you planning to use to set the travertine? I assume the tiles are 12x12?

Jaz
__________________
Tile 4 You llc
KERDI Shower
specialist...DITRA Installs...
www.tile4you.com
JazMan is offline  
Old 10-26-2008, 05:33 PM   #8
Developer
 
ridgeline_dev's Avatar
 
Trade: Development
Join Date: Apr 2006
Location: Denver, CO
Posts: 31
Send a message via AIM to ridgeline_dev

Re: SLC Over Hardibacker?


Quote:
Originally Posted by JazMan View Post
You should be able to correct the dip if it's about 1/4"? You measure this with a long straight edge? Latex modified of course. What thinset are you planning to use to set the travertine? I assume the tiles are 12x12?

Jaz
Yep, 3' level, and a 1/4' drop is all that is there at the lowest point.

Yes, these are 12 x 12 tiles. It's not a large area, about 5 x 8 or so. Was planning to use normal versabond as that is what our tile guys have used in the past for travertine, but I may go with versabond flex. I believe both are latex modified.

Any thoughts on one or the other.
__________________
James
-Ridgeline Development
ridgeline_dev is offline  
Old 10-26-2008, 05:49 PM   #9
Chief Toilet Mover
 
Mike Finley's Avatar
 
Trade: Bathroom Remodeling
Join Date: Apr 2004
Location: Littleton, Colorado
Posts: 14,078

Re: SLC Over Hardibacker?


In the future if there is a future time you might want to invest in a power planer, for such a small issue as you are having, we would have wacked that high spot with the planer (nails are a bitch on the blade, but that's about all we use it for), then when you put down your thinset for your underlayment we would have again made up for it a bit. Going just a hair thinner on the high spot and a hair thicker in the low spot with the thinset and put in the underlayment. Anything left over still high and low would have now been taken care of with the tile setter.

What I'm explaining is doing small 1/16 or 1/8 corrections between all the layers which would have ended up in a flat floor in the end. You can't use this technique for the extreme problems but when you are just making up for a few problem areas it works quite well.

We also only use Flexbond for both layers.
Mike Finley is offline  
Old 10-26-2008, 06:59 PM   #10
Pro
 
JazMan's Avatar
 
Trade: Tile Contractor-Manufacturers rep. Tile & Marble
Join Date: Feb 2007
Location: Troy, Michigan
Posts: 238

Re: SLC Over Hardibacker?


James,

A 3 ft. level is not long enough to measure the dip. Get something longer.

Versabond is a good value, but it's a very cheap entry level modified thinset, nothing to brag about. It'll probably work though, certainly meets minimum specifications. VersaBond Flex, FlexBond or actually Marble & Granite would be much better.

Jaz
__________________
Tile 4 You llc
KERDI Shower
specialist...DITRA Installs...
www.tile4you.com
JazMan is offline  
Old 10-26-2008, 07:58 PM   #11
Developer
 
ridgeline_dev's Avatar
 
Trade: Development
Join Date: Apr 2006
Location: Denver, CO
Posts: 31
Send a message via AIM to ridgeline_dev

Re: SLC Over Hardibacker?


Quote:
Originally Posted by JazMan View Post
James,

A 3 ft. level is not long enough to measure the dip. Get something longer.

Versabond is a good value, but it's a very cheap entry level modified thinset, nothing to brag about. It'll probably work though, certainly meets minimum specifications. VersaBond Flex, FlexBond or actually Marble & Granite would be much better.

Jaz
Sorry I meant a 4ft level. The bathroom is only 5 feet wide, so can't go much longer.

Planning to switch to a Flexbond when setting tile.

Thanks.
__________________
James
-Ridgeline Development
ridgeline_dev is offline  
Old 10-26-2008, 08:29 PM   #12
Remodeling GC
 
kevjob's Avatar
 
Trade: Remodeling General Contractor
Join Date: Aug 2006
Location: Denver Colorado
Posts: 2,033

Re: SLC Over Hardibacker?


try customs marble and granite thinset which is a medium bed which will support the stones better while setting up, sometimes the heavy stones will sag regular thinset and usually happens after you left it looking perfect. use white, whatever thinset you choose.
kevjob is online now  
Old 10-26-2008, 11:52 PM   #13
Tile Contractor
 
Bud Cline's Avatar
 
Trade: Building Trades-Specializing in Ceramic Tile
Join Date: Feb 2006
Location: Hastings Nebraska
Posts: 1,216

Re: SLC Over Hardibacker?


James if you use thinset you will absolutely want to get the Hardie wet before you apply the thinset. Put a bunch of water on the Hardie and let it soak in before you screed it. Thinset will also shrink somewhat so be prepared to address that issue if it happens drastically.

Thinset will be your best bet in this case. You can work it as you install it and feather the edges. Should work fine.
Bud Cline is offline  
Old 10-27-2008, 10:05 PM   #14
Developer
 
ridgeline_dev's Avatar
 
Trade: Development
Join Date: Apr 2006
Location: Denver, CO
Posts: 31
Send a message via AIM to ridgeline_dev

Re: SLC Over Hardibacker?


Marble and Granite thinset it is.

Thanks all for the help. I'll throw some pics up once it's done.

Cheers.
__________________
James
-Ridgeline Development
ridgeline_dev is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Hardibacker vs Easyboard (foam based) Nick1123 Flooring 17 09-10-2008 06:01 PM
Hardibacker Board/Cultured Stone --Tscarborough ? KSUlivy Masonry 6 07-30-2008 05:01 PM
Hardibacker down, ready for tile-wait? buildenterprise Ceramic & Stone Tile 17 03-12-2008 11:37 PM
HardiBacker over hardwood-how to attach? buildenterprise Ceramic & Stone Tile 5 03-10-2008 10:57 PM
hardibacker over linoleum A.W.Davis Flooring 6 10-22-2006 03:19 AM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?