Installing Patios And Walks In The Dead Of Winter In Massachusetts


I layed a 60' walk in febuary. dug up the frozen loam and did my thing. 2 years later the walk has not moved and is still perfect. Has anyone else tried this and had a different outcome due to ground heaving?

J-Mac is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 02-04-2009, 06:18 PM   #2
Custom Hardscapes
 
timmyb's Avatar
 
Trade: General Contractor
Join Date: Feb 2009
Location: TX
Posts: 1

Re: Installing Patios And Walks In The Dead Of Winter In Massachusetts


it sounds like you did it right if it hasn't moved. i did a similar project (smaller patio) and its still going strong. of course, we here in TX don't have to worry about MA winters.
timmyb is offline  
Old 02-04-2009, 06:37 PM   #3
Pro
 
concretemasonry's Avatar
 
Trade: Masonry consultant
Join Date: Nov 2006
Location: MSP, Minnesota
Posts: 2,447

Re: Installing Patios And Walks In The Dead Of Winter In Massachusetts


You were lucky and had good soil under the sidewalk that did not heave.

Actually, pouring in February, you may have been pouring on heaved soil and the only problem would be settlement when the frost went out.
__________________
Dick

Engineer, designer and consultant recently active domestically and internationally on construction and design in about 35 countries.
concretemasonry is offline  
Old 02-11-2009, 07:23 PM   #4
New Guy
 
wurkn w amish's Avatar
 
Trade: landscaper
Join Date: Jan 2009
Location: millersburg, berlin ohio
Posts: 20

Re: Installing Patios And Walks In The Dead Of Winter In Massachusetts


as long as you excavate to proper depth and during that take out the frozen soil your good to go unless the crushed limestone base freezes in the back of your dump!
get your base down before freezing then you can lay brick whenever.
wurkn w amish is offline  
Old 02-12-2009, 01:17 AM   #5
Registered User
 
BNlandscaping's Avatar
 
Trade: landscaping/hardscaping
Join Date: Feb 2009
Posts: 6

Re: Installing Patios And Walks In The Dead Of Winter In Massachusetts


the guys on one crews i have did a wall in middle of feb and didnt get the frozen soil all out and when it become warm the wall settled down about 6 inches so had go back and redo it but most time dont have any problems jsut alittle bit more work getting through frozen dirt
BNlandscaping is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?