 |
10-04-2009, 04:26 PM
|
#1
|
|
Pro
Trade:
entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 1,645
|
let me hear your ideas.
as you know, we picked up 5 miles of 6" rural water line to install. i "know" how i want to do this, but i'd like to hear any of you guy's ideas/opinons. we have to pick up all the pipe at the water system's yard, haul, string, and install. they're very reluctant to allow us to take more than 3,000 feet at a time because of problems past with vandalism to the pipe. i'd like to have 3 guys doing nothing but hauling, stringing, shoving pipe together....the way they want to stage things, i don't think i can make that work. ideas?
|
|
|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury
or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Join the #1 Contractor Forum Today - It's Totally Free!
ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!
Join ContractorTalk.com - Click Here

|
10-04-2009, 04:43 PM
|
#2
|
|
Pro
Trade:
Framing
Join Date: Jan 2009
Location: Utica,NY
Posts: 517
|
Quote:
Originally Posted by dayexco
as you know, we picked up 5 miles of 6" rural water line to install. i "know" how i want to do this, but i'd like to hear any of you guy's ideas/opinons. we have to pick up all the pipe at the water system's yard, haul, string, and install. they're very reluctant to allow us to take more than 3,000 feet at a time because of problems past with vandalism to the pipe. i'd like to have 3 guys doing nothing but hauling, stringing, shoving pipe together....the way they want to stage things, i don't think i can make that work. ideas?
|
Was that specified in the bid package?
|
|
|
10-04-2009, 04:53 PM
|
#3
|
|
Pro
Trade:
entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 1,645
|
this "bid package"....was 3 pages long, including the proposal itself, specs, everything....it boils down to everybody being straight up, accommodating each other, getting the job done in a timely, workable manner for both parties. in reality, i can do anything i want...that's not my desire, my foot's in their door now, and i think it can turn into a great customer for us in the end depending on how things go. i just want a well executed project.
|
|
|
10-04-2009, 05:28 PM
|
#4
|
|
Vagitarian
Trade:
site and utility contractor
Join Date: Jan 2006
Location: Dallas, PA
Posts: 2,326
|
Have 1 load there the day before you start. Send 2 guys first thing in the morning with a trailer for a load. The 3rd guy can help in the morning to get you going. When they get back, all 3 unload the pipe and 2 stay to lay pipe, while the 3rd guy goes back for more and keeps shuttling.
__________________
Life is hard. It is harder when you are stupid
Uncle Sam wants YOU....to speak ENGLISH
|
|
|
|
The Following User Says Thank You to rino1494 For This Useful Post:
|
|
10-04-2009, 07:31 PM
|
#5
|
|
Pro
Trade:
entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 1,645
|
jason, my thoughts exactly!!!. hopefully, other than a few instances...nobody will be down in the ditch, will all be barred together, and barred down the hole. you've just confirmed what i think needs to happen...thanks for pushing a young man's blood into an old man's veins.
|
|
|
10-04-2009, 07:34 PM
|
#6
|
|
Pro
Trade:
Excavation
Join Date: Feb 2009
Location: Saginaw Michigan
Posts: 125
|
What kind of pipe are we talking about? What kind of vandalism has been experienced? Maybe they would let you stage the job out if you put yourself on the hook for replacing any pipe that gets vandalized? Cant say I have seen anything like that done here, unless it was done by an upset member of another company. I guess id like a little more on the type of pipe, and how you are going to stage it. Most of the time we have ductile, which we usually have to bag. So we stretch out enough to have the crew get going in the morning. Then the loader man continues to stage pipe out in between bringing the hoe sand, and backfilling the trench.
|
|
|
10-04-2009, 08:14 PM
|
#7
|
|
Pro
Trade:
entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 1,645
|
Quote:
Originally Posted by JDavis21835
What kind of pipe are we talking about? 6'"CLASS 200 pvc What kind of vandalism has been experienced? taking a 1/16th" drill bit, and punching holes in random lengths of pipe onsite....hard to detect unless you pressure test each length....in 5 miles of pipe, would take a looooooooooong time. Maybe they would let you stage the job out if you put yourself on the hook for replacing any pipe that gets vandalized? i refuse to accept responsibility for owner supplied material. Cant say I have seen anything like that done here, unless it was done by an upset member of another company. they're assuming it was done by an adjoining land owner who did not like rural water. I guess id like a little more on the type of pipe, and how you are going to stage it. Most of the time we have ductile, which we usually have to bag. So we stretch out enough to have the crew get going in the morning. Then the loader man continues to stage pipe out in between bringing the hoe sand, and backfilling the trench.
|
thanks for response
Last edited by dayexco; 10-04-2009 at 08:18 PM.
|
|
|
10-04-2009, 08:22 PM
|
#8
|
|
Vagitarian
Trade:
site and utility contractor
Join Date: Jan 2006
Location: Dallas, PA
Posts: 2,326
|
Just wondering Gene, do you have a fusion machine ?
