Temp. Pad For Hot Tub

 
Thread Tools Search this Thread Display Modes
Old 02-10-2007, 11:29 PM   #1
General Contracting
 
LNG24's Avatar
 
Trade: Real Estate Broker, Property Manager
Join Date: Oct 2005
Location: LaGrangeville, NY
Posts: 1,137

Temp. Pad For Hot Tub


Hye guys, Looking for advice here. I dug this pad today in 8" of frost. If you look closly, the pad is not even. That is because I cut from grade into the hill and I still have 8" of front at grade so if I removed the front I would be too low.

My plan is to pour a cement pad int he Spring, but just install a gravel base for now and set the hot tub on 2 sheets of plywood sitting on top of the gravel. I can drain it and remove it in the Spring when I go to pour.

My question is, if I decide to go with a Unilock style paver instead of a poured concrete slab, could I put that down in this weather now Remember that there will be settling in the Spring once the area that froze over thaws out. Well actually it dosn't make much of a difference now. I am sure I have a freeze by now on what I cut out too as it was freezing over as I cut it. All wet clay in that hill

Well I am open for suggestions. I just need to get the tub in place in the next few weeks. I will be returning in the Spring to extend the deck out and around 3 sides of the hot tub. Here are pics of the site.
Attached Images
   


Last edited by LNG24; 02-10-2007 at 11:31 PM.
LNG24 is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 02-10-2007, 11:59 PM   #2
Pro
 
jmic's Avatar
 
Trade: manager of excavation division
Join Date: Dec 2005
Location: danbury,ct.
Posts: 3,660

Re: Temp. Pad For Hot Tub


Dig,
IMO you would have to bury the first row of Uni locks anyhow so I would dig a footing for the uni lock wall allowing for the first row to be below finish grade and also allowing foe 6" min of a 3/4" stone footing. Would also be a good idea to have a couple bales of hay on hand to cover the footing area if you won't get it done in a day. Good luck.
__________________
___"Remember You Never Get A Second Chance To Make A First Impression"______________________
Joe
jmic is offline  
Old 02-11-2007, 05:25 AM   #3
New Guy
 
690E's Avatar
 
Trade: excavation
Join Date: Jan 2007
Location: Northern California mountains
Posts: 26

Re: Temp. Pad For Hot Tub


Seems like you could lay road base, then sand and set the tub on that forever. The tubs are pretty stiff and your ground should settle evenly. very few around here bother with cement.
690E is offline  
Old 02-11-2007, 09:36 AM   #4
Pro
 
jmic's Avatar
 
Trade: manager of excavation division
Join Date: Dec 2005
Location: danbury,ct.
Posts: 3,660

Re: Temp. Pad For Hot Tub


Dig,
I reread your post again and realized you were talking about unilock pavers and not retaining wall blocks sorry my mistake I should have gone to bed at 10, I think I was half asleep. But looking at your pics. you may need a wall. By the way nice Mini. Is that around 8000#'s?
__________________
___"Remember You Never Get A Second Chance To Make A First Impression"______________________
Joe
jmic is offline  
Old 02-11-2007, 11:26 AM   #5
General Contracting
 
LNG24's Avatar
 
Trade: Real Estate Broker, Property Manager
Join Date: Oct 2005
Location: LaGrangeville, NY
Posts: 1,137

Re: Temp. Pad For Hot Tub


Hi Joe,

No, that is just under 19,000#'s! Not sure if anything smaller would have made it through the frost.

I guess my real question is this, having never worked with unilock pavers ( I have only poured slabs before) I know that you usually put them on a crushed stone or sand base. My original thought was to place the 8 x 8 tub on a 10 x 10 concrete pad. The surrounding patio would then be pavers with a unilock wall holding back the cut. The deck would be extended on 3 sides of the tub to enclose it.

Since I will be dealing with a lot of water, I was thinking to make my temp. base out of 3/4" stone on filter fabric. Then in the Spring, Place another layer of fabric down and cover that with crushed stone and place the pavers on that.

