Sewer effluent pipe

I will be installing a new septic system at the local grain elevator soon so the Sanitarian and I met today to look the place over... The separation distances from the well put the secondary treatment field on the opposite side of the road that leads to the scale.... Loaded grain trucks will be crossing this every day at 80K gross weight. Pipe will probably lay about 2-2.5' below road grade. I generally pipe the effluent to the field with SDR-35 pipe but thats when I am messing up someones pristine lawn that never sees more weight than a lawn mower.... Will Schedule 40 be stout enough to take this kind of weight/traffic? If not, what's better? Thanks....

Williams Ex Co is online now   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 08-12-2009, 09:10 PM   #2
New Guy
Trade: site work/paving
 
Join Date: Jan 2009
Location: New Jersey
Posts: 24
We have done two different things in this situation. We have used schedule 80 pipe or encase the pipe in concrete. We have never had problems with either.
Gnella is offline   Reply With Quote
Old 08-12-2009, 09:16 PM   #3
Pro
 
dayexco's Avatar
Trade: entrepreneur of excavating expertise
 
Join Date: Mar 2006
Posts: 1,645
if you use sdr 35, and bed it with pearock to the top of the pipe, i wouldn't worry about it.
__________________
When the student is ready, the teacher will appear
[b]Do you teach the best what you need to learn the most?[b]
a few pics of our operation and equipment at http://s72.photobucket.com/albums/i182/dayexco/
dayexco is offline   Reply With Quote
Old 08-12-2009, 09:17 PM   #4
Pro
Trade: excavating
 
Join Date: Jul 2009
Location: upstate ny
Posts: 101
Or even concrete pipe no casting.
__________________
www.macdonoughexcavating.com
jmacd is offline   Reply With Quote
Old 08-12-2009, 09:19 PM   #5
Pro
Trade: excavating
 
Join Date: Jul 2009
Location: upstate ny
Posts: 101
I would think sdr35 2' down bedded would be good unless the area is real wet.
__________________
www.macdonoughexcavating.com
jmacd is offline   Reply With Quote
Old 08-12-2009, 10:12 PM   #6
Pro
Trade: General, Electrical, and Plumbing Contractor
 
Join Date: Feb 2007
Location: Portland, OR & Eatonville, WA
Posts: 722
Don't know what kind of codes, rules, etc. you have there.

But here the pipe has to be sleeved, meaning you double wall it by sliding it through some schedule 40 or 80 with ends sealed around inner pipe or encase in concrete. We have to do this anywhere the pipe will being driven over, even in a residential driveway or a drive to the barn in back of the house.
Kgmz is offline   Reply With Quote
Old 08-12-2009, 10:16 PM   #7
Member
Trade: septic installer, site work
 
Join Date: Nov 2006
Location: Vermont
Posts: 70
Around here the engineers like to sleeve the 4" pipe in 6" and then back fill with stone. Nothing like throwing a little money at it
guyute65045 is offline   Reply With Quote
Old 08-13-2009, 06:41 AM   #8
Pro
Trade: Carpenter
 
Join Date: Jan 2008
Location: Cape Ann Area, MA
Posts: 199
If you just need to beef it up under the road than I would go overkill. It isn't going to hurt the situation and for the amount of footage just to get under the road, you aren't talking about a lot of extra expense.
Morning Wood is offline   Reply With Quote
Old 08-13-2009, 08:20 PM   #9
Pro
Trade: Excavation, land clearing, sewer/water
 
Join Date: Dec 2007
Posts: 169
Thanks for the replies guys... I think I am going to go a little overkill on this one. My narrowest bucket is 13'' so I will use that to do away with as much soil disturbance as possible and leave less of a ditch for the trucks to drop into..... A couple yards of concrete will go a long ways in a narrow ditch. Part of my reasoning for this is that the same Co-Op has another site that needs a septic system and excavation for an addition, just wanting them to see that I wont cut corners.... Thanks again!
Williams Ex Co is online now   Reply With Quote
Old 08-13-2009, 09:15 PM   #10
Contractor
 
tgeb's Avatar
Trade: Excavation, Foundation, Concrete
 
Join Date: Feb 2006
Location: Maryland
Posts: 2,023
Paul, I think I would sleeve it 4 or 5' beyond the edges of the drive. That way if for what ever reason it needs to be replaced an new section of pipe can be pushed through without disturbing the drive surface.

Encasing in concrete might be good as long as the concrete is not poured to the surface. If the trucks run over the concrete and break it, the shear could bust your pipe. I would make sure I had a soil/stone buffer.

But if you really want to kill it, I would bed the pipe in stone in the 13" trench about 1 foot of cover, cut a 30" wide trench above that, pour 1 foot thick of reinforced concrete, then cover with stone or what ever pavement they are using.
__________________
Tom

www.gebcon.com
tgeb is offline   Reply With Quote
Old 08-21-2009, 05:57 AM   #11
Pro
Trade: underground
 
Join Date: Oct 2004
Posts: 3,045
Quote:
Originally Posted by Williams Ex Co View Post
Will Schedule 40 be stout enough to take this kind of weight/traffic? If not, what's better? Thanks....
I like the gasket joints on DR-35 pipe more than the solvent weld joints on SCH 40. They're easier to assemble properly and flexible. At shallow depths, and provided of course the pipe is bedded and backfilled properly, I'd be more concerned about the pipe being able to sustain some movement from freeze/thaw forces than I would anything else. A solvent weld joint is rigid and subject to cracking under stress - unlike an elastomeric gasket.

Also, pouring unreinforced concrete around stuff sometimes has its own issues; namely it tends to transfer loads directly to whatever's beneath/within it. If you have the flexibility to do so I'd say bury the pipe a foot deeper and forego the encasement.
__________________
Quote:
That's the way that the world goes 'round, you're up one day and the next you're down.
It's a half an inch of water and you think you're gonna drown, that's the way that the world goes 'round.
PipeGuy is offline   Reply With Quote
Old 08-21-2009, 04:51 PM   #12
Pro
 
dayexco's Avatar
Trade: entrepreneur of excavating expertise
 
Join Date: Mar 2006
Posts: 1,645
great to see your face around here again rick, hope all is well!
__________________
When the student is ready, the teacher will appear
[b]Do you teach the best what you need to learn the most?[b]
a few pics of our operation and equipment at http://s72.photobucket.com/albums/i182/dayexco/
dayexco is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Designing a dust-collection system for my shop: any problem using 6" pipe? Panzer5 Tools & Equipment 24 05-19-2009 09:34 AM
Allowed sewer pipe material smellslike$tome Plumbing 6 01-24-2008 11:30 AM
3" sewer pipe? elarofcrankcase Plumbing 6 02-28-2007 08:37 AM
Plugging sewer pipe that is to be retired personalt Plumbing 3 07-06-2006 11:16 PM
SDR 35 PVC sewer pipe lengths dayexco Excavation & Site Work 17 05-15-2006 09:58 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 11:26 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC