Need advice on a tear up

I'm working on a bid for a remodel job that involves among other things, tearing out and replacing ceramic tile floor. The tile that is on the floor now was installed by the H/O when the house was built. He says there is no backing board under the tile and it was glued down to the sub floor with a flooring adhesive instead of thin set. What are the chances that this stuff will come up without taking the top off of the sub floor? My first thought is to try to talk the H/O out of replacing the tile. There is nothing wrong with it except she's just ready for a change. My second thought is that if the tiles aren't loose, popping up etc. that they are probably stuck pretty good but I wouldn't know that until I try to bust it up. I've asked a couple of flooring contractors about it and no one wants to touch it. Anybody ever ran into anything like this?

SC sawdaddy is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 08-03-2009, 12:22 PM   #2
Internet Creep
 
angus242's Avatar
Trade: Kitchen/Bath Remodeling, Tile
 
Join Date: Oct 2007
Location: Will County, Illinois
Posts: 1,183
Bid out the demo as if it were a proper tile installation. Then bid the install with adding a new layer of 1/2" ply with Ditra.

That's assuming the subfloor construction is within specs.
__________________
"If you're good at something, never do it for free."
angus242 is offline   Reply With Quote
The Following User Says Thank You to angus242 For This Useful Post:
SC sawdaddy (08-03-2009)
Old 08-03-2009, 12:31 PM   #3
Pro
 
trptman's Avatar
Trade: remodeling and restorations
 
Join Date: Mar 2007
Location: Ohio
Posts: 434
seems to me about all you can do is give her a price based on the possibility you need to replace the subfloor. Until you start, you aren't going to know how they will come up (the joys of remodeling).

The other thing, and this depends on the physical situation you have, is maybe going over the existing tile with new subfloor etc. this will add thickness to the floor and may create some problems transitioning from room to room, but it might be an option.

or you rip the old tile up and if it damages the subfloor too much, you just put another fresh layer of subfloor.

there's several ways to approach it-but it all depends. you are there and we aren't.

if the thickness of the floor is critical and you can't layer anything more on there-then just price it as if you need to replace the subfloor. Or make sure she understands that once you start your price will jump from x to x+y if the tile don't come up leaving the floor intact etc.

I'm not a full time tile installer and maybe someone else can help a bit more, but I don't see much other option. unless (and I've never done this so I'm of limited help on the details) you want to tile directly over the existing. I'm just not sure what you would need to do to prep the old tile surface and then you have the underlying issue of the original layer may or may not be adhered correctly since the HO did it. You would need to adjust the warranty on your work to account for that.

hope that helps at least a little
trptman is offline   Reply With Quote
The Following User Says Thank You to trptman For This Useful Post:
SC sawdaddy (08-03-2009)
Old 08-03-2009, 05:41 PM   #4
Member
Trade: Flooring & Remodeling
 
Join Date: Jul 2009
Location: Dallas TX
Posts: 99
Just do what trtpman said.

But remember, the smaller the job , the higher the price per sq ft. So if its just an 5 x 10 ft entryway jack the price up.
finaltouchfloor is offline   Reply With Quote
Old 08-03-2009, 06:30 PM   #5
Internet Creep
 
angus242's Avatar
Trade: Kitchen/Bath Remodeling, Tile
 
Join Date: Oct 2007
Location: Will County, Illinois
Posts: 1,183
I would NOT consider installing new tile over tile that has been installed with flooring adhesive. You're asking for trouble there. Ask yourself if you're willing to trust the original install to place yours over. One problem with the tile glued directly to a subfloor and your install is screwed. Now it's your problem.
__________________
"If you're good at something, never do it for free."
angus242 is offline   Reply With Quote
Old 08-03-2009, 07:19 PM   #6
BHR
Dufus Extrodinaire
 
BHR's Avatar
Trade: Residential Renovations
 
Join Date: Jan 2009
Location: Ontario, Canada
Posts: 151
I think the pig of the thing would be trying to get the tile off clean - Likely there will be a million little chards stuck to the subfloor. I would go with the suggestions here about pricing. Hope for the best, but surely expect the worst.
__________________
If I had one I would share it
BHR is offline   Reply With Quote
Old 08-03-2009, 07:27 PM   #7
Moderator
 
Double-A's Avatar
Trade: GC - Remodeling Specialists
 
Join Date: Jul 2006
Location: Arkansas
Posts: 4,467
Send a message via ICQ to Double-A
I've run into this twice and both times we had to replace the subfloor.

