Temp. Pad For Hot Tub
Hye guys, Looking for advice here. I dug this pad today in 8" of frost. If you look closly, the pad is not even. That is because I cut from grade into the hill and I still have 8" of front at grade so if I removed the front I would be too low.
My plan is to pour a cement pad int he Spring, but just install a gravel base for now and set the hot tub on 2 sheets of plywood sitting on top of the gravel. I can drain it and remove it in the Spring when I go to pour. My question is, if I decide to go with a Unilock style paver instead of a poured concrete slab, could I put that down in this weather now Remember that there will be settling in the Spring once the area that froze over thaws out. Well actually it dosn't make much of a difference now. I am sure I have a freeze by now on what I cut out too as it was freezing over as I cut it. All wet clay in that hill Well I am open for suggestions. I just need to get the tub in place in the next few weeks. I will be returning in the Spring to extend the deck out and around 3 sides of the hot tub. Here are pics of the site. Last edited by LNG24; 02-10-2007 at 11:31 PM. |
|
|
|
|
|
#2 |
|
Pro
Trade: manager of excavation division
Join Date: Dec 2005
Location: danbury,ct.
Posts: 3,660
|
Re: Temp. Pad For Hot Tub
Dig,
IMO you would have to bury the first row of Uni locks anyhow so I would dig a footing for the uni lock wall allowing for the first row to be below finish grade and also allowing foe 6" min of a 3/4" stone footing. Would also be a good idea to have a couple bales of hay on hand to cover the footing area if you won't get it done in a day. Good luck.
__________________
___"Remember You Never Get A Second Chance To Make A First Impression"______________________ Joe |
|
|
|
|
|
#3 |
|
New Guy
Trade: excavation
Join Date: Jan 2007
Location: Northern California mountains
Posts: 26
|
Re: Temp. Pad For Hot Tub
Seems like you could lay road base, then sand and set the tub on that forever. The tubs are pretty stiff and your ground should settle evenly. very few around here bother with cement.
|
|
|
|
|
|
#4 |
|
Pro
Trade: manager of excavation division
Join Date: Dec 2005
Location: danbury,ct.
Posts: 3,660
|
Re: Temp. Pad For Hot Tub
Dig,
I reread your post again and realized you were talking about unilock pavers and not retaining wall blocks sorry my mistake I should have gone to bed at 10, I think I was half asleep. But looking at your pics. you may need a wall. By the way nice Mini. Is that around 8000#'s?
__________________
___"Remember You Never Get A Second Chance To Make A First Impression"______________________ Joe |
|
|
|
|
|
#5 |
|
General Contracting
Trade: Real Estate Broker, Property Manager
Join Date: Oct 2005
Location: LaGrangeville, NY
Posts: 1,137
|
Re: Temp. Pad For Hot Tub
Hi Joe,
No, that is just under 19,000#'s! Not sure if anything smaller would have made it through the frost. I guess my real question is this, having never worked with unilock pavers ( I have only poured slabs before) I know that you usually put them on a crushed stone or sand base. My original thought was to place the 8 x 8 tub on a 10 x 10 concrete pad. The surrounding patio would then be pavers with a unilock wall holding back the cut. The deck would be extended on 3 sides of the tub to enclose it. Since I will be dealing with a lot of water, I was thinking to make my temp. base out of 3/4" stone on filter fabric. Then in the Spring, Place another layer of fabric down and cover that with crushed stone and place the pavers on that. Here is a sketch |
|
|
|
|
|
#6 |
|
Pro
Trade: manager of excavation division
Join Date: Dec 2005
Location: danbury,ct.
Posts: 3,660
|
Re: Temp. Pad For Hot Tub
Dig,
From what you're planning on doing it sounds like you have things under control.
__________________
___"Remember You Never Get A Second Chance To Make A First Impression"______________________ Joe |
|
|
|
|
|
#7 |
|
Pro
Trade: Outdoor D/B
Join Date: Jun 2005
Posts: 1,884
|
Re: Temp. Pad For Hot Tub
With this cold weather i am sure there is still the ground. If there is front in the ground you can not install pavers properly. One of the most important parts is compacting the sub base which is the soil. If the ground is frozen you can not compact it.
Honestly i would just hold off 3-4 weeks for the frost to go away. There is no sense trying to rush things and then half to do it over down the road. Matt |
|
|
|
|
|
#8 | |
|
General Contracting
Trade: Real Estate Broker, Property Manager
Join Date: Oct 2005
Location: LaGrangeville, NY
Posts: 1,137
|
Re: Temp. Pad For Hot TubQuote:
Frost won't be gone that soon! We had No Snow before the freeze so it is going deep. This is just a temp pad until I can do it right in the Spring. Just eneeded to know if I am better off leaving the 3/4" under the pavers for drainage or shoudl I remove it when I put the pavers down. |
|
|
|
|
|
|
#9 |
|
Pro
Trade: excavation, site work, hydroseeding
Join Date: Dec 2006
Location: northeast Tn.
Posts: 145
|
Re: Temp. Pad For Hot Tub
digger,
if you have to set it now you probably could go ahead on the gravel temporarily. after the weather warms a bit then come back and compact the gravel then go over the top with your crusher run or sand. a few inches at least.this then will have to be compacted and screeded as well. you might want to try www.pavingexpert.com for some more info. it is an engish site so there are some measurement issues but otherwise very good info. good luck, metin |
|
|
|
|
|
#10 |
|
Member
Trade: Construction, Landscaping
Join Date: Jan 2007
Location: Norwalk, CT
Posts: 96
|
Re: Temp. Pad For Hot Tub
digger,
I to would go ahead and use gravel, for a temporary pad, but I would skip the landscape fabric under the gravel, it may make it harder to compact in the spring. Jon |
|
|
|
|
|
#11 |
|
Pro
Trade: Outdoor D/B
Join Date: Jun 2005
Posts: 1,884
|
Re: Temp. Pad For Hot Tub
Gravel will work fine as a temp. base untill spring. But once spring comes around i would pull the gravel out, compact the sub base, then procede with the rest of the paver installation. Concrete pavers are the best type of pavement out there. If installed properly, they will look great and last forever. You just can't skip any steps.
Matt |
|
|
|
|
|
#12 |
|
DRIFTWOOD
Trade: GEN CONTR.
Join Date: Feb 2004
Location: Bay Area
Posts: 803
|
Re: Temp. Pad For Hot Tub
4 " of 3/4" crushed stone,compacted. #4 rebar 16" o. c. both ways.
4" slab for hot tub, You" ll be happy. |
|
|
|
|
|
#13 |
|
Pro
Trade: Swimming Pool Contractor
Join Date: Oct 2006
Posts: 2,165
|
Re: Temp. Pad For Hot Tub
if there is a wood skirt on the tub, just keep it out of contact
w/ dirt, plywood etc just as you wood w/ wood fence panels.. |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| up to a 5C degree difference in temp | skoka | General Discussion | 9 | 12-11-2006 05:58 PM |
| After service a change, what is best way for temp. connect of power | RandyMc | Electrical | 14 | 10-03-2006 06:58 AM |
| Average duct temp | MikeT | HVAC | 9 | 07-28-2006 06:21 AM |
| Takes 2 hours to raise temp 5 degrees???? | rms8 | HVAC | 6 | 02-21-2004 05:50 PM |
| Go to Page... |