Here is a sketch
Attached Images
 
LNG24 is offline  
Old 02-11-2007, 11:37 AM   #6
Pro
 
jmic's Avatar
 
Trade: manager of excavation division
Join Date: Dec 2005
Location: danbury,ct.
Posts: 3,660

Re: Temp. Pad For Hot Tub


Dig,
From what you're planning on doing it sounds like you have things under control.
__________________
___"Remember You Never Get A Second Chance To Make A First Impression"______________________
Joe
jmic is offline  
Old 02-11-2007, 12:26 PM   #7
Pro
 
ruskent's Avatar
 
Trade: Outdoor D/B
Join Date: Jun 2005
Posts: 1,884

Re: Temp. Pad For Hot Tub


With this cold weather i am sure there is still the ground. If there is front in the ground you can not install pavers properly. One of the most important parts is compacting the sub base which is the soil. If the ground is frozen you can not compact it.

Honestly i would just hold off 3-4 weeks for the frost to go away. There is no sense trying to rush things and then half to do it over down the road.

Matt
ruskent is offline  
Old 02-11-2007, 12:48 PM   #8
General Contracting
 
LNG24's Avatar
 
Trade: Real Estate Broker, Property Manager
Join Date: Oct 2005
Location: LaGrangeville, NY
Posts: 1,137

Re: Temp. Pad For Hot Tub


Quote:
Originally Posted by ruskent View Post
With this cold weather i am sure there is still the ground. If there is front in the ground you can not install pavers properly. One of the most important parts is compacting the sub base which is the soil. If the ground is frozen you can not compact it.

Honestly i would just hold off 3-4 weeks for the frost to go away. There is no sense trying to rush things and then half to do it over down the road.

Matt
Matt,

Frost won't be gone that soon! We had No Snow before the freeze so it is going deep. This is just a temp pad until I can do it right in the Spring. Just eneeded to know if I am better off leaving the 3/4" under the pavers for drainage or shoudl I remove it when I put the pavers down.
LNG24 is offline  
Old 02-11-2007, 01:06 PM   #9
Pro
 
tnmtn's Avatar
 
Trade: excavation, site work, hydroseeding
Join Date: Dec 2006
Location: northeast Tn.
Posts: 145

Re: Temp. Pad For Hot Tub


digger,
if you have to set it now you probably could go ahead on the gravel temporarily. after the weather warms a bit then come back and compact the gravel then go over the top with your crusher run or sand. a few inches at least.this then will have to be compacted and screeded as well. you might want to try www.pavingexpert.com for some more info. it is an engish site so there are some measurement issues but otherwise very good info.
good luck,
metin
tnmtn is offline  
Old 02-11-2007, 01:14 PM   #10
Member
 
fhdesign's Avatar
 
Trade: Construction, Landscaping
Join Date: Jan 2007
Location: Norwalk, CT
Posts: 96

Re: Temp. Pad For Hot Tub


digger,
I to would go ahead and use gravel, for a temporary pad, but I would skip the landscape fabric under the gravel, it may make it harder to compact in the spring.
Jon
fhdesign is offline  
Old 02-11-2007, 01:54 PM   #11
Pro
 
ruskent's Avatar
 
Trade: Outdoor D/B
Join Date: Jun 2005
Posts: 1,884

Re: Temp. Pad For Hot Tub


Gravel will work fine as a temp. base untill spring. But once spring comes around i would pull the gravel out, compact the sub base, then procede with the rest of the paver installation. Concrete pavers are the best type of pavement out there. If installed properly, they will look great and last forever. You just can't skip any steps.

Matt
ruskent is offline  
Old 02-11-2007, 10:24 PM   #12
DRIFTWOOD
 
Driftwood's Avatar
 
Trade: GEN CONTR.
Join Date: Feb 2004
Location: Bay Area
Posts: 803

Re: Temp. Pad For Hot Tub


4 " of 3/4" crushed stone,compacted. #4 rebar 16" o. c. both ways.

4" slab for hot tub, You" ll be happy.
Driftwood is offline  
Old 02-11-2007, 10:45 PM   #13
Pro
 
POOLMANinCT's Avatar
 
Trade: Swimming Pool Contractor
Join Date: Oct 2006
Posts: 2,165

Re: Temp. Pad For Hot Tub


if there is a wood skirt on the tub, just keep it out of contact
w/ dirt, plywood etc

just as you wood w/ wood fence panels..
POOLMANinCT is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
up to a 5C degree difference in temp skoka General Discussion 9 12-11-2006 05:58 PM
After service a change, what is best way for temp. connect of power RandyMc Electrical 14 10-03-2006 06:58 AM
Average duct temp MikeT HVAC 9 07-28-2006 06:21 AM
Takes 2 hours to raise temp 5 degrees???? rms8 HVAC 6 02-21-2004 05:50 PM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?