BTW: Did you ever think up anything on those plans I mailed you ?
__________________
Life is hard. It is harder when you are stupid
Uncle Sam wants YOU....to speak ENGLISH
|
|
|
10-04-2009, 08:32 PM
|
#9
|
|
Contractor
Trade:
Excavation, Foundation, Concrete
Join Date: Feb 2006
Location: Maryland
Posts: 2,023
|
If they are supplying, the pipe can you make them supply it to you at the site?
Since they are the ones concerned about vandalism, why should you pay the price for not having pipe at your disposal to install as needed?
As you state, it's their pipe, how do you know it does not have holes in it already?
Maybe they will bring you what you need each day on trailers, take the excess back each night.
Actually, as I am thinking it through, why not stage pipe on a trailer, use it as needed, take the trailer home at night, so no pipe is left on site for the vandals.
If need be, rent an extra trailer that can be loaded while the other is on site.
You could work this to have an endless supply of pipe.
|
|
|
10-04-2009, 08:46 PM
|
#10
|
|
Pro
Trade:
entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 1,645
|
Quote:
Originally Posted by tgeb
If they are supplying, the pipe can you make them supply it to you at the site? no, my responsibility to haul, string, install
Since they are the ones concerned about vandalism, why should you pay the price for not having pipe at your disposal to install as needed?
As you state, it's their pipe, how do you know it does not have holes in it already? should any problems happen, they will take care of it vandalism wise....it's in our proposal...my concern is pounding this pipe in the ground, having zero problems, loving us so much, they call us half a dozen times a year for the mile, 2 mile jobs.
Maybe they will bring you what you need each day on trailers, take the excess back each night. no, it's our responsibility to pick it up
Actually, as I am thinking it through, why not stage pipe on a trailer, use it as needed, take the trailer home at night, so no pipe is left on site for the vandals. it's my guess, this is what'll have to happen...this job is 40 miles from home, we'll have to find a trusted place to leave it.
If need be, rent an extra trailer that can be loaded while the other is on site.
You could work this to have an endless supply of pipe.
|
thank you tom, i REALLY appreciate you taking time to gimme ideas!!!
|
|
|
10-04-2009, 08:49 PM
|
#11
|
|
Contractor
Trade:
Excavation, Foundation, Concrete
Join Date: Feb 2006
Location: Maryland
Posts: 2,023
|
Can you take it back to their yard?
|
|
|
10-04-2009, 09:15 PM
|
#12
|
|
Pro
Trade:
entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 1,645
|
i could, but that would be a headache too....we're working sunup/sundown....vandalism occurs, it'll be the little pipe we have strung, hanging out of the ditch..
|
|
|
10-05-2009, 04:37 PM
|
#13
|
|
Twisted Cameron
Trade:
Concrete, Metal buildings
Join Date: May 2009
Location: Yorkville Il
Posts: 89
|
Vandalism is a bitch, a buddy of mine's family has one of the largest excavating companies in western South Dakota. A few years back i remember they had someone get into one of thier haul trucks and run over a 100,000 dollars worth of pipe, As far as i know nobody ever got caught for the deed. Would it be worth having any kind of security overnight? Then you could just have all the material on site period. I don't know how many guys you have on staff, but I have seen this done to also protect equipment. How much do windows cost in excavators? Just a though however unconventional it may be.
|
|
|
10-05-2009, 05:01 PM
|
#14
|
|
Member
Trade:
excavating contractor
Join Date: Mar 2007
Location: South Dakota
Posts: 87
|
Gene- Is your boat long enough to haul that pipe? may need one if it doesn't stop raining.
|
|
|
10-05-2009, 05:28 PM
|
#15
|
|
Pro
Trade:
entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 1,645
|
Quote:
Originally Posted by backhoe1
Gene- Is your boat long enough to haul that pipe? may need one if it doesn't stop raining.
|
isn't this something? i'm so FREAKIN sick of this crap i could cry....oh well, giving me a chance to rebuild our sand bucket.
|
|
|
10-06-2009, 04:26 AM
|
#16
|
|
Registered User
Trade:
Excavating
Join Date: Oct 2009
Location: Adk. Mtns NY
Posts: 19
|
What are the conditions like? Are you getting roughly the same amount distance each day? After a few days, if your distances are somewhat consistant you could try bringing the same amount of pipe as you used the day before, thereby minimizing the amount that you protect/take back to the yard that night.
|
|
|
10-06-2009, 07:38 PM
|
#17
|
|
New Guy
Trade:
excavation
Join Date: Jan 2009
Posts: 28
|
Can you load a trailer/ truck with a the days worth of pipe. Do you have the room to work right off the trailer/ truck. Two guys in the hole laying pipe , one you hooking up pipe clamp / moving truck / trailer down with the pipe? Or two guys working with the machine laying stung out pipe one guy with another machine stringing pipe , then dropping back to backfill. What size machine are you going to be digging with?
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate This Thread |
Linear Mode
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|