Old 08-24-2009, 06:03 PM   #1
Member
Trade: Home improvements and renovations
 
Join Date: Aug 2009
Location: Upstate South Carolina
Posts: 38
Leveling concrete porch and installing slate tile.

Hi, I have a project that involves leveling a concrete porch and installing slate tiles. The porch was built out of level by about 2.5 inches on one corner. It looks bad and the home owners want it fixed.

My plan is to build it up/ level it with mortar mix and install the tile in the usual manner. I'm not a tile layer so I'm not sure if using mortar mix is a good way to go.

--Rick

Rickle is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 08-24-2009, 10:42 PM   #2
Registered User
Trade: flooring- tile/marble/stone/wood & laminate
 
Join Date: Sep 2007
Posts: 13
Go for a flat plane rather than level

See if you cna determine flat plan by setting screets with wood shim from the deepest part of the low corner to a main area in the rest of the porch that would serve as a good basis to merge your low corner with the rest of the porch. Most likely this will not be perfectly level but this should serve to resolve into a flat plane. Rember screeting mud requires at least an 1 1/4" of bed, anything lower will not work well.
gumba is offline   Reply With Quote
Old 08-25-2009, 08:12 AM   #3
Member
Trade: Home improvements and renovations
 
Join Date: Aug 2009
Location: Upstate South Carolina
Posts: 38
But is it ok to use mortar mix for this?
Rickle is offline   Reply With Quote
Old 08-26-2009, 09:48 PM   #4
Pro
 
jarvis design's Avatar
Trade: Bathroom Design Build Contractor
 
Join Date: May 2008
Location: London, Ontario, Canada
Posts: 438
I had to do the same thing with my own front step which was 2 1/2" off level side to side. I framed around it (level), put in some wire, and used mortor mix. I also poured a new step on top of that and a pad beside.
Because its Canada, I was concerned with too much moisture getting into the concrete so I installed ditra (with kerdi) to waterproof the entire assembly before tiling. I used a 12"x24" porcelain tile and used laticrete spectralock epoxy grout.
It's been a year (with a damn cold winter!) - looks like the day I put it in!
__________________
Do it Right the First Time....or someone else will!!

www.JarvisDesignBuild.ca
jarvis design is offline   Reply With Quote
Old 08-26-2009, 11:01 PM   #5
Tile Contractor
Trade: Building Trades-Specializing in Ceramic Tile
 
Join Date: Feb 2006
Location: Hastings Nebraska
Posts: 975
Sand mix is used, not mortar mix. Mortar mix contains lime and will be somewhat sticky, lime will cause the straightedge to drag. The minimum is 3/4" but striving for 1-1/4" is desired.

The sand mix is mixed very dry then packed (NOT POURED) into place. The straightedge ("screed") is dragged over the surface to achieve the plane. Steel pipes can be used to establish level and to drag the straightedge on top of. Once the surface is flat the pipes are removed and the voids filled and scraped flat to match the surface.

A surface primer is required. Liquid concrete primer will work. Thinset tile mortar can also be used either thrown down dry or mixed and trowelled to bond the sand mix to the existing concrete.

Last edited by Bud Cline; 08-26-2009 at 11:03 PM.
Bud Cline is offline   Reply With Quote
Old 08-30-2009, 12:59 PM   #6
Pro
Trade: flooring
 
Join Date: Apr 2005
Posts: 100
just a thought. did this slab sink or was it really built like that? I repaired a porch where the slab sank . the slab was mudjacked to fill any voids below before any tile work was done. tap the slab in that area to hear if it sounds hollow. fix it before tiling. you'll be glad you did.
olzo55 is offline   Reply With Quote
Old 08-30-2009, 09:50 PM   #7
Pro
 
jarvis design's Avatar
Trade: Bathroom Design Build Contractor
 
Join Date: May 2008
Location: London, Ontario, Canada
Posts: 438
Quote:
Originally Posted by olzo55 View Post
just a thought. did this slab sink or was it really built like that? I repaired a porch where the slab sank . the slab was mudjacked to fill any voids below before any tile work was done. tap the slab in that area to hear if it sounds hollow. fix it before tiling. you'll be glad you did.

When I did mine it had sunk. As part of the project I re-landscaped the area to ensure proper drainage - which before directed all the water to under the slab that had sunk.
__________________
Do it Right the First Time....or someone else will!!

www.JarvisDesignBuild.ca
jarvis design is offline   Reply With Quote
Old 09-03-2009, 02:45 PM   #8
Member
Trade: Home improvements and renovations
 
Join Date: Aug 2009
Location: Upstate South Carolina
Posts: 38
There was no sign of it sinking any where, the brick was level but the pad was formed and poured on top. It was obviously made that way. I think the form sagged on them during the pour and they went with it any way.

As describe in an other post I anchored leveling boards to the perimeter and used the mortar mix. Turned out great.
Rickle is offline   Reply With Quote
Old 09-04-2009, 07:19 PM   #9
Member
Trade: Home improvements and renovations
 
Join Date: Aug 2009
Location: Upstate South Carolina
Posts: 38
Here's a pic of the result. Not to bad for a rookie tile setter eh?
Attached Thumbnails
leveling-concrete-porch-installing-slate-tile-p1060451_full.jpeg  
Rickle is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off





Top of Page | View New Posts


All times are GMT -5. The time now is 07:53 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC