Rock Clause Price Per Foot
Im bidding on a 2 inch water line extention and the agreement calls for
a per foot rock clause, 3 feet deep. I know all about my cost of doing business being different from others, just looking for a little advice on what some might have used in the past, I'll make my own final price. thanks for any help. |
|
|
|
|
|
#2 |
|
Member
Trade: Grading, Excavating, Clearing, & Demo
Join Date: Nov 2006
Location: St. Louis, MO
Posts: 40
|
Re: Rock Clause Price Per Foot
Make sure you get paid for everything you break including overbreak. Just because it says 3 feet doesn't mean that you might not break 3.5 feet due to overbreak. This is especially true since your trench will be wider in rock versus dirt because you have to get the breaker inside the trench. Also make sure that you don't have to import any material to backfill the trench due to large amounts of overbreak.
Is this solid rock or just a seam of rock that goes up and down through the dirt? |
|
|
|
|
|
#3 |
|
Vagitarian
|
Re: Rock Clause Price Per Foot
For doing trenchwork in rock, excavation time is about 3-4 times slower than normal excavation, depending on what type of rock and how much of it. Take your hourly rate and mulitply it by 3 or 4 times to figure it out. Also, figure on a machine with a hammer and mobilization. Also, your excavated material may have to be exported and suitable backfill may have to be imported. Also, it may take more bedding material to protect the pipe.
__________________
Life is hard. It is harder when you are stupid Uncle Sam wants YOU....to speak ENGLISH |
|
|
|
|
|
#4 |
|
Contractor
Trade: Excavation, Foundation, Concrete
Join Date: Feb 2006
Location: Maryland
Posts: 3,278
|
Re: Rock Clause Price Per Foot
I don't know how in the world you could price it per foot.
Around here the rock we can get into varies so much, one site you can bump it with a hammer and it pops up no problem. Next site is sandstone or something that sucks the energy out of the hammer and it takes all day to get a 30' trench 4' deep broke out. Unless you have first hand knowledge of what is in the ground, right where you need a trench, and the previous experience to know how long it might take to get that particular material out of the way, you are rolling the dice. I would give them a cost basis type quote: If rock encountered it will cost $***.xx per hour/day for hydro hammer and $***.xx per hour/day for backhoe to remove said rock. Export of rubble and import of suitable fill will be charged at $***.xx per load. If it takes a month, you get paid, if it takes 1/2 day you get paid. I would not get trapped into a per foot cost on something with as many variables as rock can have.
|
|
|
|
|
|
#5 |
|
New Guy
Trade: excavating
Join Date: Feb 2006
Posts: 23
|
Re: Rock Clause Price Per Foot
Some things to think about, thanks for the help.
|
|
|
|
|
|
#6 |
|
DRIFTWOOD
Trade: GEN CONTR.
Join Date: Feb 2004
Location: Bay Area
Posts: 803
|
Re: Rock Clause Price Per Foot
These wise Men just saved Your A$$ ! Good luck Rocky: notworthy
|
|
|
|
![]() |