We demo'd a row of tiles, skipped a few, then demo'd another row. Same with perpendicular rows... We then cut the subfloor into pieces and removed in big sections. Because of weight, dust, and the possibility of a screwed down subfloor, we now estimate these jobs at about 3 man hours per 32 square feet for demo and joist prep for new subfloor.

Hope that helps.
__________________
"My clients’ wishes are the center of my attention." -- David Guido, a contractor in Woodstock, N.Y.
New York Times, July 20, 2006
Double-A is offline   Reply With Quote
Old 08-03-2009, 08:16 PM   #8
Pro
 
Mellison's Avatar
Trade: Home Improvement General Contractor
 
Join Date: Aug 2008
Location: NYC
Posts: 885
Quote:
Originally Posted by trptman View Post
seems to me about all you can do is give her a price based on the possibility you need to replace the subfloor. Until you start, you aren't going to know how they will come up (the joys of remodeling).

The other thing, and this depends on the physical situation you have, is maybe going over the existing tile with new subfloor etc. this will add thickness to the floor and may create some problems transitioning from room to room, but it might be an option.

or you rip the old tile up and if it damages the subfloor too much, you just put another fresh layer of subfloor.

there's several ways to approach it-but it all depends. you are there and we aren't.

if the thickness of the floor is critical and you can't layer anything more on there-then just price it as if you need to replace the subfloor. Or make sure she understands that once you start your price will jump from x to x+y if the tile don't come up leaving the floor intact etc.

I'm not a full time tile installer and maybe someone else can help a bit more, but I don't see much other option. unless (and I've never done this so I'm of limited help on the details) you want to tile directly over the existing. I'm just not sure what you would need to do to prep the old tile surface and then you have the underlying issue of the original layer may or may not be adhered correctly since the HO did it. You would need to adjust the warranty on your work to account for that.

hope that helps at least a little
Bingo.



Or:




__________________
"Enjoy Every Sandwich" Warren Zevon
Mellison is offline   Reply With Quote
Old 08-04-2009, 09:40 AM   #9
Pro
 
SC sawdaddy's Avatar
Trade: GC, Remodels, New Homes, Whatevers biting
 
Join Date: Oct 2008
Location: South Carolina
Posts: 451
Quote:
Originally Posted by BHR View Post
I think the pig of the thing would be trying to get the tile off clean - Likely there will be a million little chards stuck to the subfloor. I would go with the suggestions here about pricing. Hope for the best, but surely expect the worst.
That is what I foresee happening. I like Mellison's 2nd option but dont think that would be feasible for a 500 sq/ft job. Thanks for your comments guys I'll keep you posted.
SC sawdaddy is offline   Reply With Quote
Old 08-04-2009, 02:14 PM   #10
improving homes
Trade: Roofing/Remodeling
 
Join Date: Nov 2008
Location: wisconsin
Posts: 247
Your best bet is to do like double a and just bid the job for ripping the subfloor out. Just rip it out and be done with it so you can start with a fresh surface and you won't have any surprises. I've learned that most of the time in situations like this it never works out the way you hope and you end up tearing it all out anyway and then your in a bad mood cause things don't go like you planned. So most of the time I will just bid it to rip everything out in the first place and it usually ends up saving some time since you just get in and do it instead of trying it one way and hoping and then end up doing it the other way.

If it's not that big of an area it shouldn't take that long. If Double A bids 3 hours for 32 sq ft a normal bathroom would only be around 5 to 6 man hours so your not talking a huge expense, plus you would have to bid some demo anyway if you were going to try and rip the old tile out and save the floor. To me it's a no brainer that I would just charge for the full demo and explain to the HO the benifits of doing it this way to insure they get the best job by starting fresh.

Good Luck
platinumLLC is offline   Reply With Quote
Old 08-26-2009, 12:45 AM   #11
Registered User
Trade: Tile and Stone Installation
 
Join Date: Dec 2007
Posts: 6
You could go over the existing tile with Ditra Mat is there isnt a height issue. Sometimes the tile will come up easy, you can try removing a tile in an inconspicuous area if possible.
EliteDimensions is offline   Reply With Quote
The Following User Says Thank You to EliteDimensions For This Useful Post:
charimon (08-29-2009)
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Advice wanted for starting a construction firm P.J. Construction 34 10-09-2009 01:51 PM
Advice on a New Hire CookeCarpentry Business 69 08-03-2009 10:06 PM
New to US need some advice. BCConstruction Construction 62 07-27-2009 02:23 PM
Advice for starting Career as Operating Engineer TrendTherapy Excavation & Site Work 0 02-13-2009 11:07 AM
Professional Salesmen I need your advice. Grumpy Marketing & Sales 43 12-23-2008 07:31 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 08:30 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC